Beacon how-to · November 2026

A PO with two build rows now counts once

Sometimes one PO has two rows on the Build Schedule. Usually an order was closed and a new order was added on the same PO. The Monthly Synopsis, the Executive Dashboard and the Dashboard's build counts counted that PO once for each row. Now they count it once.

  • v2.197.0

1. What changed

A PO with two or more rows now counts once here:

  • Monthly Synopsis (and Year to Date): Total Units, Avg CPLH and productivity, and Year to Date's Top Materials. The hours and units in Work Orders Summary. The units and CPLH in Daily Breakdown.
  • Executive Dashboard: Builds, Total Units, Pallets Built and Productivity, and what is worked out from them: Cost / Unit, Pallets / Hour, CPLH and the Site Comparison's Total Cost.
  • Dashboard: Build Status Overview and the build tiles (Total Builds, Completed Builds, Closed Builds, Open Builds and the rest). Also the tiles that still count whole months: Total Material Cost, Combined Total Cost, Cost Per Unit, Cost Per Hour, Material Cost %, Labor Cost %, Pallets Completed and Productivity Average. Labor Cost % moves only because the material cost beside it moves; the labor dollars don't.
  • Labor Analyzer: its CPLH from past months, which it reads from the last 6 Monthly Synopses.

These did not change:

  • Total Hours and labor cost in dollars. They were never counted twice, and read the same as before on every screen.
  • The Daily and Weekly Synopsis. They already counted each PO once.
  • The Dashboard's day tiles: Units Completed, Labor Hours, Est. Labor Cost and CPLH (Units Per Labor Hour). They were fixed in v2.196.0.
Numbers can go downPast months on these screens can show fewer units, builds and pallets than before. That is the second count of a PO coming out. Nothing that was built has been lost.

2. Why it counted twice

Hours are posted against a PO, not against a row. A report looks up the PO's row to find its item. When a PO had two rows, the report found both, and counted the PO's posted units and hours once for each.

There was a second cause. While the PO has an open order, that order carries the PO's whole built total, and a closed order keeps the total it had when it closed. Once every order on the PO is closed, each row carries the whole total. The Executive Dashboard and the build counts added the rows together, so a PO's units could count up to twice, and the PO counted as two builds.

Now each report uses one row per PO. The PO's live row speaks for it: the open order if there is one, else the first row. Section 5.1 has the one exception.

3. An example

Made-up numbers. An order built all 2,000 units of a PO in the month, logged 100 hours, and was closed. Then the same PO came in again as a new Open order, dated in the same month. The Build Schedule now has two rows for that PO.

WhereBeforeNow
Monthly Synopsis, Total Units (this PO's part)4,000Right2,000
Monthly Synopsis, Work Orders Summary hours200Right100
Executive Dashboard, Total Units4,000Right2,000
Executive Dashboard, Builds2Right1
Dashboard, Total Builds2Right1
Total Hours and labor cost, every screen100 h100 h, no change

The rates move too, differently on each screen:

  • Executive Dashboard: the PO's units counted twice but its labor hours did not, so CPLH and Pallets / Hour were too high and Cost / Unit too low. They move back now. Its Productivity, like the Dashboard's Productivity Average, can go either way.
  • Monthly Synopsis: the PO's units and its assembly hours both counted twice, so Avg CPLH and productivity leaned toward that PO. They can now go up or down.

4. Which month a PO counts in

This is for the Executive Dashboard and the Dashboard's whole-month and build tiles. They put each PO in one month. The Monthly Synopsis and the Dashboard's day tiles count units on the days they were posted, so they don't need this rule.

  • A PO with one row counts in the month of its work date, or its due date if it has no work date. Same as before.
  • A PO with two or more rows counts in the month of its last posting: the last day units were posted for that PO. If nothing has been posted yet, it counts in the month of its latest work date, then its latest due date.
Why the last postingThe new row's work date may only be a plan. It comes from a schedule upload, or from dragging the order on the calendar. Made-up example: the first order built 2,000 units, posted on the 17th. The new order is planned for the 2nd of next month. The PO counts this month, where the units were built. A planned date does not move it to next month.

5. A PO used again for a new order

Sometimes an order builds units and is closed, and later a new order is added on the same PO. The PO still counts once, in one month. Two things follow.

5.1Which order Build Status shows

An order is dated by its work date, or by its due date if it has none. When the new order is dated in a later month than the PO's last posting, the month of that posting shows the latest order dated in or before that month, usually the closed one. The new order does not show as Open or past due there until it posts. A posting moves its work date to that day, so it then shows in the month it posted.

  • A new order dated in the same month as the last posting shows its own status there instead. Open shows Open. Pending or Allocated take the finished order out of Total Builds, which counts only Completed, Closed, Open, In Process and On Hold.
  • A new order that posted and was then moved to a later month, on the calendar or in Edit Order, makes the month it posted in show the older closed order until it posts again.
  • If no order is dated in or before that month (for example the closed order has only a due date after it), the new order shows there.

5.2When the new order posts in a later month, the whole PO moves there

The Executive Dashboard and the Dashboard's whole-month tiles then count all of the PO's units in the later month. The earlier month drops them.

Made-up exampleOctoberDecember
What was posted: the first order builds 500 in October and closes. A new order on the same PO builds 700 in December.500700
Monthly Synopsis, Dashboard day tiles500700
Executive Dashboard, Dashboard whole-month tilesMoves01,200

So a past month on the Executive Dashboard and the Dashboard's whole-month tiles can go down after the fact. No PO is like this today. Phase 2 of the analytics work ends it: the Executive Dashboard will count units on the days they were posted, like the Dashboard.

6. What can still differ

None of these is a PO counting twice.

6.1A PO that runs across a month end (until Phase 2)

The Executive Dashboard counts a PO's units in one month. Made-up example: a PO builds 1,000 units on the last day of a month and 400 on the first day of the next. The Dashboard and the Monthly Synopsis show 1,000, then 400. The Executive Dashboard shows all 1,400 in one of the two months. Phase 2 fixes this.

6.2A PO used again for a new order (until Phase 2)

See section 5.

6.3Line Captain hours in the whole-month cost figures

The Executive Dashboard, and the Dashboard's whole-month cost tiles, price Line Captain hours (and any other role with its own rate) at the assembler rate. The Dashboard's Est. Labor Cost and Total Labor Cost use their own rate, so the two can differ by those hours.

6.4Units the Executive Dashboard can't place in a month

Units posted on a PO that has no order on the Build Schedule, or on an order saved with dates the reports can't read, count on the Monthly Synopsis and the Dashboard but not on the Executive Dashboard.

6.5A one-order PO dated in another month

The Executive Dashboard counts a PO with one order in the month of its work date, or its due date. When that date is in a different month from the days its units were posted, the units count in that other month there.

6.6Two small gaps in the Monthly Synopsis tables

  • When a PO has two hour records on the same day, such as a build record and a sub-assembly record, Work Orders Summary shows that day's hours twice. Total Hours at the top is right.
  • A record with units but no hours logged is missing from the Daily Breakdown and Work Orders Summary units. Total Units at the top is right.

Both are older than this change, and are on the list to fix.

7. Check it yourself

  1. Pick a whole month that is over.
  2. Open History, then Synopsis → Monthly Synopsis, and pick that month. Note Total Units.
  3. Open Dashboard and set the dates to the same month, first day to last. Note Units Completed. It matches Total Units.
  4. Open Executive Dashboard for the same month and site. Total Units is usually the same; section 6 says why it can differ.

If the Monthly Synopsis and the Dashboard don't match, tell your Beacon admin which site and month.

8. Questions

Did Total Hours or labor cost change?

No. They were never counted twice. The hours behind Work Orders Summary, and behind the Monthly Synopsis's Avg CPLH and productivity, were. Work Orders Summary hours now match Total Hours, apart from the gap in section 6.6. The Dashboard's Labor Cost % moves, because the material cost beside it moves.

Why did a past month go down?

That month had a PO with two rows, and it was counted twice. The new number is the right one. On the Executive Dashboard and the Dashboard's whole-month tiles it can also be a PO used again for a new order that posted in a later month (section 5.2).

How do I spot a PO with two rows?

On the Build Schedule, pick All, then search for the PO. If two orders come up (often both Closed), it has two rows.

Do I need to change how I work?

No. Closing an order and adding the next one on the same PO is fine. The reports now handle it.