Beacon how-to · November 2026
Materials: SKUs, steps, crews and quotes
Material Master is where every SKU lives: what goes in it, which steps build it, how many people build it and what it costs. This page shows the jobs you do there most often, one step at a time. Each job says who does it, shows a worked example, and lists the usual mistakes.
Screenshots are from Beacon's test site. The SKU, the item names and the numbers are demo data, not real production data.
Don't save the Groups tab until the fix ships; ask John. Saving a group right now can lock SKUs that should follow their group. They stop following it and keep a frozen copy of its steps. This page has no how-to for the Groups tab for that reason. Opening and looking at it is safe.
The Build Calculator also accepts negative numbers. Check what you type before you press Calculate. See section 7.
1. How to find a SKU
Who: anyone who can open Material Master. When: any time you need a SKU's steps, crew or price.
Steps
- Click Material Master in the top bar.
- Stay on the Materials tab.
- Click the big search box at the top. It says
Search by material ID or description
. - Type part of the SKU number or its description.
- Read the row: group, candy, corrugate, cases per pallet, steps per case and units per hour.
- Click the SKU number in the first column. The SKU's full page opens (the dossier).

The three-dot menu at the end of a row has PAI, Edit and Delete. Do not use Delete on a real SKU.
If something goes wrong
- No results. Clear the search and try fewer characters. The small Search… box under the cards is a second filter. It only filters the rows already shown and does not look at group names. Use the top box.
- A SKU you just added is missing. Reload the page.
- The page says it failed to load materials. Reload once. It is usually a slow connection.
2. How to add a new SKU
Who: anyone who can add materials. If you do not see the Duplicate SKU button, ask an Admin. When: a new SKU is much like one you already have, for example the same tray with a different candy.
Copying is the safest way. The copy brings the group, bill of materials, pack setup, step changes and own crew along. The original is not touched.
Before you start
- Open the SKU you want to copy (section 1).
- Finish or cancel any edit in progress. The button is greyed out while you edit steps or crew.
Steps (Duplicate SKU)
- On the SKU's page, click Duplicate SKU at the top right.
- In Material ID, type the new SKU number.
- In Description, type a name of 3 to 200 characters.
- Click Create SKU.
- A message says the SKU was created. The new SKU's page opens.


Other way: Save as new SKU
The Costing tab can also make a SKU. Work out a quote there, then click Save as new SKU under the results. Use it when you quoted a what-if first and want to keep that as a real SKU.
If something goes wrong
- The window says the ID is taken. Pick another number. Nothing is created until you pick a free one.
- It says the group could not be loaded. Reload the page and try again. Beacon refuses to copy half a SKU.
- You copied the wrong SKU. Delete the copy from its row menu in the Materials list (a SKU you made yourself only), then start again.
3. How to set up a SKU's steps and frequencies
Who: anyone who can edit materials. When: one SKU takes more or fewer steps than its group normally does.
A SKU follows its group's steps. When you change a step, only that step is pinned to this SKU (it gets an OVR tag). Everything else keeps following the group.
Steps
- Open the SKU and click Build Steps in the left list.
- Read the table. Each row is a step. Freq is how many times the step happens, and Total time is Freq × the standard time at the quote quantity.
- Click Edit steps.
- In the Freq box of a step, type the new number. The grey text beside the box shows the real count, for example
× per unit → 3,000
. - To drop a step from this SKU, click the bin icon at the end of its row. Add a step adds one.
- Click Save steps. A message says the steps are saved. Cancel throws your changes away.

What the red box means
If a Freq box turns red, what you typed is not a usable number. Letters, a minus sign and an empty box all turn it red. Beacon will not let you save while any box is red. Save steps stays greyed out. Type a proper number (0 or more) and the box clears.

abc. This step cannot be saved until it is fixed. The red stays even if you click away.

- Click Edit steps. Type abc in the MAT-003 Freq box. It goes red and Save steps is greyed out.
- Type 2 instead. The box is clean. The grey text now says 2,000.
- Click Save steps. Total time goes from 232 h 45 min to 232 h 21 min. That is 1,000 fewer times at 1.4 seconds each, about 23 minutes. Overrides goes from 2 to 3.
If something goes wrong
- Type the count per unit, not the order total. A 4 in Freq means 4 per unit. Typing an order total such as 4,000 runs the step 4,000 times for every unit. The app warns about this beside the box.
- One step has an auto count box instead of a plain number. It counts itself from the bill of materials. Leave it blank.
- A step has a name like “0”. That is a leftover from an old import. Tell John. Do not rename it yourself.
- A big number like 1,500 saves with no warning. It is allowed. Check twice before you save a step that large.
- Save steps is greyed and nothing is red. You have not changed anything yet.
4. How to give a SKU its own crew
Who: anyone who can edit materials. When: this SKU is built with more or fewer people than its group's standard crew.
By default a SKU uses its group's stations and crew. Once you give it its own crew, the SKU stops following the group's crew.
Steps
- Open the SKU and click Crew in the left list.
- Read Station crew (the bench). This is the number of people at stations. Support roles are the fixed roles, such as Line Captain.
- Click Override stations & crew for this SKU.
- Each station lists its seats. Change a seat's count. Tick or untick a station to use it or leave it out.
- Under each seat, change + who fills these to match. The counts under the seat must add up to the seat.
- Read the line Derived crew at the bottom of the stations. It is the sum of all seats and it is the number that divides the hours.
- Click Save for this SKU.
- If the crew total changed, a window asks about the steps. Read it, then click Keep the steps or Go back.




- Click Override stations & crew for this SKU.
- Candy Filler: 2 becomes 1. Its who-fills box: 2 becomes 1. Derived crew now says 10.
- Click Save for this SKU. The window says the crew changes from 11 to 10. Click Keep the steps.
- The Costing numbers move. Work hours stay near 232 because the steps did not change. Clock hours go from 21.16 to 23.24 (232.4 ÷ 10). Units per hour go from 47 to 43.
If something goes wrong
- You clicked Save and nothing seems to happen. The window about the steps is waiting for you. Choose one of its two buttons.
- The Crew tile in Costing still says “group standard” after you saved your own crew. That wording is wrong, the number is right. The banner in the Crew section tells the truth.
- You want the group's crew back. Click Use group standard in the banner.
- Naming who fills a seat changes headcount reporting only. It never changes the crew total, the time or the quote.
5. How to quote a SKU
Who: anyone who prices work. When: a customer asks what a run costs.
Steps
- Open the SKU and click Costing in the left list.
- Check the Quantity box. It starts at 1,000 units. Type the real quantity.
- Read the tiles: Work hours, Crew, Clock hours, UPH, then Quote — time based.
- Read the small line under the quote. It lists the labor hours, then the fixed roles.
- For a full breakdown with markup, click Open in Costing, or use the Costing tab on Material Master.
- There, pick the SKU, type the Target quantity and a Markup %, then click Calculate.
- To bill a fixed price, type it in Negotiated price / unit on the SKU page and click Save price. Empty means bill at the engineered rate.


How the quote is built
- Step hours. Every step's time × how often it happens, added up.
- Take out the fixed-role steps. Steps done by a fixed role are charged in the fixed-role lines instead.
- Add 5% for indirect work. Multiply by 1.05.
- Paid hours. The screen says
paid hours: 7.5 per 7.2 worked
. People are paid for 7.5 hours for every 7.2 they work, so the hours are scaled up by 7.5 ÷ 7.2. - Price the labor at the role rate.
- Add the fixed roles. A Material Handler and a Line Captain are charged one shift each (7.5 h). The QA / Gate Keeper is charged a third of a shift (2.5 h), shared across the site. They are charged once per run, not per unit.
- Add the markup. Subtotal × (1 + markup).
Take out about 3.4 h of steps done by fixed roles: 229.0 h. The screen does not print the 3.4. It is what is left over when the numbers are checked.
× 1.05 for indirect: 240.4 h. × 7.5 ÷ 7.2 for paid hours: 250.4 h. The screen shows this as
Labor — 250.4 h.
Labor: 250.4 h × $22.40 = $5,609.51.
Fixed roles: $254.48 + $180.00 + $55.00 = $489.48.
Subtotal: 5,609.51 + 489.48 = $6,098.99.
Markup 10%: $609.90. Total: $6,708.89, which is $6.71 a unit.
On this test site the group's own markup is 30%. The SKU page uses it: 6,098.99 × 1.30 = $7,928.69 at 1,000 units, $7.93 a unit. Typing a different markup on the Costing tab changes only that what-if.
If something goes wrong
- The quote has a different markup than you expected. The SKU page uses the group's markup. The Costing tab starts with it too, and you can change it there for one quote.
- Edits in the Costing tab's step list. They apply to that quote only. The SKU is not changed.
- A negotiated price shows a % above or below the engineered rate. That is normal. It says how far your agreed price is from the engineered price.
- Some SKUs have no rate for a role. The quote cannot price that labor. Ask an Admin to add the rate.
6. How to save a default quote quantity
Who: anyone who can edit materials. When: you always quote one SKU at the same size, for example 2,000, and are tired of retyping.
Steps
- Open the SKU and go to Costing (section 5).
- Type the quantity you always use in Quantity.
- Click Save as default. It only appears when your number is a whole number and different from the one now saved.
- A message says
Default quantity saved
. The small text under the box now saysSKU default 2,000
.

If something goes wrong
- No Save as default button. The number already is the saved default, or it is not a whole number (like 1,500.5).
- You want to go back. Click Reset to 1,000.
- It is saved for this SKU only. It does not change any other SKU.
7. How to use the Build Calculator
Who: anyone who plans builds. When: you want to know how many units you can build with the candy (the contents) you have on hand.
Steps
- Click Analytics in the top bar, then the Build tab.
- Choose a mode. Existing Material fills the item list from a SKU. Custom starts empty.
- In Custom mode, click Add Item once for each candy item.
- For each item fill in four boxes: Item ID, Pcs Needed (pieces in one finished unit), Pcs/Case and Cases Available.
- Check that Total Pieces under each item is what you expect.
- Click Calculate Maximum Units.
- Read Maximum units you can build. The item that runs out first is Limited by.


- QA-A: 100 cases × 12 pcs = 1,200 pcs. Needs 10 per unit. 1,200 ÷ 10 = 120 units.
- QA-B: 50 × 20 = 1,000 pcs. Needs 4. 1,000 ÷ 4 = 250 units.
- QA-C: 50 × 6 = 300 pcs. Needs 12. 300 ÷ 12 = 25 units.
- QA-D: 25 × 18 = 450 pcs. Needs 25. 450 ÷ 25 = 18 units.
If something goes wrong
- A number comes out wrong or tiny. Check for a minus sign or a typo. Cases and pieces are whole numbers. Anything after a decimal point is dropped.
- The answer is 0. A box is empty or 0. Check every item has Pcs/Case and Cases Available.
- An item has Pcs Needed of 0. It is ignored. It can never limit the answer.
- Pcs Needed is per finished unit. The card reads “per case” but a case here is one finished unit.
8. How to open a line layout (view only)
Who: anyone who plans labor. When: you want to see a line's floor plan: where the workstations, conveyors and people stand.
This page is look-only. Do not press Save in the layout page unless you are the person who edits layouts.
Steps
- Go to Build Schedule and click the Labor Planner tab.
- Find the Lanes row near the top. Each lane has its own pink Layout button.
- Click Layout next to the lane you want.
- The floor plan opens. The left side lists what you can place. The middle is the grid. The right side shows details of what you click.
- Look at the strip along the bottom. Build steps says how many steps have a worker assigned.
- To leave, use the browser's back button.


0 of 8 assigned. No worker is on any of the 8 build steps yet. Click a worker on the grid and the right side tells you which steps they do.
If something goes wrong
- The page says “No line selected”. You opened it without a lane. Go back to the Labor Planner and use a lane's Layout button. There is no menu item for it.
- You moved something by accident. Click Undo. Do not click Save. Leave the page and nothing is kept.
- The page is blank or loads slowly. Wait a few seconds, then reload.