Beacon how-to · November 2026

Weekly Synopsis

History now has a Weekly Synopsis next to the Daily and the Monthly. It adds up the Daily Synopsis for one week, Monday to Sunday: units, hours, pallets, CPLH and productivity, by day, SKU, line and order, plus plan vs actual. You can print it or email it.

  • v2.182.0
  • v2.175.0
Changed in v2.196.0The Weekly Synopsis gets a Cost and margin section for Admins at a site that bills per unit. See Margins for a week, a month or a quarter.

1. Patch notes

v2.182.0

  • Fixes this week. The Weekly Synopsis lists every line a coordinator corrected after the shift: which days, what was fixed, who fixed it and why. Read it
  • Lines fixed again and again are flagged. A line fixed on 3 or more days of the week is marked check why. The flag
  • Coordinators and above see it on screen. Everyone on the email list gets it in the email. Who sees it

v2.175.0

  • Weekly Synopsis in History. Synopsis → Weekly Synopsis. A week runs Monday to Sunday and opens on last week. How to open it
  • Every day in the week is that day's Daily Synopsis. The week only adds them up, so a week always agrees with its Dailies. Day by day
  • People are never added up. Headcount shows the average per day worked and the peak day, for example “avg 12.3 · peak 17”. Why
  • Email this week (Lead and above) sends it to the same people as the daily synopsis email. Email it

Screenshots are from Beacon's test site. The orders WS-DEMO-01, WS-DEMO-02 and WS-DEMO-03 and all their numbers are demo data, not real production data. The release number is set when it ships. The Fixes this week screenshots are from the test site too: orders DEMO-2241 to DEMO-2294 and the fixer “Claude Demo” are demo data.

2. Open the Weekly Synopsis

  1. Go to History.
  2. Click Synopsis, then Weekly Synopsis.
  3. It opens on last week (the last full Monday to Sunday). Use the arrows to go back a week or forward. You can go forward up to this week, which shows the days posted so far.
History. The Synopsis menu is open, listing Daily Synopsis, Weekly Synopsis, Monthly Synopsis and Year to Date.
Fig. 1Weekly Synopsis sits between Daily and Monthly.
Weekly Synopsis for the week of Mon 10/12 to Sun 10/18/2026. Posted days 4 of 7. Tiles: Units 820 (production 820, non-production 0), Hours 390.0, CPLH 2.3, Productivity 21.5%, Pallets about 58.4, People avg 12.3, peak 17.
Fig. 2The week's totals. “Posted days: 4 of 7” tells you how many days have hours posted. Demo data.

3. Read the week

The Weekly works nothing out on its own. Beacon runs the Daily Synopsis for each of the 7 days, exactly as History does, then adds the days up.

  • Units, hours and pallets are the sums of the days.
  • CPLH is the week's units divided by the week's hours. It is not the average of the 7 daily CPLH numbers.
  • Productivity is weighted by hours, the same way a day is. A long day counts more than a short one.
ExampleMonday built 100 units in 10 hours (CPLH 10). Tuesday built 50 in 2 hours (CPLH 25). The week's CPLH is 150 ÷ 12 = 12.5, not the average of the two days (17.5), because Monday was five times as long.

Day by day

One row per day, Monday to Sunday, then a Week row. Each day row shows the same numbers as that day's Daily Synopsis. The Week row adds them up.

The Status column says where each day stands:

  • Submitted: the day's Shift Review was submitted.
  • Reopened: the Shift Review was reopened. Its numbers can still change, so the header calls it out.
  • Posted: hours were posted without a Checkpoint Shift Review (for example from the Hour Tracker).
  • Nothing posted: no hours for that day. If the line worked that day, submit the day's Shift Review and open the week again.
Day by day table. Mon 10/12 posted, 13 people, 104.0 hours, 320 units, 10 pallets, CPLH 3.3, 31.7%. Tue 10/13 17 people, 136.0 hours, 310 units. Wed 10/14 10 people, 78.0 hours, 40 units. Thu 10/15 9 people, 72.0 hours, 150 units. Fri to Sun nothing posted. Week row: 4 of 7 posted, avg 12.3 peak 17 people, 390.0 hours, 820 units, 58.4 pallets, CPLH 2.3, 21.5%.
Fig. 3Each day matches its Daily Synopsis. The Week row adds the days. Demo data.

People: average and peak, never added up

Headcount is never added across days. Most of the crew is the same people every day, so adding them would count each person again for every day they worked.

ExampleAn order ran Monday with 18 people and Tuesday with 16. The Weekly shows avg 17.0 · peak 18, never 34.

This is the same for the whole week, each line, each order and each role. “Average” means the average over the days it worked.

By SKU, by line, by order

  • By SKU: units, hours, productivity and pallets for each SKU over the week, and how many days it ran.
  • By line: each line gets the units of the orders it ran that day. An order on line 1 Monday and line 2 Tuesday credits each line with its own day.
  • Work orders: each PO's units and hours for the week, the lines it ran on, and its crew (average and peak).
  • Labor: hours by labor type and by role, with people as average and peak.
  • Stage work: earlier stages of a staged SKU are listed on their own and are not in the week's totals, the same as on a day.
By line: Line 1 280.0 hours, 540 units, 4 days; Line 2 80.0 hours, 280 units, 1 day. Work orders: WS-DEMO-01 SKU 60008563, 750 units, 264.0 hours, Line 1 and Line 2, 3 days, avg 11.0 peak 13. WS-DEMO-02 SKU 60170069, 70 units, 120.0 hours, Line 1, 2 days, avg 7.5 peak 9. WS-DEMO-03 Rework demo, 0 units, 6.0 hours.
Fig. 4By line and work orders. WS-DEMO-01 ran on two lines on different days. Demo data.
PalletsA SKU with no pallet size shows “—”, never 0, and the Pallets tile says how many SKUs are missing a size. Set the size on the material to fix it.

Plan vs actual

The last section is plan vs actual for the week: the same rows as Analytics → Plan vs Actual for that Monday, compared to the frozen plan.

It only counts graded days (days whose Shift Review was submitted with a plan). So “Built” here can be less than the order's units above, which count every posted day.

Plan vs actual. WS-DEMO-01: plan 300 cases, built 280, 93%, plan 85.0 h, worked 80.0 h, pace 95%, Short 20 cases, Over standard by 4.0 h. WS-DEMO-02: plan 80, built 70, 88%, worked 112.0 h, pace 67%, Short 10 cases, Over standard by 37.0 h. Totals 380 planned, 350 built, 92%.
Fig. 5Plan vs actual for the graded days of the week. Demo data.

4. Fixes this week

Below Plan vs actual, Fixes this week lists every line a coordinator corrected in Shift Review after the shift (the Fix counts, lunch and downtime how-to shows how a fix is made). It answers “which line keeps needing a fix, and why?”

One row per line that was corrected:

  • Days: how many days of the week the line was corrected, and which ones.
  • What was fixed: how many count fixes, downtime added and missed runs added, then each fix with its day.
  • Who and why: the person who made each fix, with the reason they typed.

Under the table, Days reopened lists each Shift Review that was reopened that week, with who reopened it and why.

Fixes this week. Line 1A: fixed on 3 of 7 days, Tue 11/03, Wed 11/04, Thu 11/05, marked check why; 2 counts, 2 downtime, 1 missed run; each fix listed with its day; who and why: Claude Demo with three reasons. Line 4A: fixed on 1 of 7 days, 2 downtime. Line 4B: fixed on 1 of 7 days, 1 missed run. Below, the days reopened with who and why.
Fig. 6Line 1A was fixed on three days, so it is marked “check why”. Demo data.
ExampleLine 1A's count was short on Tuesday and Wednesday, and its lunch was not tapped on Thursday. That is three days, so 1A is flagged. 4A and 4B were fixed once each, so they are listed but not flagged.

The “check why” flag

A line corrected on 3 or more days in the week is marked check why and listed first. Two fixes on the same day count as one day. The number 3 can be changed for a site; ask John if 3 is wrong for yours.

A flag does not mean anyone did something wrong. It means the same line keeps needing a fix, so look for the cause: a tablet nobody taps, a crew that forgets lunch, a count that is always off.

Who sees it

  • Coordinator, Admin and Super Admin see the section on screen.
  • Lead and Viewer see one line instead: “Fixes this week are shown to coordinators and in the emailed report.” Fix records name the person and their reason, and only coordinators and above can read them in Beacon.
  • The email always has the section, whoever sends it. It goes only to the site's saved synopsis list.
Fixes this week, as a Lead sees it: Fixes this week are shown to coordinators and in the emailed report.
Fig. 7What a Lead or Viewer sees.
Nothing to fixA week with no corrections says “No line was corrected this week.” Days that were reopened are still listed under it.

5. Email it (Lead and above)

  1. Open the week you want.
  2. Click Email this week.

It goes to the same people as the daily synopsis email (Settings → Email Settings). The subject comes from the Email Subject Template in Settings → Email Settings, with the week's dates in place of {date}. It says “Weekly Synopsis” only if an Admin adds {type} to the template. If not, it uses the template's own words, for example “Daily Synopsis Report - 11/09/2026 – 11/15/2026”. Nothing is sent on its own; it only goes when you click.

Check firstSubmit every day's Shift Review before you send the week. A day that is not posted is not in the totals.
The Weekly Synopsis email: Ferrara, Weekly Synopsis, week of Mon 10/12 to Sun 10/18/2026, with the same tiles and day-by-day table as the screen.
Fig. 8The email shows the same numbers as the screen. Demo data; this preview was not sent to anyone.

The email ends with Fixes this week, the same table as the screen.

Fixes this week in the email: the same three lines, 1A fixed on 3 of 7 days with a check why badge, 4A and 4B once each, with what was fixed, who and why, then the days reopened.
Fig. 9Fixes this week in the email. Demo data; not sent to anyone.

Print prints the week as shown on screen.

6. Check it by hand

To check a week, open the Daily Synopsis for each day and add them up. Hours, units and pallets must add up to the Week row. People are the exception: take the average and the highest day, never the sum.

ExampleDemo week 10/12: the four Dailies show 104.0 + 136.0 + 78.0 + 72.0 = 390.0 hours and 320 + 310 + 40 + 150 = 820 units. People 13, 17, 10 and 9 give an average of 12.25 and a peak of 17. Those are the Week row's numbers.
The Monthly can differThe Monthly Synopsis still uses its own older calculation, so adding up four Weeklies may not give the Monthly exactly. The Weekly always agrees with the Daily.