Beacon how-to · November 2026

Analytics numbers you can trust: six fixes

A review of every Analytics screen on 11/19 found numbers that were wrong or labelled wrong. This release fixes six of them. The biggest: the Dashboard's tiles now add up exactly the days you pick, not every calendar month the range touches. History shows one labor cost per order, long decimals are rounded, the Year to Date Excel drops a meaningless row, and the Dashboard and Executive Dashboard stop showing numbers that were always 100 %, N/A or 0.

  • v2.196.0

Screenshots are from Beacon's test site. The test site has no BigQuery copy, so the Dashboard pictures show Ferrara's real 11/16–11/19 numbers fed into the page, and the Executive Dashboard pictures use test numbers.

1. Patch notes

v2.196.0 Nov 2026

  • Dashboard: the tiles add up exactly the days you pick. “Last 7 Days” used to show the whole month. Units, Labor Hours, Est. Labor Cost and CPLH now cover the same days as the Trends charts. Tiles that still count whole months say so. Details
  • History: the list and Build Details now agree on labor cost. Build Details priced Line Captain (and any role with its own rate) at the assembler rate. Now both use the rate in Settings → Labor Rates. Details
  • Costing, Labor and Material Master: no more long decimals. “18.935999999999996” now reads 18.94, and “5.013999999999999s” reads 5.014s. Only the display changed. Details
  • Year to Date Excel: “Total Headcount” is gone. It added up the monthly averages, so it meant nothing. “Avg Headcount” stays. Details
  • Dashboard: two broken tiles removed, four renamed. “Efficiency” always showed 100.0 % and “Top Performing Line” always showed N/A. “Leads”, “Assemblers”, “Material Handlers” and “QA” showed hours, so they are now “Lead Hours” and so on. Details
  • Executive Dashboard: “Closed Builds” is now “Builds”, because it counts builds of every status. “Past Due”, “Due Soon” and the “prod / non-prod” line are removed: they always showed 0. The same goes for the Excel export. Details

2. Dashboard: the days you pick

In Analytics → Dashboard, the tiles used to add up every calendar month the range touched. So “Last 7 Days” on 11/19 showed all of November, while the Trends charts and Top Performing Days underneath used the 7 days. Now the main tiles add up exactly the days in the Range box, the same days as the charts.

Example (Ferrara, Last 7 Days on 11/19):

TileBeforeNow
Units Completed29,360 (all of November)7,924
Labor Hours4,562.81,167.5
Est. Labor Cost$102,206.27$26,233.73
CPLH6.437.17

At Ferrara a whole month now matches the Monthly Synopsis to the cent: November 1–19 shows 29,360 units, 4,562.78 hours and $102,728.16 of labor on both. At Liberty and Buckner the Dashboard could show fewer units than the Monthly Synopsis, and the Dashboard was the right one (why). Since v2.197.0 the Monthly Synopsis matches there too.

Dashboard tiles for Nov 14 to Nov 20: Active Builds 39 with the note Whole months Nov 1 to Nov 30, Units Completed 7,924, Labor Hours 1167.5, Est. Labor Cost 26,233.73 dollars, CPLH 7.17, and Productivity Average 75.9% with the note Whole months Nov 1 to Nov 30.
Fig. 1“Last 7 Days” on the test site with Ferrara's real 11/16–11/19 numbers fed in (its only posted days in that week). Units, hours, cost and CPLH are for those days. Active Builds and Productivity Average say “Whole months”.

2.1What each tile counts now

TileCounts
Units CompletedUnits posted on those days. The same as the Daily, Weekly and Monthly Synopsis. (Until v2.197.0 the Monthly Synopsis counted some orders twice: below.)
Labor HoursEvery hour posted on those days.
Est. Labor CostEach hour at its role's rate from Settings → Labor Rates. Line Captain is priced at its own rate ($24.84 at Ferrara), not the assembler rate. Avg Hourly Rate, Labor Cost / Unit and Total Labor Cost follow.
CPLHUnits ÷ hours, with changeover and morning start-up hours taken out of the hours. The same rule as Top Performing Days.

2.2Tiles that still count whole months

Active Builds, Productivity Average, Build Status Overview, the other build-count tiles, Pallets Completed and the material and combined cost tiles still add up whole calendar months. They now say which months, under the number. A later update makes them exact too.

Top Performing Days for Nov 16 to 19 next to Build Status Overview. Under the Build Status title it says Whole months Nov 1 to Nov 30, then Open 39, In Process 0, Completed 0, Closed 19, On Hold 0, Total Builds 58, Completion Rate 32.8%.
Fig. 2Top Performing Days lists the exact days. Build Status Overview says it covers Whole months: Nov 1 – Nov 30.

“Labor Total Hours” is gone from the tile list. It is now the same number as Labor Hours.

Some orders were counted twice, and now aren't. When one PO has two rows on the build schedule (a closed twin, a PO with two items, or a reused non-production PO), its units were counted once per row in the Units Completed Trend and in Top Performing Days. That happened on 2 days at Liberty (11/05 and 11/17) and 17 days at Buckner. Each order now counts once, in the tiles and the chart. Ferrara had none.

Changed in v2.197.0

The Monthly Synopsis, the Executive Dashboard and the Dashboard's whole-month tiles now count those orders once too. The Monthly Synopsis counts units on the days they were posted, like the Dashboard, so the two match.

The Executive Dashboard, Build Status Overview and the Dashboard's other whole-month tiles (the build counts, Pallets Completed, Productivity Average and the material and combined cost tiles) put each PO in one month. A PO with two or more rows goes in the month it last posted units. With nothing posted yet, it goes in the month of its latest work date, then its latest due date.

Still different until a later update: the Executive Dashboard can put some units in another month than the Dashboard, or leave them out. That happens for a PO that runs across a month end, one used again for a new order in a later month, a one-order PO dated in another month than it posted, and units on a PO with no order it can date. When a reused PO's new order is dated in a later month, Build Status shows the closed order until the new order posts; a posting moves its work date to that day. The Executive Dashboard and the Dashboard's whole-month cost tiles price Line Captain hours (and any other role with its own rate) at the assembler rate. How it counts now · What can still differ.

The fullscreen view says it too. Fullscreen KPI Tiles shows the “Whole months” line under a tile that still counts whole months.

3. History: one cost per order

In Analytics → History, an order's card shows Est. Cost. Its Details panel shows Est. Labor Cost and a cost on every hour log. These used to be worked out two different ways:

  • The card used each role's rate from Settings → Labor Rates, including roles with their own rate, like Line Captain.
  • The Details panel only knew lead, material handler and assembler. Every other role was priced at the assembler rate.

Example (Ferrara, PO 1108451): the card said $12,799.64 and Details said $12,736.64. The $63 gap is the Line Captain hours priced at $22.40 instead of $24.84. In the 11/09–11/18 check, 13 of 24 Ferrara orders showed two different costs. Now both show the card's figure, $12,799.64.

  1. Open Analytics → History and pick the dates.
  2. Read Est. Cost on the order's card.
  3. Click Details. Est. Labor Cost is now the same number.
History card for test PO 1056298: 40 units, 191.0 hours, CPLH 0.4, 10 workers and an Est. Cost of 4,429.23 dollars, worked 07/02/2026 to 07/03/2026, with a Details button.
Fig. 3The card: Est. Cost $4,429.23 (test data).
Build Details, Labor Summary for the same order: Total Hours 191.00, Est. Labor Cost 4,429.23 dollars, Units per Labor Hour 0.44, and hours by role: VAS Lead 20, VAS Material Handler 11, VAS Assembler 140, VAS QA 20.
Fig. 4Build Details: Est. Labor Cost is the same $4,429.23. Before this fix it said $4,437.23 on the test site.
Hour Logs table in Build Details. The QA row shows 10 hours at 220.00 dollars, which is the 22 dollar QA rate from Labor Rates. The other rows show Lead 240.00, Material Handler 339.30, Assembler 672.00 and a Temp Worker 896.00.
Fig. 5Each log's Cost uses the same rates. The QA row is 10 h × $22 = $220.00, the QA rate set on the test site (it used to say $224.00). The panel's Export file uses these costs too.

4. Rounded numbers

Some numbers are stored with a long tail of decimals. They showed on screen exactly as stored. Now they are rounded for display. The stored numbers and every price stay exactly the same.

WhereBeforeNow
Steps/Case, Steps/Pallet and Units/Hr in Costing, on the SKU's page and in the Material Master list18.93599999999999618.94 (2 decimals)
Step seconds in Costing's movement picker, Build Step Detail, and Material Master's Add a step5.013999999999999s5.014s (3 decimals, as in the Steps list)
Labor tab and the planner's Labor Calculator: Engineered CPLH, Units/Hr and the summary's CPLH5.8893405186014235.89 (2 decimals)
Costing SKU card for test SKU 60009224: Cases/Pallet 8, Units/Hour 8.3, Steps/Case 105, Steps/Pallet 18.94.
Fig. 6Steps/Pallet reads 18.94. The SKU stores 18.935999999999996.
The movement picker in Costing, filtered to label: LBL-001 Apply case/ Shipper label, case, 5.014 seconds.
Fig. 7The movement picker: LBL-001 reads 5.014s.
Build Step Detail rows after Calculate. Each row shows count times seconds times rate, for example 58 times 95.861 seconds times 33.93 dollars an hour, and its cost.
Fig. 8Build Step Detail: seconds show at most 3 decimals.
Analytics, Labor tab, Production Parameters: Engineered CPLH 11.65.
Fig. 9Labor tab with a group picked: Engineered CPLH 11.65.

5. Year to Date Excel

In History → Synopsis → Year to Date → Export → Export to Excel, the Summary sheet had a row Total Headcount. It added up each month's average headcount, which is not a count of anything.

Example (test site, 2026): July averaged 7.67 people a day, October 12 and November 23.2. The old row said 43. The real average across the year's working days is 15.6, the number on the screen. The row is gone. Avg Headcount stays, and it matches the screen.

Year to Date Summary 2026 on the test site: 12 working days, Avg Headcount 15.6, Total Hours 1,183.8, Total Units 11,895, Avg CPLH 11.8.
Fig. 10The screen shows Avg Headcount 15.6. The Excel now has 15.58 and no Total Headcount row.

6. Dashboard tile choices

Admins choose the Dashboard's tiles in Settings → Display Config → KPI Dashboard.

  • Removed: “Efficiency”. It always showed 100.0 %, whatever happened on the floor. If your site had it on, it disappears from the Dashboard. Use Productivity Average.
  • Removed: “Top Performing Line”. Nothing ever filled it, so it always said N/A. For the best days, see Top Performing Days on the Dashboard.
  • Renamed: “Leads”, “Assemblers”, “Material Handlers”, “QA”. They said “headcount” but showed hours, rounded to whole numbers. They are now Lead Hours, Assembler Hours, Material Handler Hours and QA Hours, with one decimal. Your own label, if you typed one, is kept.
KPI Dashboard Tiles settings list showing Temp Hours, Lead Hours, Assembler Hours, Material Handler Hours and QA Hours, each with a tick box and a label box.
Fig. 11The tile list now says “Lead Hours” and so on. “Efficiency” and “Top Performing Line” are not in the list or under KPI Thresholds.

Nothing else to do. A saved tile setup that included the removed tiles keeps working, and the next Save drops them.

7. Executive Dashboard

Analytics → Executive Dashboard (Executive and Super Admin only).

  • “Closed Builds” is now “Builds”. The number never was closed builds. It counts every build, any status, whose work date (or due date) falls in the months of the period. Since v2.197.0 a PO with two or more rows counts as one build, in the month it last posted units (how).
  • Removed: “Past Due”, “Due in 10 Days” / “Due Soon”, and the “0 prod / 0 non-prod” line. They were never filled in, so they always read 0, which looked like good news. For due dates, use Build Schedule.
  • Export Excel follows: “Total Builds” on the summary sheet, and the always-0 rows and columns are gone. Site Comparison now has 13 columns.
  • Its numbers still cover whole months, except billing. Builds, units, hours, cost, CPLH, pallets and productivity add up every month the period touches. A line above the tiles says which months (for example “Every figure covers whole months: Oct 1 – Nov 30”) and that Billed Revenue and the Billing column cover the exact days. The period line in Export Excel names the months too. A later update moves the rest to exact days.
  • Billed Revenue covers exactly the days picked. It used to add the day after the period: picking Oct 1–31 also billed Nov 1.
Aggregate KPIs for two test sites: Total Units 17,200, Productivity 97.0%, Cost per Unit 3.29 dollars, CPLH 6.9, Pallets Built about 286.7, Pallets per Hour 0.12, Billed Revenue 8,365 dollars for 1 of 2 sites. There are no Past Due or Due in 10 Days tiles.
Fig. 12The top tiles start at Total Units. Test numbers fed into the page.
Site Comparison table with columns Site, Builds, Units, Pallets, Hours, Pallets per Hour, CPLH, Productivity, Cost per Unit, Total Cost and Billing, for two test sites with 40 and 18 builds.
Fig. 13Site Comparison: Builds right after Site. No Past Due or Due Soon columns. Test numbers.
Executive Dashboard for the period Oct 22 to Nov 20, 2026. Above the tiles a line says: Every figure covers whole months: Oct 1 to Nov 30. Exception: Billed Revenue and the Billing column cover the exact days. Tiles: Total Units 160,800, Productivity 92.5%, Cost per Unit 4.37 dollars, CPLH 6.9, Pallets Built about 2,566.7, Pallets per Hour 0.11, Billed Revenue 8,365 dollars for 2 of 17 sites.
Fig. 14For a period of Oct 22 – Nov 20, the line says every figure covers Oct 1 – Nov 30, except Billed Revenue and the Billing column. Test numbers.

8. Questions

Did any saved cost or price change?

No. History, Costing and the Labor tab only changed how numbers are worked out for the screen or rounded on it. Nothing stored was rewritten. History's Build Details now shows the same cost as the card, which was already priced with your Labor Rates.

Why is Build Details' cost a little higher now for some orders?

It now prices roles with their own rate (Line Captain at Ferrara, $24.84) at that rate instead of the assembler rate. It matches the History card, the Daily Synopsis and billing.

We had the Efficiency tile on. What do we use instead?

Productivity Average for how you did against the standard, or CPLH for units per labor hour. Efficiency was a fixed 100 %, so nothing real is lost.

Will Past Due come back on the Executive Dashboard?

Yes, in a later update, worked out from the build schedule against your site's date. Until then it is left off rather than showing a 0 that isn't true.

Why did the Dashboard's Est. Labor Cost go up a little for a whole month?

Line Captain hours (and any role with its own rate) are now priced at that rate. At Ferrara that is $24.84 instead of the assembler's $22.40: about $522 more for Nov 1–19. It now matches the Monthly Synopsis and History.

Why is the Dashboard's CPLH different from the Daily Synopsis's?

They divide by different hours. The Dashboard uses every hour on the line, less changeover and morning start-up (like Top Performing Days). The Synopsis's “Units per assembly hour” uses assembly hours only, less start-up, and keeps changeover in. Compare Dashboard with Dashboard, and Synopsis with Synopsis.

Can I still compare one month with another?

Yes, and it's simpler now. Pick Oct 1–Oct 31, then Nov 1–Nov 30: the tiles cover exactly those days, the same days as the Monthly Synopsis.

Why did the Dashboard show fewer units than the Monthly Synopsis at Liberty or Buckner?

On a few days a PO there had two rows on the build schedule. The Dashboard counted that order once, which is right; the Monthly Synopsis and the Executive Dashboard counted it twice. Since v2.197.0 they count it once too, so the Monthly Synopsis matches the Dashboard. The Executive Dashboard can still put a PO's units in a different month: see what can still differ.