Beacon how-to · November 2026

Costing: type a step's count or cases per pallet, and the captain's whole run

You can type the count on a step Beacon counts for you, or a different cases per pallet for an existing SKU, and a site can charge the Line Captain for the whole run. All of them change the quote only. Nothing on the SKU changes.

  • v2.183.0
  • v2.193.0
  • v2.194.0

1. Type the count on an auto step

In Material Master → Costing, pick a material or a group and click Calculate.

Under Build Step Detail, some pre- and post-build steps are counted by Beacon from the BOM. They used to say “auto count”. Now the count itself is in the box.

  1. Type the number you want. For example, type 12 where Beacon says 19.
  2. The step cost and the quote total change right away.
  3. The row still shows Beacon's own count (auto 19) and a Reset button.

Leave the box empty to use Beacon's count. Reset counts at the top of Build Step Detail clears all of them.

Build Step Detail row with a count box holding 4, the text auto 0, and a Reset button.
Fig. 1A typed count of 4 where Beacon counted 0. Reset puts Beacon's count back.

The count stays on that quote:

  • Save to Archive keeps it, and reopening the quote brings it back.
  • The SKU, its BOM and Save as new SKU never change.
  • Steps that aren't counted from the BOM keep their × box as before.
Shift rolesA step done by a shift role (like the LTO) shows its cost in Build Step Detail but does not change the total. That role is already paid a full shift.

2. The Line Captain is paid for the whole run

When a site turns it on, the Line Captain is charged at the captain rate for the build's whole run, not just the captain's own steps.

The captain is still one of the crew. Those hours come out of the assembler line. Headcount and run length do not change. Only the rate on those hours changes.

ExampleA build that fills a shift pays the captain the whole shift. A 3-hour build pays 3 hours.

On a site that pays 8 hours for 7.5 worked, the captain's row is in paid hours, so it reads a little longer than the run on the headcount tile. See 7. Worked and paid hours.

Quote cost breakdown. Line Captain, 3.2h (whole run). Material Handler, 7.88h fixed (1x shift plus 5% indirect).
Fig. 2The quote line says “(whole run)”. Demo data.

3. The indirect % on shift roles

When a site turns it on, shift roles like the LTO carry the site's indirect % too, the same as the crew.

ExampleAt 5%, an LTO shift of 8 hours is quoted as 8.4 hours.

The quote line says + 5% indirect.

4. Turning them on (Admins)

  1. Go to Settings → Labor Rates, under the roles.
  2. Tick Add the indirect % to shift roles (like the LTO).
  3. Pick a role in Charged for the whole run, or pick None to turn it off.
  4. Click Save changes.
Settings, Labor Rates. The box Add the indirect percent to shift roles (like the LTO) is ticked. Charged for the whole run is set to Line Captain.
Fig. 3Both settings in Labor Rates.

Both are off until a site sets them, so other sites' quotes do not change.

5. Type cases per pallet on an existing SKU

In Material Master → Costing, mode Existing Material, pick the SKU. Cases/Pallet on the card is now a box holding the SKU's own number.

Costing card for 60008691. Cases/Pallet box holding 35, the line This quote only, the SKU is not changed. Units/Hour 2.74, Steps/Case 347.28, Steps/Pallet 12.
Fig. 4The SKU's own 35 in the box. Units/Hour now shows 2 decimals (2.74). Demo data.
  1. Type the cases per pallet you are quoting. For example, type 40 where the SKU says 27.
  2. The card shows the SKU's number (SKU 27) and a Reset button.
  3. Pallets, every per-pallet step and the quote total change right away.
Costing card for 60007392 with 40 typed in the Cases/Pallet box, the text SKU 27 and a Reset button.
Fig. 540 typed where the SKU says 27. Demo data.
Calculation results. Total quoted 134,800.56 dollars. Pallets 25 required.
Fig. 61,000 units at 40 per pallet is 25 pallets (38 at 27). Demo data.

Leave the box empty, or click Reset, to use the SKU's number. It takes whole numbers of 1 or more. Anything else turns the box red and holds Calculate and Save to Archive until it is fixed.

Cases/Pallet box with 2.5 typed, a red outline, and the text Whole number, 1 or more.
Fig. 72.5 is refused.

The number stays on that quote:

  • Save to Archive keeps it, and Open in calculator brings it back at the same price.
  • The SKU never changes. Its pallets in the planner, Checkpoint and the boards stay as they are. To change the SKU for good, edit it in Material Master.
  • Picking another SKU clears it.
  • Save as new SKU keeps the SKU's own number, and its window says so.
New SKU from this material window. Line reads: The cases/pallet typed on this quote stays on this quote, the new SKU keeps 27.
Fig. 8Save as new SKU says the copy keeps 27.
SKU on an overrideA SKU priced at an override rate keeps it. Typing 36 instead of 35 nudges the price. It does not jump back to the steps' rate.

6. Reopen a saved quote

Under Saved quotes, click Open in calculator. The top of the calculator now shows the quote's own name. Below it, it shows the SKU or group the quote was built from and the date it was saved.

This helps when a quote is built on a stand-in SKU. The Material box still shows that stand-in SKU, and the name above says which quote it is.

A box at the top of Cost Calculation reads Saved quote, DEMO saved before ADR-073 Am, Built from 60008563, saved 11/14/2026, Saved at 135,614.35 dollars, today's standards price it at 135,628.62 dollars (plus 14.27). The Material box below shows 60008563.
Fig. 9A reopened quote named at the top, with its saved total beside today's. Demo data.

Saved price and today's price

A reopened quote is priced with today's standards. If a standard changed since it was saved, the total can come back different. The box says so instead of changing it quietly:

  • Before you click Calculate: Saved at $4,601.26.
  • After: Saved at $4,601.26 · today's standards price it at $4,668 (+$67), rounded here, or the same today.

Change anything that moves the price (quantity, markup, cases per pallet, a step, a count) and the box says edited since saved. Today's total is then a different quote, so it is no longer compared with the saved one. Put the input back and the mark goes away.

The Saved quote box with a small label, edited since saved. Line: Saved at 135,614.35 dollars, edited since, so today's total is a different quote.
Fig. 10Cases per pallet changed after reopening. Demo data.

The name goes away when you pick another SKU or group, or after Save to Archive, because the calculator no longer shows that saved quote.

7. Worked and paid hours

On a site that pays 8 hours for 7.5 worked (like Ferrara), the quote shows two kinds of hours:

  • The Headcount tile shows the run in worked hours: 10.7 h run (worked).
  • The role rows show paid hours. The Line Captain's row names the same run: 11.4h (whole 10.7 h run, paid).
Example10.7 worked hours × 8 ÷ 7.5 = 11.4 paid hours. It's the same run, not two different ones, and nothing is charged twice.
Results. Headcount tile 12, 359.6 h run (worked). Grey lines: Crew steps 4109.4h (+5% = 4314.9h worked), Material Handler steps 28.5h, covered by its shift. Labor 4602.6 h. Row: Line Captain, 383.6h (whole 359.6 h run, paid).
Fig. 11359.6 worked hours on the tile, 383.6 paid hours for the captain's whole run, and the crew line above Labor. Demo data.

The crew line

The 5% indirect is on every role. The crew (Assembler and Line Captain) get it on their hours. The LTO gets it on its shift: 8 hours + 5% = 8.40 hours.

The grey Crew steps line shows the crew's step hours, then the same hours with the 5% added. The LTO's own steps are listed apart, because the LTO is already paid a whole shift for them.

ExampleCrew steps 144.5h (+5% = 151.7h worked). 151.7 × 8 ÷ 7.5 = 161.8 hours, the same as the Labor line under it.

8. Steps with no role or Job are priced

Some steps have no role and are in no Job (“Anyone on Line”). The quote used to leave them out of the price. Now they are priced at the assembler rate, in an Unassigned row.

An amber line under the rows names those steps and their step time, so you can give each one its real role or Job in Material Master → Jobs. The Unassigned row shows a little more than the step time, because it adds the indirect % and paid hours; the line says so.

Cost breakdown. Row: Unassigned, 0.5h times 22.40 dollars per hour, 10.88 dollars. Amber line: 0.4 h of step time with no role or Job (PRNT-002) is priced at the assembler rate. The Unassigned row shows 0.5 h: the same time with indirect percent and paid hours. Give these steps a role or Job in Material Master, Jobs.
Fig. 12PRNT-002 has no role: it is now in the price, and named. Demo data.
ExampleA quote with 2.2 hours of INS-005 “Insert top filler into display” at 1,000 units goes up by about $66 at Ferrara's rates and 20% markup. Before, those 2.2 hours were left out.
  • Quotes already saved keep their price. Open one in the calculator and the box at the top shows the saved total beside today's (see 6. Reopen a saved quote).
  • A step moved to the LTO or Material Handler leaves the crew. The LTO's shift already pays for it.