Beacon how-to · November 2026

Margin by SKU

A weekly view, SKU by SKU: hours worked against Beacon's standard, what the labor cost, what Beacon's own quote says it should cost, and what the customer was billed. It shows the margin and the markup, and flags SKUs that lose money or are marked up 40% or more.

  • v2.178.0
Changed in v2.196.0By SKU now covers a week, a month or a quarter, uses the Daily Synopsis's column names (Planned Cost, Customer Billing Cost and the two margins), keeps Markup % and Quote markup % in Export margin only, and renames the “Marked up 40%+” flag “Billing 40%+ over Actual” (same rule). See Margins for a week, a month or a quarter.

1. What it shows

One row per SKU for one week, Sunday to Saturday. That is the same week as the bill, so the Billed column matches the weekly bill to the cent.

ColumnWhat it means
UnitsFinished units posted in Shift Review that week. The same quantity the bill charges.
Hours workedHours posted for the SKU's POs, every role.
Standard hrs (Beacon steps)What Beacon's steps say those units should take. Not the cases-per-hour typed on the SKU.
% of standardHours worked ÷ standard hours, leaving out changeover and morning start-up hours, like History's CPLH and Plan vs Actual. Those hours still count in cost. Over 100% means the SKU took more hours than the standard. Under 100% means it took fewer.
Actual cost (incl. LTO/QA)Posted hours × role rates, plus LTO/QA for the SKU's own Checkpoint run time, less unpaid downtime such as lunch. A line-day never pays more than one paid shift of LTO/QA.
Engineered costBeacon's own quote before markup: steps × role rates + indirect % + LTO/QA.
BilledUnits × the customer rate.
Margin $Billed − actual cost.
Markup %How far billed is over actual cost. Cost $10, billed $14 = 40%.
Quote markup %How far billed is over the engineered cost: is the price right against our own standard?
Who sees it

Leads and above, the same people who see the Billing tab. Workers, Viewers and board links do not.

2. Open it

  1. Click Analytics → Analytics, then the Billing tab.
  2. Click By SKU at the top. Bill takes you back to the bill.
  3. Use the arrows to pick the week. The week is named by its Saturday: Week ending 10/17/2026.
Analytics, Billing tab, with the Bill and By SKU switch, the week picker and the Export margin button
Fig. 1Analytics → Analytics → Billing → By SKU. The arrows change the week, Sunday to Saturday.

3. Read a row

Example from the demo week: DEMO-SKU-A built 1,200 units. Labor cost $4,245.00 and the customer was billed $7,200.00. Margin $2,955.00, markup 69.6% over cost, so it is flagged Marked up 40%+.

The two flags

  • Losing money (red): billed is less than the actual cost.
  • Marked up 40%+ (amber): billed is 40% or more over the actual cost.

Flagged rows sit at the top. Click any column header to sort by it.

Margin by SKU for a demo week: four SKUs, one flagged Losing money and one flagged Marked up 40%+
Fig. 2A demo week. DEMO-SKU-B bills $2,000.00 against $2,684.68 of labor (Losing money). DEMO-SKU-A bills 69.6% over cost (Marked up 40%+).

Open a SKU to its POs

Click the arrow on a row to see each PO behind it. A PO posted on a day with no Checkpoint run says LTO/QA not charged on 1 day(s): no Checkpoint run, because Beacon cannot tell which line it was on.

DEMO-SKU-D opened to its one PO, which says LTO/QA was not charged on 1 day with no Checkpoint run
Fig. 3DEMO-SKU-D opened to its PO. One posted day had no Checkpoint run, so no LTO/QA was charged for it.

When a number is “—”

Beacon shows — instead of a guess, never $0. Hover it to see why:

  • No customer rate for this SKU: Billed, Margin and Markup stay empty and the SKU is left out of those totals.
  • No Beacon steps to quote this SKU: no engineered cost.
  • No hours posted for this SKU: units were posted with no hours, so there is no actual cost.

Under the table, a short list says how many SKUs were left out of each total.

The total row and the list of what was left out of the totals
Fig. 4Totals add only the SKUs that have each figure. The lines underneath say what was left out.

4. Load the customer rates first

Billed comes from the customer rates. Until an Admin imports them (Import customer rates on the Billing tab, the rate workbook's SKU and Correct Rate columns), every Billed, Margin and Markup reads — and the screen says so.

Customer rates

Customer rates come from Analytics → Analytics → Billing → Import customer rates (Admin). A SKU that is not in the rate table shows — for Billed, Margin and Markup. An import adds or changes rates. It never deletes any.

5. Export it

On By SKU, click Export margin. The Excel file has a Margin by SKU sheet and a POs sheet. It is a separate file from the bill: the bill you send the customer never carries cost or margin.

6. Check it by hand

Pick one SKU and its week:

  1. Billed: add up that SKU's Charge on the Bill view. It is the same number.
  2. Posted labor: hours per role from Shift Review × that role's rate in Settings → Labor Rates.
  3. LTO/QA: take the PO's Checkpoint run time on that line and day, less unpaid downtime such as lunch. Charge those hours for each fixed role in Settings → Labor Rates: its rate × its people per line, plus the indirect % if your site has it on. A line-day never pays more than one paid shift: if its runs add up to more, each PO's share shrinks in proportion to its minutes. A role that posted its own hours that day is not charged again.
  4. Markup: billed ÷ actual cost − 1.

Numbers move when a step, a role rate or a customer rate changes: everything is worked out when you open the screen.