Beacon how-to · November 2026
Analytics numbers you can trust: six fixes
A review of every Analytics screen on 11/19 found numbers that were wrong or labelled wrong. This release fixes six of them. The biggest: the Dashboard's tiles now add up exactly the days you pick, not every calendar month the range touches. History shows one labor cost per order, long decimals are rounded, the Year to Date Excel drops a meaningless row, and the Dashboard and Executive Dashboard stop showing numbers that were always 100 %, N/A or 0.
- v2.196.0
Screenshots are from Beacon's test site. The test site has no BigQuery copy, so the Dashboard pictures show Ferrara's real 11/16–11/19 numbers fed into the page, and the Executive Dashboard pictures use test numbers.
1. Patch notes
v2.196.0 Nov 2026
- Dashboard: the tiles add up exactly the days you pick. “Last 7 Days” used to show the whole month. Units, Labor Hours, Est. Labor Cost and CPLH now cover the same days as the Trends charts. Tiles that still count whole months say so. Details
- History: the list and Build Details now agree on labor cost. Build Details priced Line Captain (and any role with its own rate) at the assembler rate. Now both use the rate in Settings → Labor Rates. Details
- Costing, Labor and Material Master: no more long decimals. “18.935999999999996” now reads 18.94, and “5.013999999999999s” reads 5.014s. Only the display changed. Details
- Year to Date Excel: “Total Headcount” is gone. It added up the monthly averages, so it meant nothing. “Avg Headcount” stays. Details
- Dashboard: two broken tiles removed, four renamed. “Efficiency” always showed 100.0 % and “Top Performing Line” always showed N/A. “Leads”, “Assemblers”, “Material Handlers” and “QA” showed hours, so they are now “Lead Hours” and so on. Details
- Executive Dashboard: “Closed Builds” is now “Builds”, because it counts builds of every status. “Past Due”, “Due Soon” and the “prod / non-prod” line are removed: they always showed 0. The same goes for the Excel export. Details
2. Dashboard: the days you pick
In Analytics → Dashboard, the tiles used to add up every calendar month the range touched. So “Last 7 Days” on 11/19 showed all of November, while the Trends charts and Top Performing Days underneath used the 7 days. Now the main tiles add up exactly the days in the Range box, the same days as the charts.
Example (Ferrara, Last 7 Days on 11/19):
| Tile | Before | Now |
|---|---|---|
| Units Completed | 29,360 (all of November) | 7,924 |
| Labor Hours | 4,562.8 | 1,167.5 |
| Est. Labor Cost | $102,206.27 | $26,233.73 |
| CPLH | 6.43 | 7.17 |
At Ferrara a whole month now matches the Monthly Synopsis to the cent: November 1–19 shows 29,360 units, 4,562.78 hours and $102,728.16 of labor on both. At Liberty and Buckner the Dashboard could show fewer units than the Monthly Synopsis, and the Dashboard was the right one (why). Since v2.197.0 the Monthly Synopsis matches there too.

2.1What each tile counts now
| Tile | Counts |
|---|---|
| Units Completed | Units posted on those days. The same as the Daily, Weekly and Monthly Synopsis. (Until v2.197.0 the Monthly Synopsis counted some orders twice: below.) |
| Labor Hours | Every hour posted on those days. |
| Est. Labor Cost | Each hour at its role's rate from Settings → Labor Rates. Line Captain is priced at its own rate ($24.84 at Ferrara), not the assembler rate. Avg Hourly Rate, Labor Cost / Unit and Total Labor Cost follow. |
| CPLH | Units ÷ hours, with changeover and morning start-up hours taken out of the hours. The same rule as Top Performing Days. |
2.2Tiles that still count whole months
Active Builds, Productivity Average, Build Status Overview, the other build-count tiles, Pallets Completed and the material and combined cost tiles still add up whole calendar months. They now say which months, under the number. A later update makes them exact too.

“Labor Total Hours” is gone from the tile list. It is now the same number as Labor Hours.
Some orders were counted twice, and now aren't. When one PO has two rows on the build schedule (a closed twin, a PO with two items, or a reused non-production PO), its units were counted once per row in the Units Completed Trend and in Top Performing Days. That happened on 2 days at Liberty (11/05 and 11/17) and 17 days at Buckner. Each order now counts once, in the tiles and the chart. Ferrara had none.
The Monthly Synopsis, the Executive Dashboard and the Dashboard's whole-month tiles now count those orders once too. The Monthly Synopsis counts units on the days they were posted, like the Dashboard, so the two match.
The Executive Dashboard, Build Status Overview and the Dashboard's other whole-month tiles (the build counts, Pallets Completed, Productivity Average and the material and combined cost tiles) put each PO in one month. A PO with two or more rows goes in the month it last posted units. With nothing posted yet, it goes in the month of its latest work date, then its latest due date.
Still different until a later update: the Executive Dashboard can put some units in another month than the Dashboard, or leave them out. That happens for a PO that runs across a month end, one used again for a new order in a later month, a one-order PO dated in another month than it posted, and units on a PO with no order it can date. When a reused PO's new order is dated in a later month, Build Status shows the closed order until the new order posts; a posting moves its work date to that day. The Executive Dashboard and the Dashboard's whole-month cost tiles price Line Captain hours (and any other role with its own rate) at the assembler rate. How it counts now · What can still differ.
The fullscreen view says it too. Fullscreen KPI Tiles shows the “Whole months” line under a tile that still counts whole months.
3. History: one cost per order
In Analytics → History, an order's card shows Est. Cost. Its Details panel shows Est. Labor Cost and a cost on every hour log. These used to be worked out two different ways:
- The card used each role's rate from Settings → Labor Rates, including roles with their own rate, like Line Captain.
- The Details panel only knew lead, material handler and assembler. Every other role was priced at the assembler rate.
Example (Ferrara, PO 1108451): the card said $12,799.64 and Details said $12,736.64. The $63 gap is the Line Captain hours priced at $22.40 instead of $24.84. In the 11/09–11/18 check, 13 of 24 Ferrara orders showed two different costs. Now both show the card's figure, $12,799.64.
- Open Analytics → History and pick the dates.
- Read Est. Cost on the order's card.
- Click Details. Est. Labor Cost is now the same number.



4. Rounded numbers
Some numbers are stored with a long tail of decimals. They showed on screen exactly as stored. Now they are rounded for display. The stored numbers and every price stay exactly the same.
| Where | Before | Now |
|---|---|---|
| Steps/Case, Steps/Pallet and Units/Hr in Costing, on the SKU's page and in the Material Master list | 18.935999999999996 | 18.94 (2 decimals) |
| Step seconds in Costing's movement picker, Build Step Detail, and Material Master's Add a step | 5.013999999999999s | 5.014s (3 decimals, as in the Steps list) |
| Labor tab and the planner's Labor Calculator: Engineered CPLH, Units/Hr and the summary's CPLH | 5.889340518601423 | 5.89 (2 decimals) |




5. Year to Date Excel
In History → Synopsis → Year to Date → Export → Export to Excel, the Summary sheet had a row Total Headcount. It added up each month's average headcount, which is not a count of anything.
Example (test site, 2026): July averaged 7.67 people a day, October 12 and November 23.2. The old row said 43. The real average across the year's working days is 15.6, the number on the screen. The row is gone. Avg Headcount stays, and it matches the screen.

6. Dashboard tile choices
Admins choose the Dashboard's tiles in Settings → Display Config → KPI Dashboard.
- Removed: “Efficiency”. It always showed 100.0 %, whatever happened on the floor. If your site had it on, it disappears from the Dashboard. Use Productivity Average.
- Removed: “Top Performing Line”. Nothing ever filled it, so it always said N/A. For the best days, see Top Performing Days on the Dashboard.
- Renamed: “Leads”, “Assemblers”, “Material Handlers”, “QA”. They said “headcount” but showed hours, rounded to whole numbers. They are now Lead Hours, Assembler Hours, Material Handler Hours and QA Hours, with one decimal. Your own label, if you typed one, is kept.

Nothing else to do. A saved tile setup that included the removed tiles keeps working, and the next Save drops them.
7. Executive Dashboard
Analytics → Executive Dashboard (Executive and Super Admin only).
- “Closed Builds” is now “Builds”. The number never was closed builds. It counts every build, any status, whose work date (or due date) falls in the months of the period. Since v2.197.0 a PO with two or more rows counts as one build, in the month it last posted units (how).
- Removed: “Past Due”, “Due in 10 Days” / “Due Soon”, and the “0 prod / 0 non-prod” line. They were never filled in, so they always read 0, which looked like good news. For due dates, use Build Schedule.
- Export Excel follows: “Total Builds” on the summary sheet, and the always-0 rows and columns are gone. Site Comparison now has 13 columns.
- Its numbers still cover whole months, except billing. Builds, units, hours, cost, CPLH, pallets and productivity add up every month the period touches. A line above the tiles says which months (for example “Every figure covers whole months: Oct 1 – Nov 30”) and that Billed Revenue and the Billing column cover the exact days. The period line in Export Excel names the months too. A later update moves the rest to exact days.
- Billed Revenue covers exactly the days picked. It used to add the day after the period: picking Oct 1–31 also billed Nov 1.



8. Questions
Did any saved cost or price change?
No. History, Costing and the Labor tab only changed how numbers are worked out for the screen or rounded on it. Nothing stored was rewritten. History's Build Details now shows the same cost as the card, which was already priced with your Labor Rates.
Why is Build Details' cost a little higher now for some orders?
It now prices roles with their own rate (Line Captain at Ferrara, $24.84) at that rate instead of the assembler rate. It matches the History card, the Daily Synopsis and billing.
We had the Efficiency tile on. What do we use instead?
Productivity Average for how you did against the standard, or CPLH for units per labor hour. Efficiency was a fixed 100 %, so nothing real is lost.
Will Past Due come back on the Executive Dashboard?
Yes, in a later update, worked out from the build schedule against your site's date. Until then it is left off rather than showing a 0 that isn't true.
Why did the Dashboard's Est. Labor Cost go up a little for a whole month?
Line Captain hours (and any role with its own rate) are now priced at that rate. At Ferrara that is $24.84 instead of the assembler's $22.40: about $522 more for Nov 1–19. It now matches the Monthly Synopsis and History.
Why is the Dashboard's CPLH different from the Daily Synopsis's?
They divide by different hours. The Dashboard uses every hour on the line, less changeover and morning start-up (like Top Performing Days). The Synopsis's “Units per assembly hour” uses assembly hours only, less start-up, and keeps changeover in. Compare Dashboard with Dashboard, and Synopsis with Synopsis.
Can I still compare one month with another?
Yes, and it's simpler now. Pick Oct 1–Oct 31, then Nov 1–Nov 30: the tiles cover exactly those days, the same days as the Monthly Synopsis.
Why did the Dashboard show fewer units than the Monthly Synopsis at Liberty or Buckner?
On a few days a PO there had two rows on the build schedule. The Dashboard counted that order once, which is right; the Monthly Synopsis and the Executive Dashboard counted it twice. Since v2.197.0 they count it once too, so the Monthly Synopsis matches the Dashboard. The Executive Dashboard can still put a PO's units in a different month: see what can still differ.