Beacon how-to · November 2026

Materials: SKUs, steps, crews and quotes

Material Master is where every SKU lives: what goes in it, which steps build it, how many people build it and what it costs. This page shows the jobs you do there most often, one step at a time. Each job says who does it, shows a worked example, and lists the usual mistakes.

Screenshots are from Beacon's test site. The SKU, the item names and the numbers are demo data, not real production data.

Known issue · read first

Don't save the Groups tab until the fix ships; ask John. Saving a group right now can lock SKUs that should follow their group. They stop following it and keep a frozen copy of its steps. This page has no how-to for the Groups tab for that reason. Opening and looking at it is safe.

The Build Calculator also accepts negative numbers. Check what you type before you press Calculate. See section 7.

1. How to find a SKU

Who: anyone who can open Material Master. When: any time you need a SKU's steps, crew or price.

Steps

  1. Click Material Master in the top bar.
  2. Stay on the Materials tab.
  3. Click the big search box at the top. It says Search by material ID or description.
  4. Type part of the SKU number or its description.
  5. Read the row: group, candy, corrugate, cases per pallet, steps per case and units per hour.
  6. Click the SKU number in the first column. The SKU's full page opens (the dossier).
Material Master, Materials tab. The search box holds QA-SKU-5101. One row shows: QA demo tray copy, group COUNTER, 18 cases per pallet, 41 steps per case, 21.5 units per hour.
Fig. 1Typing a number into the top search box narrows the list to matching SKUs. The counter beside the box says how many matched.
ExampleYou need the crew for the SKU you typed QA-SKU-5101. Type QA-SKU. One row is left. Click the number in that row. You land on its page, with Overview, BOM, Build Steps, Crew and Costing down the left side.

The three-dot menu at the end of a row has PAI, Edit and Delete. Do not use Delete on a real SKU.

If something goes wrong

  • No results. Clear the search and try fewer characters. The small Search… box under the cards is a second filter. It only filters the rows already shown and does not look at group names. Use the top box.
  • A SKU you just added is missing. Reload the page.
  • The page says it failed to load materials. Reload once. It is usually a slow connection.

2. How to add a new SKU

Who: anyone who can add materials. If you do not see the Duplicate SKU button, ask an Admin. When: a new SKU is much like one you already have, for example the same tray with a different candy.

Copying is the safest way. The copy brings the group, bill of materials, pack setup, step changes and own crew along. The original is not touched.

Before you start

  • Open the SKU you want to copy (section 1).
  • Finish or cancel any edit in progress. The button is greyed out while you edit steps or crew.

Steps (Duplicate SKU)

  1. On the SKU's page, click Duplicate SKU at the top right.
  2. In Material ID, type the new SKU number.
  3. In Description, type a name of 3 to 200 characters.
  4. Click Create SKU.
  5. A message says the SKU was created. The new SKU's page opens.
Duplicate SKU window. It says it copies the group, bill of materials, pack configuration, step overrides and sealed crew under a new id and that the original is not changed. Material ID QA-SKU-5101, description QA demo tray copy, buttons Cancel and Create SKU.
Fig. 2The window tells you what is copied. Only the ID and the description are new.
The new SKU's page. Header QA-SKU-5101, QA demo tray copy, group COUNTER, 18 cases per pallet, 41 steps per case, 21.5 units per hour.
Fig. 3The copy has the same numbers as the original from the first second.

Other way: Save as new SKU

The Costing tab can also make a SKU. Work out a quote there, then click Save as new SKU under the results. Use it when you quoted a what-if first and want to keep that as a real SKU.

ExampleCopy a demo tray SKU. Material ID QA-SKU-5101, description QA demo tray copy. The new page shows group COUNTER, 18 cases per pallet, 41 steps per case, 21.5 units per hour. It is the same as the source. Now change only what is different about the new SKU, for example its steps (section 3).

If something goes wrong

  • The window says the ID is taken. Pick another number. Nothing is created until you pick a free one.
  • It says the group could not be loaded. Reload the page and try again. Beacon refuses to copy half a SKU.
  • You copied the wrong SKU. Delete the copy from its row menu in the Materials list (a SKU you made yourself only), then start again.

3. How to set up a SKU's steps and frequencies

Who: anyone who can edit materials. When: one SKU takes more or fewer steps than its group normally does.

A SKU follows its group's steps. When you change a step, only that step is pinned to this SKU (it gets an OVR tag). Everything else keeps following the group.

Steps

  1. Open the SKU and click Build Steps in the left list.
  2. Read the table. Each row is a step. Freq is how many times the step happens, and Total time is Freq × the standard time at the quote quantity.
  3. Click Edit steps.
  4. In the Freq box of a step, type the new number. The grey text beside the box shows the real count, for example × per unit → 3,000.
  5. To drop a step from this SKU, click the bin icon at the end of its row. Add a step adds one.
  6. Click Save steps. A message says the steps are saved. Cancel throws your changes away.
Build Steps table of the new SKU. Rows for the pre-build steps with times, Freq, total time and who performs. Buttons Use group standard and Edit steps at the top.
Fig. 4The Build Steps table before editing. OVR marks a step that is pinned to this SKU.

What the red box means

If a Freq box turns red, what you typed is not a usable number. Letters, a minus sign and an empty box all turn it red. Beacon will not let you save while any box is red. Save steps stays greyed out. Type a proper number (0 or more) and the box clears.

Editing steps. The Freq box of step MAT-003 holds the letters abc and has a red outline. The other Freq boxes hold normal numbers.
Fig. 5The red box holds abc. This step cannot be saved until it is fixed. The red stays even if you click away.
Bottom of the steps table after the change. Steps shown 31, overrides 3, total time 232 hours 21 minutes. Buttons Save steps and Cancel.
Fig. 6After typing 2 the box is clean. Overrides went from 2 to 3 and Total time went down. Save steps is on.
ExampleStep MAT-003 Place corrugate on table is set to 3 per unit. At 1,000 units that is 3,000 times, 1 h 11 min. This SKU only needs 2 per unit.
  1. Click Edit steps. Type abc in the MAT-003 Freq box. It goes red and Save steps is greyed out.
  2. Type 2 instead. The box is clean. The grey text now says 2,000.
  3. Click Save steps. Total time goes from 232 h 45 min to 232 h 21 min. That is 1,000 fewer times at 1.4 seconds each, about 23 minutes. Overrides goes from 2 to 3.
To undo all your changes on this SKU, click Use group standard.

If something goes wrong

  • Type the count per unit, not the order total. A 4 in Freq means 4 per unit. Typing an order total such as 4,000 runs the step 4,000 times for every unit. The app warns about this beside the box.
  • One step has an auto count box instead of a plain number. It counts itself from the bill of materials. Leave it blank.
  • A step has a name like “0”. That is a leftover from an old import. Tell John. Do not rename it yourself.
  • A big number like 1,500 saves with no warning. It is allowed. Check twice before you save a step that large.
  • Save steps is greyed and nothing is red. You have not changed anything yet.

4. How to give a SKU its own crew

Who: anyone who can edit materials. When: this SKU is built with more or fewer people than its group's standard crew.

By default a SKU uses its group's stations and crew. Once you give it its own crew, the SKU stops following the group's crew.

Steps

  1. Open the SKU and click Crew in the left list.
  2. Read Station crew (the bench). This is the number of people at stations. Support roles are the fixed roles, such as Line Captain.
  3. Click Override stations & crew for this SKU.
  4. Each station lists its seats. Change a seat's count. Tick or untick a station to use it or leave it out.
  5. Under each seat, change + who fills these to match. The counts under the seat must add up to the seat.
  6. Read the line Derived crew at the bottom of the stations. It is the sum of all seats and it is the number that divides the hours.
  7. Click Save for this SKU.
  8. If the crew total changed, a window asks about the steps. Read it, then click Keep the steps or Go back.
Crew section before editing. Station crew 11. Support roles: Line Captain 1, Material Handler 1, QA / Gate Keeper 0.33 per line. Button Override stations and crew for this SKU.
Fig. 7The crew before. 11 people at stations, from the group.
Editing the crew. The Candy Filling Station lists Candy Dumper 2 and Candy Filler 1. The Candy Filler's who-fills box is selected and holds 1.
Fig. 8Candy Filler is down from 2 to 1. The who-fills number under it matches.
Window titled Station crew changes from 11 to 10. It explains that the steps were designed for a crew of 11, and that keeping them means the work is planned and priced as the same work done by 10 people, which takes longer, not less labour. Buttons Go back and Keep the steps.
Fig. 9Beacon asks what to do with the steps. A smaller crew does the same work, so the clock hours go up. It does not remove steps for you.
Crew section after saving. A banner says This SKU has its own stations and crew and no longer follows COUNTER. Station crew 10. Buttons Use group standard and Edit stations and crew. Costing underneath shows crew 10.
Fig. 10The banner says the SKU has its own crew. Use group standard puts it back.
ExampleA group's crew is 11 at stations. This SKU needs only one candy filler.
  1. Click Override stations & crew for this SKU.
  2. Candy Filler: 2 becomes 1. Its who-fills box: 2 becomes 1. Derived crew now says 10.
  3. Click Save for this SKU. The window says the crew changes from 11 to 10. Click Keep the steps.
  4. The Costing numbers move. Work hours stay near 232 because the steps did not change. Clock hours go from 21.16 to 23.24 (232.4 ÷ 10). Units per hour go from 47 to 43.

If something goes wrong

  • You clicked Save and nothing seems to happen. The window about the steps is waiting for you. Choose one of its two buttons.
  • The Crew tile in Costing still says “group standard” after you saved your own crew. That wording is wrong, the number is right. The banner in the Crew section tells the truth.
  • You want the group's crew back. Click Use group standard in the banner.
  • Naming who fills a seat changes headcount reporting only. It never changes the crew total, the time or the quote.

5. How to quote a SKU

Who: anyone who prices work. When: a customer asks what a run costs.

Steps

  1. Open the SKU and click Costing in the left list.
  2. Check the Quantity box. It starts at 1,000 units. Type the real quantity.
  3. Read the tiles: Work hours, Crew, Clock hours, UPH, then Quote — time based.
  4. Read the small line under the quote. It lists the labor hours, then the fixed roles.
  5. For a full breakdown with markup, click Open in Costing, or use the Costing tab on Material Master.
  6. There, pick the SKU, type the Target quantity and a Markup %, then click Calculate.
  7. To bill a fixed price, type it in Negotiated price / unit on the SKU page and click Save price. Empty means bill at the engineered rate.
Costing section. Quantity 2000. Tiles: work hours 464.6, crew 10, clock hours 46.46, UPH 43, engineered standard 464.6 hours, cost per unit $5.85. Quote time based $15,221.05, $7.61 per unit. A line explains labor hours times role rates plus Material Handler, Line Captain and QA fixed.
Fig. 11The quote on the SKU page. The line under the dollar figure says how it was built.
Costing tab results for the SKU at 1000 units, markup 10 percent. Total $6,708.89. Breakdown: Assembler 250.4 hours at $22.40 is $5,609.51. Material Handler 7.50 hours fixed at $33.93 is $254.48. Line Captain 7.50 hours fixed at $24.00 is $180.00. QA / Gate Keeper 2.50 hours fixed at $22.00 is $55.00. Subtotal $6,098.99. Markup 10 percent $609.90.
Fig. 12The full breakdown. Labor, then fixed roles, then subtotal, then markup.

How the quote is built

  1. Step hours. Every step's time × how often it happens, added up.
  2. Take out the fixed-role steps. Steps done by a fixed role are charged in the fixed-role lines instead.
  3. Add 5% for indirect work. Multiply by 1.05.
  4. Paid hours. The screen says paid hours: 7.5 per 7.2 worked. People are paid for 7.5 hours for every 7.2 they work, so the hours are scaled up by 7.5 ÷ 7.2.
  5. Price the labor at the role rate.
  6. Add the fixed roles. A Material Handler and a Line Captain are charged one shift each (7.5 h). The QA / Gate Keeper is charged a third of a shift (2.5 h), shared across the site. They are charged once per run, not per unit.
  7. Add the markup. Subtotal × (1 + markup).
Example · 1,000 units at 10% markup Step hours: 46.6 movement + 185.8 build = 232.4 h.
Take out about 3.4 h of steps done by fixed roles: 229.0 h. The screen does not print the 3.4. It is what is left over when the numbers are checked.
× 1.05 for indirect: 240.4 h. × 7.5 ÷ 7.2 for paid hours: 250.4 h. The screen shows this as Labor — 250.4 h.
Labor: 250.4 h × $22.40 = $5,609.51.
Fixed roles: $254.48 + $180.00 + $55.00 = $489.48.
Subtotal: 5,609.51 + 489.48 = $6,098.99.
Markup 10%: $609.90. Total: $6,708.89, which is $6.71 a unit.

On this test site the group's own markup is 30%. The SKU page uses it: 6,098.99 × 1.30 = $7,928.69 at 1,000 units, $7.93 a unit. Typing a different markup on the Costing tab changes only that what-if.
Why double the units is not double the moneyAt 2,000 units the SKU page quote is $15,221.05, not $15,857.38 (2 × $7,928.69). The fixed roles are charged once per run. Only the labor grows. 2 × (7,928.69 − 636.33) + 636.33 = 15,221.05.

If something goes wrong

  • The quote has a different markup than you expected. The SKU page uses the group's markup. The Costing tab starts with it too, and you can change it there for one quote.
  • Edits in the Costing tab's step list. They apply to that quote only. The SKU is not changed.
  • A negotiated price shows a % above or below the engineered rate. That is normal. It says how far your agreed price is from the engineered price.
  • Some SKUs have no rate for a role. The quote cannot price that labor. Ask an Admin to add the rate.

6. How to save a default quote quantity

Who: anyone who can edit materials. When: you always quote one SKU at the same size, for example 2,000, and are tired of retyping.

Steps

  1. Open the SKU and go to Costing (section 5).
  2. Type the quantity you always use in Quantity.
  3. Click Save as default. It only appears when your number is a whole number and different from the one now saved.
  4. A message says Default quantity saved. The small text under the box now says SKU default 2,000.
Costing section with Quantity 2000 and the text SKU default 2,000. A link below reads Reset to 1,000.
Fig. 13The saved default. Reset to 1,000 goes back to the site's default.
ExampleYou always quote this SKU at 2,000. Type 2000, click Save as default. Next week, open the SKU: Quantity already says 2,000. The 2,000-unit quote is $15,221.05, $7.61 a unit.

If something goes wrong

  • No Save as default button. The number already is the saved default, or it is not a whole number (like 1,500.5).
  • You want to go back. Click Reset to 1,000.
  • It is saved for this SKU only. It does not change any other SKU.

7. How to use the Build Calculator

Who: anyone who plans builds. When: you want to know how many units you can build with the candy (the contents) you have on hand.

Known issueThe Build Calculator accepts negative numbers. A minus sign gives a wrong answer and no warning. Look at every box before you press Calculate.

Steps

  1. Click Analytics in the top bar, then the Build tab.
  2. Choose a mode. Existing Material fills the item list from a SKU. Custom starts empty.
  3. In Custom mode, click Add Item once for each candy item.
  4. For each item fill in four boxes: Item ID, Pcs Needed (pieces in one finished unit), Pcs/Case and Cases Available.
  5. Check that Total Pieces under each item is what you expect.
  6. Click Calculate Maximum Units.
  7. Read Maximum units you can build. The item that runs out first is Limited by.
Build Calculator in Custom mode. Item QA-A: pieces needed 10, pieces per case 12, cases available 100, total pieces 1,200. Item QA-B: 4, 20, 50, total pieces 1,000.
Fig. 14Each item is a card. Total Pieces is cases × pieces per case.
Result: maximum units you can build 18. Limited by QA-D. Breakdown by candy: QA-A 120 units, QA-B 250 units, QA-C 25 units.
Fig. 15The answer is the smallest of the items' own limits.
ExampleFour items, with 100, 50, 50 and 25 cases on hand.
  • QA-A: 100 cases × 12 pcs = 1,200 pcs. Needs 10 per unit. 1,200 ÷ 10 = 120 units.
  • QA-B: 50 × 20 = 1,000 pcs. Needs 4. 1,000 ÷ 4 = 250 units.
  • QA-C: 50 × 6 = 300 pcs. Needs 12. 300 ÷ 12 = 25 units.
  • QA-D: 25 × 18 = 450 pcs. Needs 25. 450 ÷ 25 = 18 units.
The calculator shows 18 units, limited by QA-D. The three other items have more than you can use.

If something goes wrong

  • A number comes out wrong or tiny. Check for a minus sign or a typo. Cases and pieces are whole numbers. Anything after a decimal point is dropped.
  • The answer is 0. A box is empty or 0. Check every item has Pcs/Case and Cases Available.
  • An item has Pcs Needed of 0. It is ignored. It can never limit the answer.
  • Pcs Needed is per finished unit. The card reads “per case” but a case here is one finished unit.

8. How to open a line layout (view only)

Who: anyone who plans labor. When: you want to see a line's floor plan: where the workstations, conveyors and people stand.

This page is look-only. Do not press Save in the layout page unless you are the person who edits layouts.

Steps

  1. Go to Build Schedule and click the Labor Planner tab.
  2. Find the Lanes row near the top. Each lane has its own pink Layout button.
  3. Click Layout next to the lane you want.
  4. The floor plan opens. The left side lists what you can place. The middle is the grid. The right side shows details of what you click.
  5. Look at the strip along the bottom. Build steps says how many steps have a worker assigned.
  6. To leave, use the browser's back button.
Labor Planner. A Lanes row lists 1A, 1B, 4A, 4B, 6A and 6B. Each lane has a pink Layout button.
Fig. 16One Layout button per lane.
Line layout for lane 4B. Grid canvas, 100 ft by 50 ft. Left palette: Worker, Belt Conveyor, Tilt Hopper, Pallet, Pallet Drop, Auto Taper, Workstation, Staging Zone, Flow Arrow, Walkway, Label, Dimension. Right panel: No selection. Bottom strip: Build steps, 0 of 8 assigned.
Fig. 17A lane with no layout yet opens an empty grid. The bottom strip lists the steps that still need a worker.
ExampleYou want to see how line 4B is set up. Open the Labor Planner, click Layout beside 4B. The grid is 100 ft × 50 ft. The bottom strip says 0 of 8 assigned. No worker is on any of the 8 build steps yet. Click a worker on the grid and the right side tells you which steps they do.

If something goes wrong

  • The page says “No line selected”. You opened it without a lane. Go back to the Labor Planner and use a lane's Layout button. There is no menu item for it.
  • You moved something by accident. Click Undo. Do not click Save. Leave the page and nothing is kept.
  • The page is blank or loads slowly. Wait a few seconds, then reload.