Beacon how-to · November 2026
How-to library
Step-by-step guides for every everyday job in Beacon, in the order the day runs: the floor, the end of the shift, planning, materials, reports and settings. Each guide has numbered steps, pictures, a worked example and what to do when something goes wrong.
Every guide was checked on Beacon's test site in November 2026. Screenshots use demo data, not real orders, items or sites. Where a known problem touches a step, the guide says so and gives the safe way around it.
1. Checkpoint: running a line
Leads and line captains on the floor tablet: start a line, count pallets, log downtime, change over, close out.
2. Shift Review and Hour Tracker
Coordinators at the end of the shift: check each line, enter headcount, submit the day, check and fix hours.
3. Build Schedule
Read the order list, add and find orders, change status, close orders, upload the weekly schedule, export, calendar.
4. Labor Planner and Coverage
Plan the week and the day, move and shorten blocks, roll a balance forward, read crew warnings and stock coverage.
5. Material Master and quotes
Find and add SKUs, set steps and crew, quote a SKU, use the Build Calculator, view a line layout.
6. History, synopses and Analytics
Look up a past day, read and print the Daily Synopsis, Monthly and Yearly, Analytics Build and Costing, audit log.
7. Analytics: what you can see and compare
Every report and calculator in the Analytics menu: who sees it, how its numbers add up, and why the same word can mean two different numbers on two screens.
- Start here: the Analytics menu, and who sees what
- How to read the Dashboard
- How to look up past orders and SKUs in History
- How the Daily, Weekly, Monthly and Year to Date reports add up
- How to use Build, Labor, Costing, Plan vs Actual and Billing
- Same word, different number: Billed, Actual cost, week, hours, CPLH
- Worked questions: lost money, a complete week, a month's margin, 4.7 vs 5.08 hours
- Where the numbers come from, and who keeps them right
8. Settings and your account
Sign in, switch sites, labor rates, paid or unpaid lunch and break, changeover minutes, what the synopsis shows, feedback, roles.
More how-tos
- Production workflow — from schedule file to verified labor hours, who does what.
- Fix a shift after it’s over — what you can fix in Shift Review, and what to send to John.
- Weekly Synopsis — a Monday to Sunday week in History.
- Daily Synopsis: cost and margin — Planned, Actual and Customer Billing for each order, one day at a time.
- Margin by SKU — By SKU's first version: one Sunday to Saturday week, with the old column names.
- Margins for a week, a month or a quarter — By SKU by period, and Cost and margin in the Weekly and Monthly.
- Analytics numbers you can trust — the Dashboard covers exactly the days you pick, and five more fixes.
- Costing “No access” — hide quotes, margins and customer rates from one person below Admin.
- Line run and pre/post-build — why the planner and Material Master show different hours for one order.