Beacon how-to · November 2026

Shift Review and Hour Tracker

At the end of the shift the coordinator reviews every line, counts the people by role, and submits the day. Submitting posts the units and hours to Beacon. This page has five short how-tos: run the review, enter the headcount, submit and read the receipt, check hours in the Hour Tracker, and add hours by hand when a line did not use the tablet. To fix a day that is already submitted, see Fix a shift.

Known issues: read these first

The Daily Synopsis headcount can be differentThe Daily Synopsis in History can show a different headcount than Shift Review (for example 19 against 17). The number you enter and submit in Shift Review is the right one. A fix is planned.
“Units included” can be wrongShift Review can say an order's units are included when that order posted nothing. After you submit, only the orders listed under Posted to Beacon were posted. Check that list.
Tap the first pallet soon after starting a lineThe labor clock starts at the first pallet tap, so minutes before it are not charged. If a line shows very short run time or no hours, this is the likely reason. A fix is planned.
Closing a line with 0 pallets gives no warningIf a line shows 0 units here, the line was probably closed before the pallets were counted. See step 1.

Screenshots are from Beacon's test site (shown as “Demo Site”). The orders QA-3101, QA-3102 and all numbers are demo data, not real production data.

1. How to run Shift Review

Who: coordinator or above. When: at the end of the shift, after the lines are closed.

Before you start

Steps

  1. Go to Production and click Shift Review. It opens on today. To look at another day, change the date at the top right and click Go.
  2. Read the changeover strip. The first box says how many changeovers there were and the minutes between orders, for example Changeovers: 5 · 4 min between POs. Below it, each line gets one row: 1 changeover, No changeovers.
  3. Read the line rows. There is one row per line. Status says CLOSED, running or NEVER STARTED. Lease Holder is the person who ran the tablet. Then come units, labor and efficiency (see the list below the pictures).
  4. Open a line to see its orders. Click the little arrow at the start of the row. Each order the line ran gets its own row.
  5. Read the checklist, if one is shown. A box above the table says N to close before you can submit when a line is still running or an order is not wrapped up. Each row has a button: Close & adjust here for a running line, Reopen & close for a line that was closed too soon. Fix every row. When the box is gone, you can submit. A second box, Check before you submit, only advises. It never stops you.
  6. Scroll sideways in the table to see Run Time, Downtime and the Reopen button on each line.
Shift Review for 11/06/2026. Changeovers: 5, 4 min between POs. Lines 1A, 1B, 4B and 6A closed; 4A and 6B never started. Line 4B: actual units 121, planned units 489, attainment 25 percent.
Fig. 1The changeover strip on top and one row per line. Line 4B built 121 of 489 planned units.
Line 4B opened. PO QA-3101: 118 actual units, 300 planned, 39 percent, crew 12, labor hours 0.64. PO QA-3102: 3 actual units, 189 planned, 2 percent, crew 13, labor hours 0.17.
Fig. 2Line 4B opened: one row for each order it ran.

What the columns mean

  • Actual Units / Planned Units: what the line built, and what the Labor Planner planned for it.
  • % Attainment: actual ÷ planned. Red means well under plan.
  • Actual Labor Hours: person-hours: people × time. Twelve people for 3 minutes is about 0.6 hours. It is not clock time.
  • Planned Labor Hours: what the plan allowed.
  • Efficiency: planned hours compared with actual hours. More than 100% is faster than plan. A very high number such as 300%+ check rate usually means the standard rate or the hours are wrong, not that the line was super fast. Check them before you trust it.
  • Total line hours (a tile lower on the page, wall-clock) is clock time the lines ran. It is smaller than person-hours when many people work at once. They are two different measures.
Tiles: Total line hours 0.42 wall-clock, Shift headcount 17, Shift hours 3, Floaters 31, Day attainment 211.3 percent. Below, notes on roles with no hours and an orange box: 1 lane posted no labour hours.
Fig. 3The tiles under the headcount, and notes about hours that did not post. Picture of the to close before you can submit checklist to come.

Example

ExampleLine 4B ran two orders. QA-3101 built 118 of 300 planned: 118 ÷ 300 = 39%. QA-3102 built 3 of 189: 2%. The line row adds them: 121 of 489 = 25%. Actual labor is 0.64 + 0.17 = 0.81 person-hours. QA-3101 had 12 people for about 3 minutes, and 12 × 3.2 minutes ÷ 60 = 0.64 hours. The strip says 4B had 1 changeover, from QA-3101 to QA-3102.

If something goes wrong

  • A line shows 0 units or no hours. The pallets may not have been counted, or the line was closed with no taps. Reopen it (the Reopen button on its row), have the captain count, and close it again. For past days see Fix a shift.
  • A message names a line by a long code instead of its name. It is the same line. Look it up in the table.
  • The page says No lines are configured yet for the first few seconds. Wait. It fills in.
  • An orange box says 1 lane posted no labour hours. No hours were measured for that order. Nothing was made up. Add the hours in the Hour Tracker (how-to 5), or reopen the line and close it with a crew.

2. How to enter the shift headcount by role

Who: coordinator or above. When: after you have read the lines and before you submit.

Before you start

  • Get the real number of people who worked the shift, by role, from your sign-in sheet or your lead. Count each person once, even if they moved between lines.

Steps

  1. Scroll down to SHIFT HEADCOUNT BY ROLE.
  2. There is one box for each role: Line Captain, Material Handler, Assembler, QA / Gate Keeper and Temp. Under each box a small line shows what the tablets counted, for example from runs: 2.61 avg → 3.
  3. Type the real number of people for each role. Leave a role at 0 if nobody worked it.
  4. Check SHIFT TOTAL on the right. It is the sum of the boxes.
  5. Read the red or amber notes under the tiles. They tell you when the lane crews and your shift count do not match.
Shift headcount by role: Line Captain 1, Material Handler 1, Assembler 13, QA / Gate Keeper 2, Temp 0, Shift total 17. Tiles below: total line hours 0.42, shift headcount 17, shift hours 3, floaters 31.
Fig. 4One box for each role. The total is on the right.

Example

ExampleToday you had 1 line captain, 1 material handler, 13 assemblers and 2 QA people, and no temps. You type 1, 1, 13, 2 and 0. SHIFT TOTAL shows 17 (1 + 1 + 13 + 2 + 0). The SHIFT HEADCOUNT tile also says 17.

If something goes wrong

  • A note says 1 counted on the shift, 0 stated on a lane — 1 posted no hours. You counted someone, but no lane said where they worked, so they got no hours. Add their hours in the Hour Tracker, or put the role on the lane.
  • The Floaters tile shows a number. Floaters are people who moved between lines. They are shown, but never added twice into the total.
  • The boxes are grey and will not take typing. The day is already submitted. Reopen it first (how-to 3).
  • The Daily Synopsis later shows a different number. See the known issues. Yours is the right one.

3. How to submit the day and read the receipt

Who: coordinator or above. When: every line is closed, nothing is left in the checklist, and the headcount is in.

Before you start

  • No to close before you can submit box is showing.
  • The SHIFT HOURS tile has the hours worked. If it is empty, Beacon stops the submit with Shift hours needed and tells you how long the lines ran.

Steps

  1. Scroll to the bottom. The bar says Submitting locks the review and posts today's units and hours to Beacon.
  2. If you see a box Email the daily synopsis to N recipients, leave it ticked only if you want the email to go out now.
  3. Click Submit Shift Review.
  4. When it finishes, a receipt appears: Shift review submitted, the day, your name and the time.
  5. Read Posted to Beacon. There is one line for each order that was posted: units, hours and how much of the order is built.
  6. A box Close finished orders? may appear. Tick an order only if it is completely finished. Then click Close selected. If you are not sure, click Not now.
Shift review submitted, Fri Nov 6. Posted to Beacon: QA-3001 118 units 2.0 h, QA-3002 3 units 0.2 h, QA-3101 118 units 0.6 h, QA-3102 3 units 0.2 h. Changed by the re-post: QA-3101 and QA-3102 added. Reopen day for correction button. Close finished orders list below.
Fig. 5The receipt. If an order is not on this list, it was not posted.

Example

ExampleLine 4B was closed after the day was already submitted. You click Reopen day for correction, type the reason 4B closed after submit, and click Reopen day. A message says Day reopened for correction and the button at the bottom is now Re-post day. You click it. The receipt now lists QA-3101 (118 units, 0.6 h) and QA-3102 (3 units, 0.2 h), and says Changed by the re-post: QA-3101 — added (hours 0.6, units 118).

If something goes wrong

  • The receipt says Hours partially posted — PO … failed. Retry posting below. Click Retry posting hours.
  • You need to change something after you submitted. Click Reopen day for correction. It needs a reason. Fix what you need, then click Re-post day. For older days see Fix a shift.
  • An order is missing from Posted to Beacon, but the page said its units were included. See the known issues. Add its hours in the Hour Tracker (how-to 5).

4. How to check hours in the Hour Tracker

Who: coordinator or lead. When: before you save hours, or after, to be sure the day looks right.

Good to knowThe Hour Tracker is where you enter hours. It starts empty for the day and does not list hours that Shift Review already posted. To see what was posted, use the receipt in Shift Review (how-to 3) or Analytics → History.

Steps

  1. Go to Production and click Hour Tracker.
  2. Check Work Date at the top. It opens on today.
  3. Fill in the order (see how-to 5). As you type, the tiles at the top add up: total units, and hours for each role.
  4. Look at Pallets next to the units, for example ≈1.5 pallets. It is an estimate from the pallet size.
  5. Look at the bar at the bottom: 1 of 1 order(s) ready, the date and the number of crew heads entered.
  6. To see a day that is already posted, click Analytics and then History and choose the dates.
The Hour Tracker bottom bar. The order has 2 hours for Line Captain and 10 hours for Assembler, crew 1 and 5. The bar says 1 of 1 orders ready, 2026-11-07, 6 crew heads entered, and a Submit Hours button.
Fig. 6The bottom bar is your last check: how many orders are ready, the date, and the crew count.

Example

ExampleYou enter 40 units with 5 assemblers for 2 hours each and 1 line captain for 2 hours. The tiles show Line Captain 2.0 h and Assembler 10.0 h (5 × 2). The pallet line says about 1.5 pallets (40 ÷ 27 = 1.48). The bar says 6 crew heads (1 + 5).

If something goes wrong

  • The date is wrong. Hours are saved on the date at the top. Fix the date before you click Submit Hours.
  • The page says No orders added yet for a day you know had work. That is normal. The page does not load posted hours. Look in History.
  • The pallet line is missing. The material has no pallet size.

5. How to add hours by hand in the Hour Tracker

Who: coordinator or lead. When: a line did not use the tablet, or hours are missing from the day.

Before you start

  • You have the order number, the date, the units built, the hours for each role and the crew.

Steps

  1. Go to Production → Hour Tracker.
  2. Set Work Date to the day the work was done.
  3. Click Add Order.
  4. Under Production Order, pick the order. Leave Work Type on Unit build (units).
  5. Type Units Completed.
  6. Under Position Hours, type the total hours for each role that worked. Leave the others at 0.
  7. Under This Order's Crew, type how many people of each role worked this order.
  8. Optional: at the bottom, under Daily Headcount (whole shift), type everyone on the floor that day. Beacon splits it across the day's orders by hours.
  9. Click Submit Hours.
  10. You see Hours saved successfully. A box Candy Usage may open. Click Skip This Time unless you know which candy was used.
  11. You see All orders processed successfully and the form clears.
Hour Tracker for 11/07/2026. Order 1, QA-3101, Unit build, 40 units, about 1.5 pallets. Line Captain 2 hours, Assembler 10 hours. This order's crew: Line Captain 1, Assembler 5, total 6.
Fig. 7One order filled in: date, order, units, hours for each role, and crew.
A green Hours saved successfully message and a Candy Usage box asking which candy was used for work order QA-3101, with Skip This Time and Save Candy buttons.
Fig. 8The hours are already saved when this box opens. Skip it if you have nothing to add.

Example

ExampleSaturday 11/7, order QA-3101. Five assemblers worked 2 hours each and one line captain worked 2 hours. Date 11/07/2026, units completed 40, Line Captain 2, Assembler 10 (5 × 2), crew Line Captain 1 and Assembler 5. The bar says 1 of 1 order(s) ready · 6 crew heads. You click Submit Hours and see Hours saved successfully.

If something goes wrong

  • Beacon says Please add at least one order with units completed. Units completed is 0. A build order needs units.
  • The order is not in the list. It is not in the Build Schedule yet. Add it there first.
  • You saved the wrong date. Ask a lead who can correct it. See Fix a shift.