Beacon how-to · November 2026

Fix a shift after it's over

A lead forgot to log lunch, tapped a pallet by mistake, or couldn't find the next PO in Changeover. Here is what you can fix yourself in Shift Review, and what to send to John.

  • v2.174.0

Screenshots are from Beacon's test site. POs DEMO-101 and DEMO-102 are demo data, not real production numbers.

1. What you can fix yourself

What went wrongWhat to do
The lead forgot to log lunch.YouClick Add lunch on the line in Shift Review and give its start time. Steps
The lead forgot to log a break.YouBreaks are paid at Ferrara, so the posted hours are already right. To keep efficiency right, click Add break. Steps
Downtime was logged by mistake: a scheduled break, or a stop that was really the changeover.YouIn the line's Close Out, find it under Logged downtime and click Remove, lower the minutes, or change the reason. Steps
A pallet was tapped by mistake and the line is still on that PO.LeadPress Undo last tap on the tablet right away. Where
Units or pallets are wrong on a PO that was already changed over, wrapped up or closed.YouType the right number in the PO's row in the Close Out box. Steps
The next PO isn't in the Changeover list, so its production was never logged.YouAdd it as a missed run in the line's Close Out, with its times, crew, units and pallets. Steps
Hours were posted to a PO that didn't run.BothJohn takes the PO off the line. Then you re-post and tick Remove it. Steps

2. On the tablet, during the shift

Most mistakes are easiest to fix while the line is still running. Share these with your leads:

  1. Log lunch when it starts. Tap DOWNTIME, then Lunch. Tap End Downtime when the crew is back. If nobody ends it, Beacon ends a lunch by itself after 30 minutes.
  2. Log the end-of-shift break the same way: DOWNTIME, then Break.
  3. Tapped a pallet by mistake? Press Undo last tap right away, before CHANGEOVER or WRAP UP PO. After the line moves to another PO, Undo can't reach the old one.
  4. Next PO not in the Changeover list? Don't keep building on the PO that is on the screen. Every pallet tapped is counted to that PO. Call the coordinator.
The line console on the tablet. Undo last tap sits under the pallet button. Below it are the DOWNTIME, CHANGEOVER, CREW, WRAP UP PO and END SHIFT buttons.
Fig. 1The line console. Undo last tap is under the pallet button. DOWNTIME is bottom left.
The Log Downtime box with six reasons: Mechanical, Material, Changeover, Break, Lunch and Other.
Fig. 2DOWNTIME asks for a reason. Pick Lunch or Break.

3. Fix a missed lunch

Ferrara doesn't pay lunch. When a lead logs Lunch, Beacon takes it off the posted hours by itself.

New in v2.178.0Add the missed lunch itself instead: click Add lunch on the line in Shift Review, type its start time, and confirm. The Downtime column, efficiency and posted hours all pick it up. See Fix counts, lunch and downtime. The older way below still works.

The older way: when you close the line, lower the active time by the lunch minutes.

Example12 people. The line ran 7:15 am to 2:07 pm, which is 412 minutes. No lunch was logged. Type 382 (412 minus 30). Posted hours go from 82.4 to 76.4.

Step 1If the day is already submitted, reopen it

At the bottom of Shift Review, click Reopen day for correction. Type why, then click Reopen day. The posted hours stay as they are until you re-post.

Shift review submitted, Tue Nov 3, posted to Beacon PO DEMO-101 780 units 47.3 hours and PO DEMO-102 520 units 29.1 hours. Below it, a Reopen day for correction button.
Fig. 3A submitted day. Reopen day for correction is under what was posted. Demo data.
Reopen this day for correction? The review unlocks. Posted hours stay as they are until you use Re-post day. Reason box filled in: 1A lunch was not logged, taking 30 min off. Buttons Cancel and Reopen day.
Fig. 4The reason is required. Your name and reason are kept on the review.

Step 2Open the line's Close Out

  • Line still running: in the list at the top of Shift Review, click Close & adjust here.
  • Line already closed: scroll the table to the right and click Reopen on the line's row. Then click Close & adjust here.
Shift Review. 1 to close before you can submit: 1A, line still running, also wraps up PO DEMO-102, with a Close and adjust here button. Below, the table row for 1A: 2 builds, status Active, 1,300 actual units.
Fig. 5A line still running shows in the list at the top, with Close & adjust here. Demo data.
The right end of a closed line's row in the Shift Review table: 76.40 actual labor hours, downtime 0, and a Reopen button under Actions.
Fig. 6A closed line: Reopen is at the right end of its row, under Actions. The Downtime column shows the minutes the lead logged.

Step 3Take the lunch off the active time

The Active time (minutes) box starts at the measured time, shown beside it (“measured: 6h 52m”). Type that number minus the lunch. Leave the headcount as it is filled in, unless it is wrong. Click Confirm Close Out.

Close Out box: 1,300 units today, 13 pallets. Line ended at 2:07 PM. Ended at 02:07 PM. Active time typed as 382, measured 6h 52m. Under it: Enter the full time the line ran. Logged lunch is taken off automatically. Headcount by role: Assembler 12, Temp 0, total 12. Buttons Cancel and Confirm Close Out.
Fig. 7Measured 6 h 52 min (412). No lunch was logged, so 382 is typed. Demo data.
Don't take it off twiceThe line under the box says “Logged lunch is taken off automatically”. If the lead did log lunch, leave the minutes as they are. Check the line's Downtime column first. Never take off a break: breaks are paid.

Step 4Re-post the day

See Re-post the day. If the day was never submitted, click Submit Shift Review instead.

4. Send these to John

You can now fix units, pallets, a missed lunch or break, downtime logged by mistake, and a run that was never started yourself (how). Beacon has no way yet for you to move or delete a run the tablet started, or move a pallet to another day. For those, send John:

  • the date and the line
  • the PO and the right number of units
  • the start and end time of each PO
  • the crew: how many people, by role
  • anything else logged wrong, such as a lunch or a break
Example“Nov 2, line 1A. The second PO built 272 units from 11:30 to 2:00, with 13 Temps and 1 Line Captain. It wasn't logged because the PO wasn't in Changeover.”

John fixes the line's data. Then you finish it: Close & adjust here if the line is still open, then re-post the day.

5. Re-post the day

  1. Click Re-post day at the bottom of Shift Review.
  2. If a PO was posted before but is no longer part of the day, the box lists it under “Posted earlier, not produced by this re-post”. Tick Remove it to delete it. Anything you don't tick stays as it is.
  3. Click Re-post day in the box. The receipt shows what changed.
  4. After a re-post, the corrected synopsis email is ticked. Untick it if you don't want it sent.
Re-posting locks the review again and posts the corrected units and hours to Beacon. A Re-post day button.
Fig. 8A reopened day shows Re-post day where Submit Shift Review used to be.
Re-post this day? Hours this review posted earlier are replaced with the corrected figures. Posted earlier, not produced by this re-post: PO DEMO-102, 29.1 hours, 520 units, Remove it, ticked. Buttons Cancel and Re-post day.
Fig. 9PO DEMO-102 was taken off the line, so the re-post offers to remove its old hours. Demo data.
Shift review submitted, Tue Nov 3. Posted to Beacon: PO DEMO-101, 1,300 units, 76.4 hours. Changed by the re-post: PO DEMO-101 hours 47.3 to 76.4, units 780 to 1,300; PO DEMO-102 removed, hours 29.1, units 520.
Fig. 10The receipt lists every PO the re-post changed or removed. Demo data.

6. Nov 2: what was fixed

What went wrong on 1A. The lead couldn't find the next PO in Changeover. That was a Beacon bug, not the lead. The PO had an old closed copy from October, and Beacon read the whole order as finished, so it hid it. That is fixed in v2.175.0. Because of it:

  • the first PO showed 532 units instead of 360
  • the second PO's 272 units were never logged
  • the PO pulled forward from later in the week got its 2:00–3:15 pallet (77 units) counted on Nov 3 instead of Nov 2
  • 1 unit was posted to a PO that didn't run that day

Separately, no line logged lunch, and no line logged the end-of-shift break. On 6B that was 30 minutes for a crew of 16.

What John fixed in Beacon's data

1A on Nov 2Now in Beacon
7:15–11:00First PO, 360 units
11:00–11:30Lunch
11:30–2:00Second PO, 272 units, break 1:30–1:45
2:00–3:15Pulled-forward PO, 77 units
  • Lunch added on 1A, 4A, 6A and 6B. The end-of-shift break added on 1A, 6A and 6B.
  • The 1 unit posted in error was taken off.
  • Nov 3: the pulled-forward PO went from 220 to 143, because its first 77 units now count on Nov 2.

What's left for you

  1. Open Shift Review for Nov 2. If it still says the day is submitted, click Reopen day for correction first.
  2. 1A is still open. Click Close & adjust here.
  3. Check the box shows about 709 units, the line ending at about 3:15 PM, and about 480 minutes of active time. Lunch is already logged, so don't take anything off. Click Confirm Close Out.
  4. Click Re-post day. Tick Remove it for the 1-unit PO, then Re-post day.
  5. Send the corrected synopsis email if you want it to go out.
If the numbers don't matchIf the Close Out box shows different numbers from these, click Cancel and send John a screenshot.