Beacon how-to · November 2026

Margins for a week, a month or a quarter

Analytics → Billing → By SKU now covers a week, a month or a quarter, with the Daily Synopsis's three costs and two margins. The Weekly and Monthly Synopsis get a Cost and margin table too. Every period is its Daily Synopses added up.

  • v2.196.0

The pictures use demo data. The orders are named DEMO.

1. What changed

  • By SKU has a Week | Month | Quarter switch. Quarters are calendar quarters: Q1 is January to March.
  • Its money columns use the Daily Synopsis's names and math: Planned Cost, Actual Cost (incl. LTO/QA), Customer Billing Cost, Actual vs Planned Margin and Actual vs Customer Billing Margin.
  • Weekly Synopsis: a Cost and margin section, one row per PO. On screen and in Print it comes after Work orders; in the email it comes last.
  • Monthly Synopsis: a Cost and margin section, one row per SKU. It replaces the old Billed / Actual Cost / Margin columns.
  • Print on the Monthly and Year to Date printed a blank page. It works now.

2. By SKU: a week, a month or a quarter

  1. Go to Analytics → Billing → By SKU.
  2. Pick Week, Month or Quarter.
  3. Use the arrows to move back or forward. The label says which period you are on, like “Week ending 11/21/2026”, “November 2026” or “Q4 2026 (Oct–Dec)”.

The week is still Sunday to Saturday, named by its Saturday. That is the bill's week. It is shared with the Bill view, so switching between Bill and By SKU keeps the same week.

By SKU for the week ending 11/21/2026: posted days 3 of 7, a yellow line saying Thu 11/19 ran but was not posted, and three demo SKUs with Planned, Actual and Customer Billing Cost, the two margins and the flag Billing 40%+ over Actual on two of them, then a Total row with 5 of 5 PO-days and 4 of 5 PO-days, and the notes under the table.
Fig. 1A week. DEMO-SKU-2 has no customer rate, so its Customer Billing is a dash and the Total says 4 of 5 PO-days. Demo data.

ColumnsLeft to right

  1. SKU, Description, Units
  2. Hours worked, Standard hrs (Beacon steps), % of standard. Over 100% means it took more hours than the standard.
  3. Planned Cost: what the engineering standard says the units built should cost. This used to be called “Engineered cost”. Same number.
  4. Actual Cost (incl. LTO/QA): posted hours times role rates, plus the LTO for the run.
  5. Customer Billing Cost: units times the customer rate. This used to be “Billed”.
  6. Actual vs Planned Margin: Planned minus Actual, with its % of Planned under it.
  7. Actual vs Customer Billing Margin: Customer Billing minus Actual, with its % of Customer Billing under it. This used to be “Margin $”. Same dollars.
  8. Flag: red “Losing money” when Customer Billing is under Actual. Amber “Billing 40%+ over Actual” when Customer Billing is at least 1.4 × Actual, which is a margin of 28.6% or more. Hover the flag or the Flag header to see this. Same rules as before; only the name is new. It used to say “Marked up 40%+”, which read like a 40% margin.
Example: DEMO-SKU-1 in Fig. 1Planned $6,080.53. Actual $5,613.22. Customer Billing $9,680.00.
  • Actual vs Planned: $6,080.53 − $5,613.22 = +$467.31, which is 7.7% of Planned. The SKU ran a little under its standard cost.
  • Actual vs Customer Billing: $9,680.00 − $5,613.22 = +$4,066.78, which is 42.0% of Customer Billing.
  • The flag says “Billing 40%+ over Actual” because $9,680.00 is 1.72 × $5,613.22, 72% over it. The flag measures over Actual; the margin % measures against Customer Billing, so 72% over Actual is a 42.0% margin.

Click the arrow at the start of a row to see the SKU's POs, with the same columns and how many days each PO ran in the period.

MovedMarkup % and Quote markup % are in Export margin only

They left the screen so a row never shows two kinds of percent. Export margin still has them, and it follows the period you picked: “Margin by SKU - week ending 11-21-2026.xlsx”, “Margin by SKU - November 2026.xlsx” or “Margin by SKU - Q4 2026.xlsx”. Percents now show one decimal, so 39.9% no longer reads as 40. The file also says why a figure is blank or covers only some PO-days (a Left out column), how many PO-days each total covers, and the screen's notes under the table.

By SKU for Q4 2026 (Oct–Dec): posted days 13 of 92, the days that ran but were not posted, and the quarter's SKUs.
Fig. 2A quarter. Demo data, including some older test orders with no customer rate.

If the customer rates could not be read, a yellow line says “Customer rates could not be read, so Customer Billing Cost and its margin are blank. Try again.” “No customer rates yet” shows only when no PO-day in the period has a customer rate. If the period could not be read at all, By SKU says “Cost and margin could not be read from the server. Try again.” with a Try again button.

Orders with no single SKU (non-production work, or a PO whose builds name two SKUs) share one row at the bottom, so the rows always add up to the Total.

3. Weekly Synopsis: Cost and margin

History → Synopsis → Weekly Synopsis. On screen and in Print the new section sits right after Work orders. It uses the Weekly's own Monday to Sunday week, so it lines up with the report's Day by day table.

  • The Daily's five tiles, each with “n of m PO-days”.
  • One row per PO: the line or lines it ran on, the PO with the days it ran, the SKU, and the five figures.
  • A Total row that matches the tiles.
Weekly Synopsis, week of Mon 11/16: the Cost and margin heading, five tiles, a yellow note, and one row each for DEMO-2471, DEMO-2473 and DEMO-2472 with their days, then the Total.
Fig. 3On screen. DEMO-2471 ran Mon and Tue, so its row adds both days. Demo data.

Print prints it with the rest of the report. Email this week includes it when an Admin sends the email, as the last section, after Plan vs actual, and without the day list under each PO. Gmail cuts off a long email, so the money goes last and never pushes the older sections down. When anyone else sends it, the email says “Cost and margin are included only when an Admin sends this email.” at the end.

The Weekly Synopsis as printed: the Cost and margin tiles, note and table.
Fig. 4Printed. Demo data.
The end of the weekly email: Plan vs actual, then Cost and margin with its tiles, the yellow note and the table with three demo orders and a Total row. The PO column shows the PO only.
Fig. 5In the email an Admin sends: last, after Plan vs actual. Demo data.

Print and Email wait until the cost has loaded, so neither goes out without it. If the cost could not be read, the screen says “Cost and margin could not be read from the server. Try again.” with a Try again button that reads only the cost again. An email cannot be retried, so it says “Cost and margin could not be read from the server when this email was sent.” The Monthly and By SKU work the same way, and the Monthly PDF says “when this PDF was made”.

4. Monthly Synopsis: Cost and margin

History → Synopsis → Monthly Synopsis. The section sits after Work Orders Summary, with one row per SKU and how many POs it had that month. A month at Ferrara runs 80 to 90 POs, which would be three printed pages; one row per SKU keeps it to one.

Monthly Synopsis for November: Posted days 8 of 30, the days that ran but were not posted, five tiles, a yellow note, and one row per SKU with its PO count.
Fig. 6November. Demo data, including older test orders.

RemovedBilled, Actual Cost and Margin in Work Orders Summary

Those three columns and their totals are gone. They used a different math: Billed was Beacon's own price locked at the first posting, not the customer's rate, and Actual left out the LTO. For November 1–18 at Ferrara they said a margin of about $7,448; the Daily Synopses added up say $74,374. The new section is the Daily's math, so a month is its Dailies added up.

  • Export to PDF has the Cost and margin table.
  • Export to Excel kept the old Billed and Margin columns until v2.197.0 (see the note below). In v2.196.0 an Admin saw a line under it saying so, and that the Cost and margin table was in the PDF. Below Admin, at a site that bills per unit, Export to Excel was not offered, because those columns were money.
Changed in v2.197.0The Excel file loses its Billed and Margin columns at every site, and the line under Export to Excel now says where the money is. Below Admin at a site that bills per unit, Beacon's server refuses the file too. See The Monthly Excel file: hours and labor cost only.
The Monthly Synopsis Export menu for an Admin: Export to Excel with the line about its Billed and Margin columns under it, then Export to PDF.
Fig. 7The Export menu, as an Admin saw it before v2.197.0.

Before, Print on these two printed a blank page. Now it opens the report in its own window, the way the Daily and Weekly already did. Allow pop-ups for Beacon if your browser asks.

The Monthly Synopsis printed: the Cost and margin section with tiles and the per-SKU table.
Fig. 8The Monthly, printed. Demo data.
Year to Date Synopsis 2026 printed: the summary tiles and labor breakdown.
Fig. 9Year to Date, printed. It prints the tab you have open.

6. How the numbers add up

Every figure for a week, month or quarter is the Daily Synopsis's figures added up. A PO-day is one PO on one day: one row of a Daily Synopsis. A PO that ran three days is three PO-days.

Check it by hand: the demo week of 11/16
Daily SynopsisPlannedActualCustomer Billing
Mon 11/16$4,491.04$4,341.01$7,350.00
Tue 11/17$4,352.85$4,305.38$7,130.00
Wed 11/18$1,436.36$1,892.80— (no rate)
Week$10,280.25$10,539.19$14,480.00
The Weekly Synopsis and By SKU show exactly these totals (Fig. 1 and Fig. 3).
  • “n of m PO-days”: a total adds only the PO-days that have that figure. A missing figure is a dash, never $0. Hover the dash to see why.
  • A margin adds only the PO-days that have both of its figures. That is why a margin can differ from the difference of the totals above it.
  • Priced with today's rates and standards. Like the Daily, a period is worked out from today's role rates, steps, crew and customer rates. An old month changes if those change. A copy you printed or emailed does not.
  • The bill. Customer Billing is rounded per PO-day, the bill per PO-week. A week's Customer Billing can differ from the bill by at most a cent per PO-day. The bill stays the invoice.

7. Days not posted

Every period says Posted days: N of M. A yellow line names each day a Checkpoint line ran but nothing was posted, like “Thu 11/19”. Those days carry no money until their Shift Review is submitted. Submit the review, then open the period again.

8. Who sees what

WhereWho
Analytics → Billing → By SKU (week, month and quarter)Leads and up, as before
Weekly and Monthly Synopsis: Cost and marginAdmin, Executive and Super Admin, as on the Daily Synopsis
The weekly emailHas the section only when an Admin sends it
Monthly Synopsis below AdminNo money columns at all now (the old ones are gone)

Only a site that bills per unit gets the synopsis sections. By SKU shows at every site, as before. Settings → Email now says the weekly email carries the money too when an Admin sends it, so add only people who may see it.

9. Good to know

  • LTO outside run time. LTO time before the first run, between runs or during start-up is charged to no PO, as on the Daily. At Ferrara that is up to about $210 a day.
  • Small runs give big percents. A SKU that built 25 units in a week can read −1,560%. Sort by dollars to keep them out of the way.
  • Still on the old math: the Dashboard billing tiles, the Executive Dashboard's Billed Revenue and Plan vs Actual money.
  • Year to Date quarters still show labor cost only. Use By SKU's Quarter for margins.
  • Earlier-stage work. A PO-day with only earlier-stage work (a staged SKU's first stage, no finished units that day) has no row on the Daily, so it is in no figure. The notes count those days and their hours, for example “2 PO-days of earlier-stage work left out: 14.5 h (no finished units that day)”. Ferrara had none this quarter.