Beacon how-to · November 2026

Analytics: what you can see and compare

A field guide to everything under the Analytics menu: the Dashboard, History and its four Synopsis reports, and the Analytics workspace with Build, Labor, Costing, Plan vs Actual and Billing. Who sees what, how each number adds up, and why the same word can mean two different numbers on two screens.

  • v2.197.0

Screenshots are from Beacon's test site. Every order, product and dollar amount in them is demo data. Numbers in the examples are example numbers unless the example says otherwise. This page is about reading numbers: nothing on it changes your data.

Read first: a day counts only once it is postedAt sites that run Checkpoint, a day's hours and units are posted when its Shift Review is submitted. Until then, the Daily Synopsis reads 0. The week, the month, By SKU and the Dashboard leave the day out. The weekly bill does not charge for it. How to submit the day.

1. Start here: the Analytics menu

Who: everyone who signs in. When: you want a number about work that is done, or a what-if before you commit to an order.

  1. At the top of Beacon, click Analytics. A second row of tabs opens under it.
  2. Click Dashboard, History or Analytics.
  3. On Analytics, click the tab you need. Each tab says the question it answers under its name.
The top bar with Production, Analytics and Admin. Analytics is selected, and the row under it shows Dashboard, History and Analytics. Below is the Analytics workspace: the bar with Source set to Material, Material DEMO-SKU-1, Target Qty 1000, and five tabs: Build, How many can we build; Labor, How long, how many people; Costing, What's the price; Plan vs Actual, Did we build to plan; Billing, What do we bill this week.
Fig. 1The Analytics menu, and the Analytics workspace: one bar on top, five tabs under it. Demo data.

Use it when you want to know…

Menu itemUse it when you want to know…
DashboardHow the site did over the days you pick, and how it trends: units, labor hours, labor cost, CPLH, productivity and build status.
HistoryWhat an order or a SKU did over a date range: units, hours, CPLH and cost. History is also the door to the four Synopsis reports.
History → SynopsisHow a day, a week (Monday to Sunday), a month or the year went, ready to print or email.
Analytics → BuildHow many units the stock you type in can make, and which item runs out first.
Analytics → LaborHow many labor hours, people or days an order needs.
Analytics → CostingWhat an order should cost by Beacon's standard, with or without a markup.
Analytics → Plan vs ActualWhether orders were built to plan, as the plan stood before the work started. Not switched on at any site yet.
Analytics → BillingWhat to bill the customer for a week (Bill). Which SKUs make or lose money at the customer's price, by week, month or quarter (By SKU).

Three more items can show. Executive Dashboard compares sites; only Executives and Super Admins see it. Labor Analyzer and Coverage Analyzer are for sites that load SAP coverage reports, and are switched off for a site that does not use them. Such a site plans in Build Schedule instead (Labor Planner and Coverage).

Who sees what

The menu shows what your role and site use. What you see inside each page is set by your role:

RoleDashboard, History, all 4 Synopsis reportsBuild, Labor, Plan vs ActualCosting and Billing (Bill, By SKU)Synopsis cost and marginSend a synopsis emailImport customer rates
ViewerYesYesNoNoNoNo
WorkerYesYesNoNoNoNo
LeadYesYesYesNoYesNo
Line CaptainYesYesYesNoYesNo
CoordinatorYesYesYesNoYesNo
AdminYesYesYesYesYesYes
ExecutiveYesplus Executive DashboardYesYesYesNoNo
Super AdminYesplus Executive DashboardYesYesYesYesYes
  • Synopsis cost and margin is the Cost and margin section of the Daily, Weekly and Monthly Synopsis. It shows only at sites that bill per unit.
  • The Daily also needs Cost and margin (totals and per-PO table) ticked in Settings → Email Settings → Daily Synopsis — what to show. The Weekly and Monthly have no such setting.
  • A site bills per unit when its Billing Model is Transactional. An Admin can check it in Settings → Labor Rates → Advanced → Billing Model.
  • Costing and Billing: an Admin can hide them from one person below Admin. See Costing No access below.
  • Send a synopsis email needs the Reports permission. An Admin can take it away from one person in Settings → Permissions. Executives see Send Email and Email this week, but Beacon refuses the send.
Dollars are not all behind one door
  • Daily, Weekly and Monthly Synopsis cost and margin: Admin and up, at sites that bill per unit.
  • Billing (Bill and By SKU), the Costing tab, Material Master → Costing with its saved quotes, and Plan vs Actual money: Lead and up.
  • The money on a SKU's page in Material Master, and the Dashboard's Billing tiles: every role.
  • History's Est. Cost, the Monthly's Labor Costs, Year to Date labor cost and the Dashboard's Est. Labor Cost: every role that opens them.

Costing No access: hide the money from one person

  1. An Admin opens Settings and clicks the Permissions tab.
  2. In User Permissions, find the person's row.
  3. In the Costing column, pick No access, then click Save Permissions.

It works only on people below Admin. Admins, Executives and Super Admins are never blocked. For that person it hides:

  • Analytics → Costing and Analytics → Billing (Bill, By SKU and the customer rates).
  • Material Master → Costing and its saved quotes.
  • The money on a SKU's page. The hours, crew and UPH stay.
  • The money in Plan vs Actual. The tab itself stays.
  • The Dashboard's Billing tiles: Billed Revenue, Margin and Revenue / Unit.

It does not hide History's Est. Cost, the Dashboard's Est. Labor Cost or the Monthly's Labor Costs. View only still shows all of it, but stops them saving quotes. Setting Reports to View only or No access stops them sending synopsis emails. It hides no report. More: Costing “No access”.

2. Dashboard: the site at a glance

Who: every role. When: you want the site's totals for a run of days, or the trend over a month or longer.

  1. Click Analytics → Dashboard. It opens on today and the 30 days before it.
  2. Click the date box next to Range. Pick Last 7 Days, Last 30 Days, Last 90 Days or Last Year, or click a start day and an end day in the calendar. Last 7 Days is today and the 6 days before it.
  3. Wait for Updating… to clear. There is no Apply button.
  4. Read the tiles under Production — Current Period. Most cover exactly the days you picked. A tile that still counts whole months says so under its number.
  5. Scroll for Trends (four charts), Top Performing Days (the best 5 days by CPLH) and Build Status Overview.

What the six tiles mean

TileWhat it means
Active BuildsOrders with status Open, In Process or On Hold. Pending and Allocated orders are not counted. Whole months.
Units CompletedUnits posted on the days you picked. The same count as the Daily, Weekly and Monthly Synopsis.
Labor HoursEvery hour posted on those days, all roles.
Est. Labor CostEach of those hours × its role's rate from Settings → Labor Rates, priced the same way as History. A role with its own rate, such as Line Captain, is priced at that rate. Labor only: no LTO/QA charge, no material.
CPLH (Units Per Labor Hour)Units ÷ the build hours of every role on those days, with changeover and start-up hours taken out. The same rule as Top Performing Days.
Productivity AverageA plain average of each order's productivity. A 10-unit order counts as much as a 3,000-unit order. Whole months.
Tiles that still count whole monthsActive Builds, Productivity Average and Build Status Overview still add up every calendar month the range touches. So do the optional build-count, Pallets Completed, material cost and combined cost tiles. Each says so under its number, for example Whole months: Nov 1 – Nov 30. Every other tile, the Trends charts and Top Performing Days follow the exact days you pick.
  • A day shows up only after it is posted. The page does not refresh itself, so reload it.
  • The Dashboard has no print, export or email.
  • An Admin chooses the tiles and their colours in Settings → Display Config → KPI Dashboard. Three tiles are gone. Efficiency always read 100.0%, and Top Performing Line always read N/A. Labor Total Hours was the same number as Labor Hours.
  • The Billing tiles (Billed Revenue, Margin, Revenue / Unit) use the locked price, not the customer's rate (why). Costing No access hides them.
Example numbers: is this month better than last?Set the range to October 1–31 and write down Units Completed and CPLH. Then set November 1–30. October: 30,000 units, CPLH 8.00. November: 33,000 units, CPLH 8.40. November built 10% more units (33,000 ÷ 30,000 = 1.10) and 0.4 more units per build hour (+5%). For a whole month, Units Completed, Labor Hours and Est. Labor Cost match the Monthly Synopsis. CPLH does not: the Monthly divides by assembly hours and keeps changeover in (why). More: the Dashboard covers the days you pick.

3. History: look up past orders and SKUs

Who: every role. When: you want to know what an order, a SKU or a run of days did.

History lists orders. For a whole day, open the Daily Synopsis instead (section 4).

Steps

  1. Click Analytics → History. It opens on the last 10 days.
  2. Set the two dates next to Range and click Apply.
  3. Or click a quick filter: Last Week, Last 30 Days, High Performance (CPLH 50 or more) or Low Performance (CPLH 20 or less). More adds Production Builds, Non-Production Builds and Large Orders (1000+). Last Week means today and the 7 days before it, not last Monday to Sunday. Last 30 Days means today and the 30 days before it. Both reset the Range dates. Any quick filter clears the other filters you set; the search text stays.
  4. To find one order or SKU, type it in the box Search PO, material, item....
  5. To narrow further, click Filters. You can filter by status, order type, material, PO, customer, line, quantity, labor type, role, worker, hours and CPLH.
  6. Read the tiles: Builds, Units, Hours, CPLH, Cost and Workers.
  7. Click Details on an order to open Build Details: hours by role, labor cost and every hour log. Its Est. Labor Cost is the same figure as the card's Est. Cost. It has its own Export.
  8. To keep the list, click Actions → Export CSV.
History on a demo site. The Range dates and Apply button, the search box, the quick filters Last Week, Last 30 Days and High Performance, and the tiles Builds 2, Units 121, Hours 2.2h, CPLH 54.75 and Cost $49.50. The Synopsis menu is open with Daily Synopsis, Weekly Synopsis, Monthly Synopsis and Year to Date. Two demo order cards are below.
Fig. 2History: the range, the quick filters and the tiles. The Synopsis menu (open here) holds the four reports. Demo data.

What the numbers mean

  • Units: units posted on the days in your range. When the range holds only part of a longer order, the card shows that part out of everything the order has built so far, for example 77 of 154. The second number is units built, not the order quantity.
  • Hours and Cost: every hour posted in the range, all roles. Cost is hours × the role rates. A role with its own rate, such as Line Captain, is priced at that rate. No LTO/QA charge is added.
  • CPLH: units ÷ the build hours of every role, with changeover and start-up taken out. It is not the Synopsis number (why).
  • Workers (the tile and the table column): how many different names are on the hour records. At sites that post hours by role (one record for Temp Worker, one for Line Captain), that counts role labels, not people. On an order card, Workers is the order's average crew when its records carry a headcount, so the card and the tile can disagree. For crew size, use the card or the Synopsis headcount.
  • Material Performance Analytics (closed until you click it): one row per material with Builds, Total Units, Total Hours, Avg, Best and Worst CPLH, and Avg Cost/Build. Click a material to filter the list to it.
At sites that log by roleAn Admin can add more columns to the History table (Settings → Display Config → History). The Lead Hours, MH Hours (material handler) and QA Hours columns count only hours logged under the roles VAS Lead, VAS Material Handler and VAS QA. Ryder Hours counts only hours logged as Ryder labor. Where hours are posted as Temp assemblers and Line Captains, those columns read 0, and Line Captain hours are in none of them.
Example numbers: how did SKU A run over the last 30 days?Click Last 30 Days and type SKU A in the search box. Four orders, 6,000 units. Their build hours were 700, and 30 of those were changeover and start-up (History does not show this split). CPLH = 6,000 ÷ (700 − 30) = 8.96. Units ÷ the Hours tile comes out lower, because Hours keeps every hour. Open Material Performance Analytics and click SKU A to see its best and worst order.

4. The four Synopsis reports

Who: every role can open them. When: after a shift, at week end, at month end, and for the quarter or the year.

All four live in History → Synopsis. Each has its own date picker; History's range does not carry over.

ReportCoversMoney on itPrint and email
Daily SynopsisOne day.Cost and margin per order: Admin and up, at sites that bill per unit.Print, Export PDF. Send Email (Lead and up, not Executive).
Weekly SynopsisMonday to Sunday.Cost and margin per PO: Admin and up, at sites that bill per unit.Print. Email this week (Lead and up, not Executive).
Monthly SynopsisOne calendar month.Labor Costs: every role. Cost and margin per SKU: Admin and up, at sites that bill per unit.Print, Export → Export to PDF. No email button here.
Year to DateJanuary to this month (all 12 months for an earlier year), by month and by calendar quarter.Labor cost only.Print, Export → Export to PDF.

Daily Synopsis

  1. History → Synopsis → Daily Synopsis. It opens on today.
  2. Change Select Date to the day you want.
  3. Read the note at the top, if there is one. Not submitted means the Shift Review is not in: the figures stay at 0 or short and Send Email is off. Submit the day first. Reopened means the figures can still change. Nothing posted means no hours were posted that day; Send Email is off.
  4. Read the tiles, then the Shift Review table and the sections under it.
  5. Admins at a site that bills per unit: scroll to Cost and margin.

How it adds up

  • Total Hours: every hour posted that day.
  • Units per assembly hour: units ÷ assembly hours, with start-up taken out. Changeover stays in. On a day with no Checkpoint it is called Average CPLH.
  • Overall Productivity: how the day's SKUs did against their rate, weighted by hours. The target is 100%.
  • Total Headcount: the Shift Review headcount, once the day is submitted.

Cost and margin (Admin and up)

Three costs and two margins for each order that ran that day:

  • Planned Cost: Beacon's quote for the units built: the SKU's steps plus the LTO/QA planned for the run's hours. Before markup, with no case material.
  • Actual Cost: posted hours × role rates, plus the LTO/QA for the order's run.
  • Customer Billing Cost: units × the customer's rate.
  • Actual vs Planned Margin = Planned − Actual. Its % is ÷ Planned.
  • Actual vs Customer Billing Margin = Customer Billing − Actual. Its % is ÷ Customer Billing.
Cost and margin in the Daily Synopsis. Tiles: Planned Cost $5,928.47, 3 of 3 orders; Actual Cost $6,250.18; Customer Billing Cost $7,350.00, 2 of 3 orders; Actual vs Planned Margin minus $321.71; Actual vs Customer Billing Margin plus $2,398.38. A yellow note says one order was left out for having no customer rate. The table starts with DEMO-0001 on line 4A, SKU DEMO-SKU-1: Planned $3,110.62, Actual $2,806.61, Customer Billing $4,950.00, margins plus $304.01 (9.8%) and plus $2,143.39 (43.3%).
Fig. 3Cost and margin: five tiles, a note on what was left out, then one row per order. Demo data.
Check one row by hand (Fig. 3)DEMO-0001: Planned $3,110.62, Actual $2,806.61, Customer Billing $4,950.00. Actual vs Planned: 3,110.62 − 2,806.61 = +$304.01, which is 9.8% of Planned. Actual vs Customer Billing: 4,950.00 − 2,806.61 = +$2,143.39, which is 43.3% of Customer Billing.

A dash means unknown, never $0; hover it for the reason. Each total adds only the orders that have that figure, and says how many (2 of 3 orders). More: Daily Synopsis: cost and margin.

Weekly Synopsis

  1. History → Synopsis → Weekly Synopsis. It opens on last week, Monday to Sunday.
  2. Use the ‹ and › arrows to change the week. You can go forward only as far as this week.
  3. Read Posted days: N of 7 under the dates.
  4. In Day by day, check each day's Status: Submitted, Reopened, Posted or Nothing posted. A day whose Shift Review is not submitted also shows Nothing posted, and Email this week is not blocked. Submit those days before you email the week.
  5. Read the tiles, then By SKU, By line, Work orders and Labor.
  6. Admins at a site that bills per unit: read Cost and margin, right after Work orders.
Weekly Synopsis for the week of Monday 10/12 to Sunday 10/18/2026. Previous and next week arrows, Print and Email this week buttons. Posted days 4 of 7. Tiles: Units 820, Hours 390.0, CPLH 2.3, Productivity 21.5%, Pallets about 58.4, People avg 12.3, peak 17 per day worked.
Fig. 4The Weekly Synopsis: week arrows, Print, Email this week, and the week's tiles. Taken on an earlier version: the CPLH tile now says Units per assembly hour. Demo data.

How it adds up

  • Each day is that day's Daily Synopsis. The week adds the days up.
  • Units, hours and pallets are sums.
  • CPLH and Productivity are worked out from the week's totals, not averaged across the days.
  • People shows the average and the peak per day worked. It is never added up.
  • It shows By SKU, By line and Work orders even if your site hides those parts of the Daily.
  • Coordinators and above also see Fixes this week. The Plan vs actual section stays empty (No graded days this week.) until Plan vs Actual is switched on.
Example numbersMonday built 400 units in 50 assembly hours (8.0 an hour). Tuesday built 100 in 25 (4.0 an hour). The week's CPLH is 500 ÷ 75 = 6.7, not the average of the two days (6.0), because Monday was twice as long.

Cost and margin (Admin and up, sites that bill per unit)

  • The Daily's five tiles come first. Then one row per PO: its lines, the days it ran, its SKU, the three costs and the two margins. A Total row matches the tiles.
  • Each figure is the week's Daily cost tables added up. A PO-day is one PO on one day: one row of a Daily. A PO that ran Monday and Tuesday is two PO-days.
  • A total adds only the PO-days that have that figure, and says how many (4 of 5 PO-days). A dash means unknown, never $0.
  • A yellow line names each day a line ran but nothing was posted. Those days carry no money until their Shift Review is submitted.
  • Below Admin the section is not there.
Cost and margin in the Weekly Synopsis for a demo week. A note names Thu 11/19 as not posted. Tiles: Planned Cost $10,280.25, 5 of 5 PO-days; Actual Cost $10,539.19, 5 of 5; Customer Billing Cost $14,480.00, 4 of 5; Actual vs Planned Margin minus $258.94; Actual vs Customer Billing Margin plus $5,833.61, 40.3%. Rows: DEMO-2471 on line 4A, Mon and Tue, SKU DEMO-SKU-1; DEMO-2473 on 4B, Wed, DEMO-SKU-2, with no Customer Billing; DEMO-2472 on 6A, Mon and Tue, DEMO-SKU-3. Then the Total row.
Fig. 5The Weekly's Cost and margin: five tiles, a note on what was left out, then one row per PO. Demo data.
Check the Total by hand (Fig. 5)DEMO-2473 has no customer rate, so the customer margin leaves it out. It adds the other two POs: 14,480.00 − (5,613.22 + 3,033.17) = +$5,833.61, which is 40.3% of Customer Billing. It is not 14,480.00 − 10,539.19, because that Actual includes DEMO-2473.

Monthly Synopsis

  1. History → Synopsis → Monthly Synopsis. It opens on this month.
  2. Pick another month in Select Month if you need one.
  3. Read Overview, Labor Breakdown, Labor Costs, Production and Work Orders Summary, then Daily Breakdown.
  4. Admins at a site that bills per unit: read Cost and margin, right after Work Orders Summary.
  5. For a copy to keep or send, click Print, or Export → Export to PDF.
Monthly Synopsis for November 2026 on a demo site. Select Month, Print and Export. Overview tiles: 3 working days, 18.0 average headcount per day, 235.1 total hours, 715 total units, 3.6 average CPLH. Labor Breakdown below.
Fig. 6The Monthly's Overview. Demo data.
  • The Monthly's hours, units and labor cost are its own calculation over the calendar month. Its Cost and margin is the month's Daily cost tables added up.
  • Avg CPLH uses the same rule as the Daily. Headcount is an average per working day, never a sum.
  • Work Orders Summary shows Work Order, Item, Units, Hours, HC and Lines. It has no money columns.

Cost and margin (Admin and up, sites that bill per unit)

  • One row per SKU, with how many POs it had that month. Orders with no single SKU share one row at the bottom.
  • The same five tiles, three costs and two margins as the Weekly (Fig. 5). Each total says how many PO-days it covers.
  • Posted days: N of M sits at the top. A yellow line names each day a line ran but nothing was posted.
  • It replaced the old Billed, Actual Cost and Margin columns. Below Admin, the Monthly's only money is Labor Costs.
  • Print and Export to PDF carry it. The Excel export and the month-end email do not.
Export to Excel is hours and labor costThe Excel file has hours, cases and labor cost per PO. It has no Billed or Margin columns. Bill from Billing → Bill. For the month's cost and margin, use the Monthly's PDF (its Cost and margin table, Admin and up) or By SKU's Export margin. At a site that bills per unit, only Admins and up can export the Excel file.

For a month at the customer's price you can also use Billing → By SKU → Month (worked question).

Year to Date

  1. History → Synopsis → Year to Date. It opens on this year.
  2. Select Year offers this year and the five before it.
  3. Use the tabs: Overview, Monthly Breakdown, Quarterly and Top Materials.
  4. For a copy, click Print, or Export → Export to PDF. Print prints the tab you have open.
Year to Date Synopsis for 2026 on a demo site. Select Year shows 2026 (Current). Tabs: Overview, Monthly Breakdown, Quarterly, Top Materials. Overview tiles: 10 working days, 11.2 average headcount, 640.1 total hours, 9,115 total units, 14.2 average CPLH.
Fig. 7Year to Date, Overview tab. Demo data.
  • For this year, it runs the Monthly for each month from January to this month and adds them up. This month is only part done. For an earlier year, it runs all 12 months.
  • Quarterly uses calendar quarters: Q1 is January to March, Q2 April to June, Q3 July to September, Q4 October to December.
  • Money is labor cost only. There is no billing or margin anywhere in Year to Date, quarters included. For a quarter's margins, use Billing → By SKU → Quarter.
  • The Excel export's Summary sheet has Avg Headcount, the same figure as the screen. It has no Total Headcount row.

Print and email

To print or save any of the four reports:

  1. Allow pop-ups for Beacon in your browser.
  2. Click Print. On the Daily you can also click Export PDF.
  3. In the window that opens, print it, or choose Save as PDF.
  • Daily email: Send Email (Lead and up, not Executive) stays off until the day is posted. It goes to the list in Settings → Email Settings. The email carries Cost and margin only when an Admin sends it; otherwise one line says so.
  • Weekly email: Email this week (Lead and up, not Executive) goes to the same list. At a site that bills per unit, it carries Cost and margin, last, only when an Admin sends it. When anyone else sends it, it ends with Cost and margin are included only when an Admin sends this email. Because an Admin's email carries the money, put only people who may see it on the list.
  • Monthly and Year to Date: Print opens the report in its own window, like the Daily and Weekly. Export → Export to PDF saves a file. The Monthly's Print and PDF carry Cost and margin when an Admin makes them. History has no email button for either.
  • Month-end email: in the last 3 days of the month, Build Schedule shows a Month End Closeout banner. Click Close Out Month (Lead and up, with the Reports permission). It always sends this month so far. It includes labor costs, but no Cost and margin.

Shift Review can also send the Daily when the day is submitted (submit the day).

5. The Analytics workspace

Who: everyone for Build, Labor and Plan vs Actual; Lead and up for Costing and Billing, unless your Costing is set to No access. When: before you commit to an order, and every week for the bill.

The bar on top drives Build, Labor and Costing:

  1. Click Analytics → Analytics.
  2. Leave Source on Material.
  3. Pick the SKU in Material. Typing jumps to a match.
  4. Type the order size in Target Qty (Units). It starts at 1,000.
  5. Click a tab. The bar keeps your pick when you switch tabs, and clears when you reload the page.

Build and Labor save nothing. Costing saves only when you press one of its Save buttons. Plan vs Actual and Billing have their own controls and hide the bar.

Build: how many can we build?

  1. Pick the Material and Target Qty, then click Build.
  2. Each item in the SKU's contents list shows Pcs Needed and Pcs/Case. They fill in from Material Master.
  3. Type the cases you have in Cases Available, for every item. Build does not read stock: it uses only what you type.
  4. Click Calculate Maximum Units. If you change a box, click it again.
  5. Read Maximum Units You Can Build, the item it is Limited by, and Buildable in full or Short by N units against your Target Qty.
Build tab for Demo product 16, target quantity 500. One item, DEMO-CANDY-1: 13.2 pieces needed, 6000 pieces per case, 2 cases available. Result: Maximum Units You Can Build 909, limited by DEMO-CANDY-1, ordered quantity 500, buildable in full.
Fig. 82 cases of 6,000 pieces at 13.2 pieces a unit make 909 units. The order is 500, so it is buildable in full. Demo data.

Each item allows cases × pieces per case ÷ pieces per unit, rounded down. The smallest answer wins. More: Build, step by step. For what is on hand, use your stock report or the planner's stock snapshots.

Labor: how long, how many people?

  1. Pick the Material and Target Qty, then click Labor.
  2. Check Hours per Day (per worker). It starts at 8.
  3. Under Calculate By, click Workers, Days or Target Date.
  4. Type the workers you have or the days you have, or pick the date.
  5. Results appear as you type: Days Needed (or Workers Needed), Labor Hours, Hrs / Worker, Estimated Completion and the Production Summary.
Labor tab. Calculate By Workers, 10 workers available. Days Needed 2 with 10 workers, Labor Hours 124.0 total hours needed, Hrs per Worker 12.4, Estimated Completion 11/21/2026. Production Summary: Total Units 1,000, CPLH 8.6, Hours per Day 8h, Build Steps (pre/post) 7.7h, Total Labor Hours 124.0h.
Fig. 91,000 units with 10 workers at 8 hours a day: 124.0 labor hours, 2 days. Demo data.
Check the math (Fig. 9)Labor hours = units ÷ CPLH + build steps. 1,000 ÷ 8.6 = 116.3, plus 7.7 hours of pre/post-build steps = 124.0 hours. Ten workers × 8 hours = 80 hours a day. 124.0 ÷ 80 = 1.55, rounded up to 2 days. Hrs / Worker = 124.0 ÷ 10 = 12.4.
The Labor tab uses the stored rateThe CPLH here is the Units/Hr stored on the SKU. Costing, Material Master and the planner time the work from the SKU's steps instead. If the SKU's Rate in force says Not reviewed, the two can be far apart, and this tab will not match Costing. Check it in Material Master → the SKU → Costing → Rate in force (what the states mean).

Costing: what's the price? (Lead and up)

  1. Pick the Material and Target Qty, then click Costing.
  2. The Movement Profile is the list of steps on the left. Leave it alone for a normal quote. A change there changes this quote only, not the SKU.
  3. For a price with markup, type it in Markup % (Optional). Some groups fill it in for you.
  4. Click Calculate. Click it again after you change the bar or come back from another tab.
  5. Read the headline: Total Estimated Cost, or Total Quoted if you typed a markup. Then read Pallets, Cost / Unit, Cost / Pallet and Headcount. At a site with shift roles, this tile reads Headcount (engineered). Otherwise it reads just Headcount. It is the crew size Beacon's standard calls for. The h run under it is how long that crew takes. Then read the Cost Breakdown.
  6. To keep it, name it in Quote Name (Optional) and click Save to Archive. Saved quotes are listed in Material Master → Costing → Saved quotes.
  • Cost / Unit and Cost / Pallet include the markup.
  • The quote works out the hours from the SKU's steps. It adds the site's Indirect labour %, an extra share of hours on top of the steps. An Admin sets it in Settings → Labor Rates → Advanced. The quote also charges the LTO for one full shift per order.

More: Costing, step by step, and counts, cases per pallet and the captain's whole run.

Plan vs Actual: did we build to plan?

Not switched on yetPlan vs Actual is not switched on at any site yet. The tab is empty everywhere, and the Weekly Synopsis's Plan vs actual section says No graded days this week.

Once it is on, it compares each order with the frozen plan. The frozen plan is the Labor Planner as it stood a set number of hours (Freeze hours) before each planned block was due to start. It shows Built %, hours against the standard, and verdicts such as Short, Over standard and Late. Its weeks run Monday to Sunday, and only submitted days count. Its money columns (Lead and up, at sites that bill per unit) use the locked price, like the Dashboard's Billing tiles. Costing No access hides them.

An Admin turns it on in Settings → Display Config → Labor Planner → Shift Window. Under Plan vs Actual tracking, click Start tracking. It is one-way: once started, it cannot be switched off. How it works: Plan vs Actual tracking.

Settings, Shift Window panel. Under Plan vs Actual tracking it says Not tracking, with a Freeze hours box and a Start tracking button.
Fig. 10Where the switch is, before tracking starts. Demo site.

Billing: the weekly bill (Lead and up)

  1. Click the Billing tab. It opens on Bill and on the week that has today in it.
  2. Weeks run Sunday to Saturday and are named by the Saturday: Week ending 11/21/2026. Use ‹ and › to change week.
  3. Read the table, one row per order. Rate is the customer's rate. Produced Quantity is the units posted in Shift Review that week. Charge = quantity × rate. Total Weekly Charges adds the rows that have a rate.
  4. Read Warnings and fix what it lists (table below).
  5. Click Export to Excel. The file has a Bill sheet and a Warnings sheet. Keep it: the screen is worked out again every time you open it, so it changes if a day is re-posted.
Billing tab, Bill view, week ending 10/31/2026. Import customer rates and Export to Excel buttons. Settings card with Customer PO, Title and Location code, all blank, and Save settings. The table has two demo orders, DEMO208 and DEMO211, on line 1A with 1,600 units each and no item, rate or charge. Total Weekly Charges $0.00. Warnings: No rate (2), Not posted (1), No material (2), Missing settings (1).
Fig. 11A demo week: two orders with no SKU, so no rate and no charge, and four kinds of warning. Demo data.
WarningWhat it meansWhat to do
No rateThe SKU has no customer rate, or the order has no SKU. The row has no charge and is left out of the total.An Admin imports the rate (below), or fix the order's SKU.
Not postedCheckpoint holds units for an order that were not posted in Shift Review.Submit or re-post that day's Shift Review, then open the bill again.
Over the orderMore units have been posted, all time, than the order quantity.Check the counts and the order quantity.
No materialPosted units with no build in Beacon, or a SKU that is not a Beacon material.Fix the order or the SKU in Build Schedule or Material Master.
Missing settingsThe Customer PO or Location code is blank.Type them in the settings card and click Save settings (Lead and up).
Conflicting buildsThe order has builds for different SKUs. The bill uses one of them.Check which SKU is right.
Not finishedAn order due this week has fewer units posted than ordered. Information only.Nothing to fix on the bill.

Billing: margin by SKU for a week, a month or a quarter (Lead and up)

  1. On the Billing tab, click By SKU.
  2. Click Week, Month or Quarter. Use ‹ and › to change the period. The label names it: Week ending 11/21/2026, November 2026 or Q4 2026 (Oct–Dec).
  3. Read Posted days: N of M. A yellow line names each day a line ran but nothing was posted. Submit that day's Shift Review, then open the period again.
  4. Read one row per SKU. Rows flagged Losing money (red) and Billing 40%+ over Actual (amber) sit at the top. Click a column heading to sort by it.
  5. Click the arrow on a row to see the POs behind it.
  6. Hover a dash to see why it is blank, for example no customer rate.
  7. Click Export margin to save the table and its POs to Excel. Keep it inside the company. Never send it to the customer: the customer gets the Bill.
Billing, By SKU, with Week picked: week ending 11/21/2026. Posted days 3 of 7, and a yellow line naming Thu 11/19 as not posted. Three demo SKUs with Units, Hours worked, Standard hrs, % of standard, Planned Cost, Actual Cost, Customer Billing Cost and the two margins. DEMO-SKU-1 and DEMO-SKU-3 are flagged Billing 40%+ over Actual. DEMO-SKU-2 has no customer rate, so its Customer Billing is a dash. A Total row with PO-day counts, and notes under the table.
Fig. 12By SKU for a demo week. Two SKUs are flagged Billing 40%+ over Actual. One has no customer rate. Demo data.
ColumnWhat it means
Hours workedEvery hour posted on the SKU's POs in the period, all roles.
Standard hrs (Beacon steps)What the SKU's steps say those units take, including the pre/post-build steps.
% of standard(Hours worked − changeover − start-up) ÷ standard hours. Over 100% means it took more hours than the standard.
Planned CostBeacon's quote before markup: the Daily's Planned Cost for the same units. It used to be called Engineered cost.
Actual Cost (incl. LTO/QA)Posted hours × role rates, plus the LTO/QA for each line's run that day.
Customer Billing CostUnits × the customer's rate. It used to be called Billed.
Actual vs Planned MarginPlanned − Actual, with its % of Planned under it.
Actual vs Customer Billing MarginCustomer Billing − Actual, with its % of Customer Billing under it. It used to be called Margin $.
FlagLosing money: Customer Billing is below Actual. Billing 40%+ over Actual: Customer Billing is at least 1.4 × Actual, which is a margin of 28.6% or more.
Check one row by hand (Fig. 12)DEMO-SKU-3: Planned $2,763.36, Actual $3,033.17, Customer Billing $4,800.00. Actual vs Planned: 2,763.36 − 3,033.17 = −$269.81, which is −9.8% of Planned. Actual vs Customer Billing: 4,800.00 − 3,033.17 = +$1,766.83, which is 36.8% of Customer Billing. It is flagged because 4,800.00 is 1.58 × 3,033.17.
  • Week is Sunday to Saturday, named by its Saturday: the bill's week. Month is a calendar month. Quarter is a calendar quarter: Q1 is January to March.
  • Each figure is the period's PO-days added up by the Daily Synopsis's rules. A week's rows match its seven Dailies.
  • Customer Billing is rounded per PO-day, the Bill per PO-week. So the two can differ by up to a cent per PO-day. The Bill stays the invoice.
  • Markup % and Quote markup % are no longer on screen. Export margin still has them.
  • Orders with no single SKU, such as non-production work, share one row at the bottom.

More: Margins for a week, a month or a quarter.

Import customer rates (Admin)

  1. On the Billing tab (Bill or By SKU), click Import customer rates.
  2. Choose the customer's rate workbook (.xlsx). It needs a column headed SKU and a column headed Correct Rate (or Rate).
  3. Read the preview: how many rates will change, are new, are unchanged, conflict, or are refused.
  4. Click Import N rates. Only changed and new rates are written. Nothing is deleted, and conflicting duplicates are not imported.

New rates show on the Bill, on By SKU and in the Daily's Customer Billing Cost the next time each is opened, past weeks included.

6. Same word, different number

Several screens use the same word for different numbers. None of them is wrong: each answers a different question. When two screens disagree, find the word here before you dig.

WordWhereWhat it means thereWhy another page differs
BilledBill (Charge). Daily, Weekly, Monthly and By SKU (Customer Billing Cost).Units × the customer's rate, from the workbook an Admin imports.The locked-price figures use another price (next row). A period's Customer Billing can differ from the Bill by a cent per PO-day.
Billed (locked price)Plan vs Actual (Revenue), the Dashboard's Billing tiles, the Executive Dashboard's Billed RevenueUnits × the price per unit locked when the order first posted. That price is the SKU's Negotiated price / unit if one is set in Material Master, else Beacon's own quote. Beacon's quote includes case material and any group markup.It is not the customer's rate, so it can sit far above or below the bill (example).
Actual costDaily, Weekly and Monthly (Actual Cost), By SKU (Actual Cost incl. LTO/QA)Posted hours × role rates, plus the LTO/QA for the order's run. One line never pays more than one paid shift of LTO in a day.History's Est. Cost, the Dashboard's Est. Labor Cost and the Monthly's Labor Costs tiles are hours × rates only, with no LTO/QA. They read lower.
PlannedDaily, Weekly, Monthly and By SKU (Planned Cost): the same number. By SKU called it Engineered cost until v2.196.0.Beacon's quote for the units built: the SKU's steps plus the LTO/QA planned for the run's hours. Before markup, with no case material.The Costing tab's total can add a markup. It includes material cost unless you switch Include material cost off. It charges the LTO for one full shift per order instead of for the run's hours. So the two can differ.
MarginDaily, Weekly, Monthly and By SKU: two margins, each with a %. Export margin also has Markup % and Quote markup %.% = margin ÷ the column it is measured against. Markup % = Customer Billing ÷ Actual − 1.The same dollars give two different percents (example). The Dashboard's and Plan vs Actual's Margin use the locked price.
WeekWeekly Synopsis (its Cost and margin too), Plan vs Actual: Monday–Sunday. Bill and By SKU's Week: Sunday–Saturday. History's Last Week: today and the 7 days before it. The Dashboard's Last 7 Days: today and the 6 days before it.Four different weeks.A Sunday shift sits in two different weeks (example).
HoursPlanner block, Checkpoint target, Material Master, Costing, Labor tabEach counts different work: the line run only, or the line run plus pre/post-build steps.The same order can show 4.7 h and 5.08 h (worked example). Material Master's Clock Hours and the planner's block panel now say which part is which.
Productivity, Efficiency, % of standardSynopsis, Dashboard, Shift Review, By SKU, Plan vs ActualFive yardsticks against three kinds of standard: the SKU's rate, the plan, and the steps.One of them runs the other way: on By SKU's % of standard, higher is worse (table).
CPLHSynopsis, History, Dashboard, Labor tabUnits per hour, over different hours.Changeover and start-up are in on some and out on others (table).
HeadcountDaily Total Headcount, Weekly People, History WorkersDaily: the Shift Review count once submitted. Weekly: average and peak per day worked, never added. History: the Workers tile and table count different names on the hour records. An order's card shows its average crew when the records carry a headcount.At sites that post hours by role, History's Workers tile and table count role labels, not people.

Billed, Actual and Margin

Before you compare two money figures, check three things:

  • Which price it bills at: the customer's rate, or the locked price.
  • Whether Actual includes the LTO/QA.
  • What the percent is divided by.
Example numbers: one order, two percentsAn order billed $1,000.00 at the customer's rate and cost $700.00. The Daily, Weekly, Monthly and By SKU all show Actual vs Customer Billing Margin +$300.00. That is 300 ÷ 1,000 = 30.0% of Customer Billing. Export margin's Markup % = 1,000 ÷ 700 − 1 = 42.9%. Same dollars, two percents, because one divides by billing and the other by cost. By SKU flags its row Billing 40%+ over Actual, because 1,000 is more than 1.4 × 700 = 980. Never add percents across rows: add the dollars, then work the percent out again.

The locked-price figures answer a different question: the locked price against labor without the LTO. They are Plan vs Actual, the Dashboard's Billing tiles and the Executive Dashboard's Billed Revenue. Worked example.

Which week?

  • Weekly Synopsis and Plan vs Actual: Monday to Sunday, named Week of its Monday.
  • Billing (Bill, and By SKU's Week): Sunday to Saturday, named Week ending its Saturday. By SKU's Month and Quarter are calendar months and calendar quarters.
  • History's Last Week chip: today and the 7 days before it (8 calendar days).
  • The Dashboard's Last 7 Days: today and the 6 days before it (7 calendar days).
Example: one Sunday, two weeksSunday 11/15/2026 is the last day of the Weekly Synopsis Week of Mon 11/09, and the first day of the bill Week ending 11/21/2026. So a Weekly's Cost and margin equals By SKU's week only when nothing was posted on either Sunday. To check a By SKU week by hand, take the Dailies from Sunday to Saturday.

Hours: why the planner says 4.7 and Material Master says 5.08

Both are right. They count different work.

ScreenCountsUses
Labor Planner block, Checkpoint's target, Build Schedule Eng. hrsThe line run only. A build block's panel says how much pre/post-build time is not on the plan.The SKU's steps.
Material Master: Work Hours and Clock HoursThe line run plus the pre-build and post-build steps (staging). The line under Clock Hours splits the two.The SKU's steps.
Costing: the h run under the Headcount (engineered) tile (just Headcount at a site with no shift roles)The same all-in hours, plus the site's indirect %.The SKU's steps.
Labor tab: Labor HoursUnits ÷ CPLH, plus the pre/post-build steps.The Units/Hr stored on the SKU.
Real example: a 184-unit order, crew of 17

This is a real order from one site. Its SKU, PO and site are left out.

Planner: 4.70 hours. The line run's timed steps come to 79.97 person-hours (everyone's hours added up). 79.97 ÷ 17 people = 4.70 hours on the clock. Checkpoint's target for the run agrees: 184 units at about 39 an hour.

Material Master: 5.08 hours. Work Hours are 86.29 person-hours: the same line run plus five pre/post-build steps. 86.29 ÷ 17 = 5.08 hours.

StepWhenPerson-hours
Move corrugate and candy to the linePre-build0.62
Remove packaging from corrugate and candyPre-build1.25
Place corrugate on the tablePre-build0.65
Move pallet to stagingPost-build3.27
Dispose of packaging wastePost-build0.52
Total6.31

The gap: 79.97 + 6.31 = 86.28, the 86.29 above to rounding. 6.31 ÷ 17 = 0.37 hours on its own. Beacon prints 0.38: the rounded 5.08 less the rounded 4.70. That way the two parts always add up to the figure above them.

What the two screens print. Material Master, under Clock Hours 5.08: 4.70 line run + 0.38 pre/post-build. The planner's block panel, under Hours 4.7 h: line run · +0.38 h pre/post-build not on the plan.

Costing shows Headcount (engineered) 17, with 5.3 h run (worked) under it: 86.29 plus the site's 5% indirect = 90.6 person-hours, ÷ 17 = 5.33.

The Labor tab said 23.3 labor hours for the same order. It divides by the Units/Hr typed on the SKU. The SKU's Rate in force said Not reviewed: nobody had checked that number against the steps.

On the Labor Planner, staging is its own block. A build block is the line run only. If you plan only build blocks, the day leaves the staging work out. The build block's panel then says +0.38 h pre/post-build not on the plan, at that block's quantity and crew.

  1. To add the staging, click + Pre/Post-build block above the lanes.
  2. Pick the line, the order, Pre-build or Post-build, and the quantity. Click Add block. Beacon puts the new block after the last block on that lane.
  3. Click Save plan. The build block's panel now says line run · pre/post-build planned separately.

Material Master's Clock Hours always include the staging. Where to read the split:

  • Material Master: open the SKU, type the order size in Costing → Quantity, and read the line under Clock Hours.
  • Labor Planner: double-click a build block and read the line under Hours.
  • Costing tab: under Cost Breakdown, the line that starts Movement hours shows it in person-hours (how to check).

Neither line shows for a SKU with no pre/post-build steps. Material Master also leaves it off when the planner would time the line run differently, for example when some steps belong to a fixed role. More: Line run and pre/post-build.

Productivity, Efficiency and % of standard

NameWhereWhat it comparesHigher means
ProductivityDaily, Weekly, Monthly, Year to DateStandard hours earned (units ÷ the SKU's rate in force on the day it posted) ÷ assembly hours less start-up. Weighted by hours on the Daily, Weekly and Monthly. Year to Date and its quarters take a plain average of the months.Betterfaster than the rate
Productivity AverageDashboardA plain average of each order's productivity.Betterbut a small order counts as much as a big one
EfficiencyShift Review table (also in the Daily)Units built per labor hour ÷ the plan's units per labor hour.Betterbetter than the plan
% of standardBilling → By SKUHours worked (less changeover and start-up) ÷ the step standard, including pre/post-build steps.Worsemore hours than the standard
Of standard pacePlan vs Actual (not on yet)Earned hours ÷ worked hours, line run only.Betterfaster than the standard
Example numbers: same work, two directionsThe steps say an order should take 50 hours, and it took 55. By SKU's % of standard reads 55 ÷ 50 = 110%: higher is worse. A pace or productivity figure reads 50 ÷ 55 = 91%: higher is better. Both say the crew was about 10% slow. In real life they use different standards, so they are never exact mirror images.

If Productivity looks impossibly high or low, check the SKU's Rate in force (Material Master → the SKU → Costing). A SKU marked Not reviewed is graded on the number someone typed, which can be far from its steps. Rate in force, explained.

CPLH: units per hour, over which hours?

ScreenDivides units byChangeover hoursStart-up hours
Daily, Weekly, Monthly, Year to DateAssembly hoursInOut
History (tiles, cards, table)Build hours of every roleOutOut
Dashboard tile and Top Performing DaysBuild hours of every role, on the days you pickOutOut
Labor tabNot a measurement: it is the Units/Hr stored on the SKU (the typed rate, unless Use steps or an override replaced it).
Example numbers: one day, two CPLHsA day built 1,000 units in 100 assembly hours. Those hours include 5 of changeover and 3 of start-up, and nobody else logged hours. Daily: 1,000 ÷ (100 − 3) = 10.3. History and the Dashboard: 1,000 ÷ (100 − 5 − 3) = 10.87. If a lead or a material handler logged hours on the order too, History's and the Dashboard's numbers drop, because they divide by every role.

Why changeover and start-up come in or out: changeover hours and start-up hours.

Old days that change

Some figures are worked out when you open the screen, from today's steps, crew, role rates and customer rates. When one of those changes, past days and weeks show new numbers.

  • Change when inputs change: cost and margin on the Daily, Weekly and Monthly, and Billing's Bill and By SKU. So does every labor cost priced at today's role rates. That means the Monthly's Labor Costs, Year to Date labor cost, History's Est. Cost and the Dashboard's Est. Labor Cost.
  • Never change: emails already sent, and files already printed or exported. The locked price stays as it was at first posting. Synopsis Productivity stays graded on the rate in force when the day posted. Days posted before v2.182.0 (November 8, 2026) carry no stamp, so they follow the SKU's rate today.
Example numbersOn Monday an Admin raises a role's rate from $20.00 to $21.00 an hour. Last Thursday's order had 200 hours in that role. Its Actual Cost on Thursday's Daily now reads $200.00 more than it did on Thursday, and its Actual vs Customer Billing Margin $200.00 less. The Weekly, the Monthly and By SKU move with it. Its Planned Cost goes up too, because Beacon's quote uses the same role rates. So Actual vs Planned moves by less than $200.00. When you need a figure as it was, keep the email or the exported file.

7. Worked questions

Each answer says where to click, what to read, and shows example numbers.

Q1Which order lost money yesterday?

  1. History → Synopsis → Daily Synopsis, and set Select Date to yesterday. (Admin and up, at a site that bills per unit.)
  2. If the note says Not submitted, submit that day's Shift Review first.
  3. Scroll to Cost and margin and read the two margin columns. Red is below zero.
Example numbers
OrderPlannedActualCustomer BillingActual vs PlannedActual vs Customer Billing
Order A (4A)$9,000.00$9,900.00$10,800.00−$900.00
−10.0%
+$900.00
8.3%
Order B (6B)$2,000.00$1,850.00—
no rate
+$150.00
7.5%
—
Total$11,000.00$11,750.00$10,800.00
1 of 2
−$750.00
−6.8%
+$900.00
8.3%, 1 of 2

Order A ran $900.00 over its standard, but still made $900.00 at the customer's price. Order B beat its standard; it has no customer rate, so it is left out of the customer margin until an Admin imports one. The +$900.00 total is not $10,800.00 − $11,750.00, because Order B is left out of it.

Q2Is last week complete?

  1. History → Synopsis → Weekly Synopsis. It opens on last week.
  2. Read Posted days: N of 7. In Day by day, find any day the lines ran that says Nothing posted or Reopened.
  3. Have a coordinator submit (or re-post) those days in Shift Review, then open the week again.
  4. If you bill weekly, click Analytics → Analytics, then the Billing tab, then Bill. Pick the Sunday-to-Saturday week and read Not posted in Warnings.
Example numbersThe week reads Posted days: 4 of 7. Monday to Thursday say Submitted. Friday ran, but says Nothing posted, because its Shift Review is still pending. The bill's Warnings say Checkpoint holds 300 units closed out for PO DEMO-4410, not posted in Shift Review. At a $2.00 rate that is $600.00 missing from the bill. After Friday is submitted, the week reads 5 of 7 and the warning is gone.

Q3Which SKUs lose money at the customer's price this week?

  1. Click Analytics → Analytics, then the Billing tab, then By SKU. Leave Week picked, and pick the week with the arrows. For a month or a quarter, click Month or Quarter instead.
  2. The red Losing money rows sit at the top.
  3. For each, compare Customer Billing Cost with Planned Cost, then read % of standard.
  4. Click the arrow on the row to see which POs carried the loss. To share it inside the company, click Export margin. Its Quote markup % says how far the customer's rate is above or below Planned Cost.
Example numbers
SKU% of standardPlannedActualCustomer BillingActual vs PlannedActual vs Customer Billing
SKU A95%$4,400.00$4,200.00$3,600.00+$200.00
4.5%
−$600.00
−16.7%
SKU B150%$2,000.00$3,000.00$2,600.00−$1,000.00
−50.0%
−$400.00
−15.4%

SKU A is a price question. The crew beat the standard (95%), and Actual came in under Planned. But Customer Billing is $800.00 under Planned: the customer's rate is 18.2% under Beacon's own cost for the work (3,600 ÷ 4,400 − 1).

SKU B is a labor or standard question. Customer Billing is 30% over Planned (2,600 ÷ 2,000 − 1). But the work took 50% more hours than the standard, and Actual ran $1,000.00 over Planned. Look at its POs: a short run, a bad count, or a standard that is too tight.

Q4What did last month make at the customer's price?

  1. Click Analytics → Analytics, then the Billing tab, then By SKU.
  2. Click Month, then the ‹ arrow once. The label reads last month, for example October 2026.
  3. Read Posted days: N of M. If the yellow line names a day, have a coordinator submit it in Shift Review. Then open the month again.
  4. Read the Total row: Planned, Actual, Customer Billing and the two margins. Under each, n of m PO-days says how much of the month it covers.
  5. To keep a copy inside the company, click Export margin. Admins can also print the Monthly Synopsis: its Cost and margin shows the same month, one row per SKU.
Example numbers: why the locked-price figures say something else

One order, 2,000 units, built on one day last month. The customer's rate is $1.40. The price locked when it first posted is $2.20.

By SKU (Month) and the Monthly's Cost and margin bill it at the customer's rate: 2,000 × $1.40 = $2,800.00. Plan vs Actual and the Dashboard's Billing tiles bill it at the locked price: 2,000 × $2.20 = $4,400.00. Their labor cost also leaves out the LTO, so their margin for the same order reads higher still.

For margin at the customer's price, use By SKU or a Synopsis's Cost and margin. The Monthly's Export to Excel has no billed or margin figures.

Q5Why does the planner say 4.7 h when Material Master says 5.08 h?

  1. Click Production → Build Schedule, then the Labor Planner tab. Go to the day and double-click the order's build block. Read Hours and the line under it.
  2. Click Production → Material Master and open the SKU. In its Costing section, type the order size in Quantity. Read Work Hours, Crew, Clock Hours and the line under Clock Hours.
  3. The line run under Clock Hours is the planner's figure. The pre/post-build part is the gap.
  4. For the same split in person-hours, click Analytics → Analytics. Pick the SKU, type the quantity, click Costing, then Calculate. Under Cost Breakdown, read the line that starts Movement hours.
The 184-unit order (the real order from section 6)The planner's block reads 4.7 h, with line run · +0.38 h pre/post-build not on the plan under it. Material Master reads Clock Hours 5.08, with 4.70 line run + 0.38 pre/post-build under it. 4.70 + 0.38 = 5.08 h. Costing reads Movement hours: 80.0h · build steps: 6.3h · total: 86.3h, and the crew is 17. 79.97 ÷ 17 = 4.70, and 86.29 ÷ 17 = 5.08. (The Costing line rounds 79.97 to 80.0.) The step-by-step breakdown is in section 6.

Q6How many units can I build from what's on hand?

  1. Get the on-hand cases for each item from your stock report or the planner's stock snapshots.
  2. Analytics → Analytics: pick the SKU, type the order size, click Build.
  3. Type each item's cases in Cases Available and click Calculate Maximum Units.
  4. Read the maximum, the limiting item, and whether the order is buildable in full.
Example numbersTrays: 1,500 cases × 12 pieces ÷ 6 per unit = 3,000 units. Film: 2,000 cases × 24 pieces ÷ 6 per unit = 8,000 units. Maximum Units You Can Build is 3,000, limited by the trays. For an order of 3,500, Beacon says Short by 500 units. You need 1,750 cases of trays to build it all (3,500 × 6 ÷ 12).

Q7How many people and days does an order need?

  1. Check the SKU's Rate in force first (Material Master → the SKU → Costing). If it says Not reviewed, use Costing or Material Master hours instead of the Labor tab.
  2. Analytics → Analytics: pick the SKU, type the order size, click Labor.
  3. Set the hours per day. Click Workers and type the people you have, or Days and type the days you have.
Example (Fig. 9)1,000 units at CPLH 8.6, plus 7.7 hours of build steps = 124.0 labor hours. With 10 workers at 8 hours a day, that is 2 days. Click Days and type 2 instead: Workers Needed = 124.0 ÷ (2 × 8) = 7.75, rounded up to 8 workers.

Q8What will 1,000 units cost?

  1. Analytics → Analytics: pick the SKU and leave Target Qty at 1,000. Click Costing.
  2. Set Markup % (Optional) to 0 for cost (some groups fill in a markup for you), or type a markup for a price.
  3. Click Calculate and read the headline, Cost / Unit and Cost / Pallet.
  4. Save it with Save to Archive if you will need it again.
Example numbersTotal Estimated Cost $6,480.00 for 1,000 units: $6.48 a unit. With Markup 20%, the headline becomes Total Quoted: 6,480.00 × 1.20 = $7,776.00, which is $7.78 a unit, or $777.60 a pallet at 10 pallets. This is a quote. The Daily's Planned Cost for the same units can differ. It has no markup and no material cost. It also plans the LTO for the run's hours, not one full shift per order.

8. Where the numbers come from, and who keeps them right

Every figure on these screens is only as good as what feeds it. If a number looks wrong, check its input here first.

InputWhere it is setWhoWhat it feeds
Role rates, shift roles (the LTO), billing model, the shift's paid hoursSettings → Labor RatesAdminEvery cost: Actual, Planned, Costing, History Est. Cost, the Dashboard's Est. Labor Cost, Monthly and Year to Date labor cost. The billing model decides whether the per-unit money shows at all.
Customer ratesAnalytics → Analytics → Billing → Import customer ratesAdminBill Rate and Charge. Customer Billing Cost on the Daily, Weekly, Monthly and By SKU.
SKU steps, frequencies and crewMaterial Master → the SKUAnyone who can edit materials, for the SKU's own steps, frequencies and crew. Step times (Material Master → Steps) are Admin only.Planned Cost, Costing, planner hours, By SKU standard hours, Material Master hour tiles and the split under Clock Hours.
Units/Hr and Rate in forceUnits/Hr: the SKU's edit form in Material Master, until Use steps or an override locks it. Rate in force: Material Master → the SKU → Costing.Anyone who can edit materials types Units/Hr or clicks Use steps. Only an Admin sets an override.Synopsis Productivity and the Labor tab's CPLH. An override also changes the planner, Checkpoint, Costing, Planned Cost and Material Master hours.
The day's hours and unitsProduction → Shift Review → Submit (Checkpoint sites); Production → Hour Tracker (other sites)Coordinator and up, not Executive (Shift Review); Lead and up, not Executive (Hour Tracker)Everything. At Checkpoint sites, a day counts nowhere until it is submitted. Other sites post hours when they save them in Hour Tracker.
Customer PO, Title, Location codeAnalytics → Analytics → Billing → Bill → Save settingsLead and up, not ExecutiveThe exported bill. Missing settings until saved.
Email recipients, and what the Daily showsSettings → Email SettingsAdminDaily, Weekly and month-end emails. Which Daily sections show. The Daily and Weekly emails carry Cost and margin when an Admin sends them.
Who sees the Costing moneySettings → Permissions → CostingAdminNo access hides Costing, Billing and the other cost money from one person below Admin.
Dashboard tiles and coloursSettings → Display Config → KPI DashboardAdminThe Dashboard tiles.
The locked priceSet by Beacon when an order first posts: the SKU's Negotiated price / unit if one is set in Material Master, else Beacon's own quote. Nobody can change it after that.Anyone who can edit materials, for the Negotiated price / unit.Plan vs Actual money, the Dashboard's Billing tiles, the Executive Dashboard's Billed Revenue.

How-tos for the inputs: update labor rates, import customer rates, set a SKU's steps, rate in force, submit the day, what the Daily shows.

9. Glossary

WordMeaning
Assembly hoursHours of the people who build the product. The Synopsis rates divide by these, not by Total Hours.
ChangeoverTime from one order's stop to the next order's first pallet on the same line, less one pallet's standard time. A coordinator can also type it.
Clock hoursHow long a job takes on the clock: person-hours ÷ crew.
CPLHCases (units) per labor hour.
Customer rateThe dollars per unit the customer pays, from the rate workbook an Admin imports.
Planned Cost (Engineered cost)Beacon's own quote: the SKU's steps plus the LTO/QA planned for the run's hours. Before markup, with no case material. By SKU called it Engineered cost until v2.196.0.
Frozen planThe plan as it stood a set number of hours before each block started. Plan vs Actual grades against it.
Indirect labour %An extra share of hours a quote adds on top of the step hours. An Admin sets it in Settings → Labor Rates → Advanced.
Line runThe timed steps on the line itself. The planner's build block and Checkpoint's target count only this.
Locked priceThe price per unit set when an order first posts: the SKU's Negotiated price / unit if it has one, else Beacon's own quote. It never changes after that. Plan vs Actual, the Dashboard's Billing tiles and the Executive Dashboard's Billed Revenue bill at it.
LTO/QAShift roles a line pays for by the shift, not per unit. Actual cost adds them for each order's run.
Markup %How far billed is above cost: billed ÷ cost − 1. Only in By SKU's Export margin.
Person-hoursCrew × time. 17 people for 1 hour is 17 person-hours.
PO-dayOne PO on one day: one row of a Daily Synopsis cost table. A week, a month or a quarter adds up its PO-days.
PostedSaved to Beacon's hour records. At Checkpoint sites, a day posts when its Shift Review is submitted.
Pre/post-build stepsStaging work before or after the line run, such as moving material to the line or pallets to staging.
Rate in forceThe rate a SKU is graded on: Steps, Override, Not reviewed (the typed number), or Typed (no steps).
Start-upThe paid morning window before a line's first order. It counts in hours and cost; most rates leave it out (CPLH).
TransactionalBeacon's name for a site that bills per unit.
Week endingThe Saturday that names a billing week (Sunday to Saturday).
Whole monthsA Dashboard tile that still adds up every calendar month the range touches says so under its number.