Beacon how-to · November 2026

What's new: v2.175.0

History has a new Weekly Synopsis. And an open order now shows in Start Line and Changeover even when an old, closed order has the same PO and item, which was the Nov 2 bug on line 1A.

  • v2.175.0

Screenshots are from Beacon's test site. POs DEMO-TWIN-1, DEMO-RUN-3 and DEMO-CLOSED-2 are demo data, not real orders.

1. Patch notes

v2.175.0 Nov 6, 2026

  • New: Weekly Synopsis. History → Synopsis → Weekly Synopsis shows a Monday to Sunday week: totals, a day-by-day table, and breakdowns by SKU, line and order. Each day is that day's Daily Synopsis, added up. More
  • An open order is no longer hidden by an old closed copy. When one PO and item had an old Closed order and a new Open one, Beacon read the whole order as finished. Start Line and Changeover hid it. Now one open order is enough to show it. What the line sees
  • Hours land on the open order. When you post hours for a PO with two orders, the built total goes on the open one, not on the old closed one.
  • Nothing changes for a PO with only one order. A closed order still stays out of Start Line and Changeover.

2. Weekly Synopsis

Open History → Synopsis → Weekly Synopsis. It opens on last week; the arrows step back, or forward up to this week. Leads and above can email it to the same list as the Daily Synopsis.

ExampleFour posted days of 104, 136, 78 and 72 hours show a week of 390 hours. People are never added up: crews of 13, 17, 10 and 9 show as “avg 12.25 · peak 17”, not 49.

The full how-to, with screenshots: Weekly Synopsis.

3. Why one PO can have two orders

A schedule upload skips a PO that is already open in Beacon. A PO whose order is closed is added again as a new order, so a PO that comes back on a later schedule gets a second row.

Example: Nov 2, line 1AThe Oct 12 week file had a PO for 72, due Oct 17. It was closed on Oct 26 with nothing built. The Nov 2 week file listed the same PO and item again for 272, due Nov 7. Beacon had both, and the closed one hid the open one from Changeover.
Build Schedule, Customer Orders, All weeks, searched for DEMO-TWIN. Two rows for work order DEMO-TWIN-1, item 60170069: DEMO DATA new order (Open), 272; and DEMO DATA old order (Closed), 72.
Fig. 1One PO, two orders: the new one is Open, the old one is Closed. Demo data.

4. What the line sees now

In the demo, line 1A has three orders planned today: DEMO-RUN-3, DEMO-TWIN-1 (the PO with two orders) and DEMO-CLOSED-2 (one order, closed).

Checkpoint Live. Line 1A is ready with today's first block, PO DEMO-RUN-3. Line 1B has no schedule. Its Also run here list has 2 orders planned on line 1A: PO DEMO-RUN-3 and PO DEMO-TWIN-1.
Fig. 2Other lines can pick up DEMO-TWIN-1 under Also run here. Before this fix the list had only DEMO-RUN-3. DEMO-CLOSED-2 is closed, so it is not listed. Demo data.
Changeover. Load the next order for this line. 60170069, PO DEMO-TWIN-1, 272 units, Load.
Fig. 3Line 1A is running DEMO-RUN-3. CHANGEOVER offers DEMO-TWIN-1. The closed DEMO-CLOSED-2 stays hidden. Demo data.

5. Close it when it's done

For a PO with two orders, Beacon can't tell from posted hours how much of the new order is built. The old order's output may be in that total too. So once a day is posted, a finished order of this kind keeps showing in Start Line and Changeover until someone closes it.

Shift Review's Close finished orders? has no checkbox for a PO with two orders. Close it from Customer Orders:

  1. Open Build Schedule → Customer Orders. Click All and search for the PO.
  2. On the Open row, click ···, then Close order.
Customer Orders with the row menu open on the Open DEMO-TWIN-1 row: Edit, Close order, Delete.
Fig. 4The row menu on the Open order. Use Close order only when the order is done. Demo data.
The Nov 2 order on line 1AAll 272 units were built on Nov 2. After this update it shows in Changeover again until it is closed. Close its Open row once Nov 2 is re-posted.