Beacon how-to · November 2026

History, Synopsis and Analytics

How to look back at a day that is finished, read the numbers, print them, see the month and the year, and use the Analytics page to answer “how many can we build?” and “what is the price?”. Six short how-tos, each with an example you can check by hand.

  • v2.175.0

Screenshots are from Beacon's test site. The orders (DEMO-1001 to DEMO-1005), products and all dollar amounts are demo data, not real production data. Pictures use Thursday, November 5, 2026.

1. How to look up a past day in History

Who: Everyone who signs in to Beacon, Viewers included. When: you want to see how a day finished, or answer a question about last week.

History has two doors. The order cards list the orders built in a date range. The Synopsis menu gives you the whole day in one report. For one day, use the Synopsis.

Before you startThe day's Shift Review must be submitted. A day that is not submitted shows zeros. See “An empty day” below.

Steps: open a whole day

  1. At the top of the page, click Analytics. Then click the History tab.
  2. Click Synopsis. A small menu opens.
  3. Click Daily Synopsis. A window opens on today's date.
  4. Click the date under Select Date and pick the day you want. Type it or use the calendar.
  5. Wait a moment. The tiles and tables fill in for that day.
  6. Click Close (bottom) or the × (top right) when you are done.
The History page. The Synopsis menu is open with four choices: Daily Synopsis, Weekly Synopsis, Monthly Synopsis and Year to Date. Behind it are the date range, the quick filters and the tiles for builds, units, hours, CPLH, cost and workers.
Fig. 1The Synopsis menu on History. Daily, Weekly, Monthly and Year to Date are all here.

Steps: find the orders built in a range

  1. On History, set the two dates next to Range.
  2. Click Apply. Or click Last Week or Last 30 Days to fill the dates for you.
  3. Read the tiles at the top: builds, units, hours, CPLH, cost and workers for the range.
  4. Scroll down to the order cards. Click Details on a card to open that order.
ExampleYour coordinator asks, “How did Thursday go?” You open Synopsis → Daily Synopsis and pick 11/05/2026. The top of the report reads 34 headcount, 229.4 hours, 331 units and 13 pallets built. That is your answer in about 10 seconds. Next: how to read each part.
An empty dayIf every tile reads 0 and there are no Work Orders or Materials, the day is probably not submitted yet. This includes today until the shift is closed out. Open Shift Review, submit the day, then open the Daily Synopsis again. Beacon now says so at the top of the report: Not submitted, or Nothing posted on a day with no hours. Send Email stays off until the day is posted. See Daily Synopsis: Not submitted.
Orders that ran on more than one dayFixed in v2.180.0. An order card now shows only the work done inside your dates. Its date is the days it worked in that range. Units read like “77 of 154” when the range holds only part of the order, and CPLH uses only those units and hours. See History: orders that ran more than one day.
SKU first, and cost per unitNew in v2.199.0. Each card leads with the SKU, with the PO in small text, and shows Cost / Unit next to Est. Cost. See History: SKU first, and cost per unit.

If something goes wrong

  • All zeros. The day is not submitted. Submit its Shift Review first (Fix a shift).
  • An order is missing from the cards. History lists an order only if it has posted hours in your dates. Check that the Shift Reviews for the days it ran are submitted, then click Apply again.
  • The window opens on the wrong day. It always opens on today. Change Select Date.

2. How to read the Daily Synopsis

Who: Everyone who signs in to Beacon, Viewers included. Only Admins and above see Cost and margin. When: after a shift is submitted, to check the day or to explain it to someone.

The report runs top to bottom: the big tile, the small tiles, then Shift Review, Work Orders, Cost and margin (Admins and above), Materials, Labor and Line Performance. Every number ties back to the one above it.

The tiles

Daily Synopsis for 11/05/2026. Overall Productivity 0.0%, target 100%. Tiles: Total Headcount 34, Total Hours 229.4, Total VAS Units 331, Production Units 331, Non-Production Units 0, Units per assembly hour 1.7, Changeovers 2, Changeover time 49 min with the note plan 30 min, not measured. Print, Export PDF and Send Email buttons are at the top right.
Fig. 2Thursday, Nov 5. The big tile is Overall Productivity. The small tiles are the day in numbers.
TileWhat it means
Overall ProductivityHow the day's SKUs did against their time standards, weighted by hours. Target is 100%. It shows a red 0.0% when the SKUs have no standard (see the known issue below).
Total HeadcountSince v2.179.0, on a day whose Shift Review was submitted, the Shift Review's head count (its Shift Headcount tile). On other days, the people who logged hours, counted once each, or the crew typed on the hours if that is higher. Here 34.
Total HoursAll hours worked that day, leads and non-leads together. Here 229.4.
Total VAS UnitsEverything built: Production plus Non-Production. Here 331 + 0.
Production Units / Non-Production UnitsUnits on real production orders, and units on other work such as rework.
Units per assembly hourUnits ÷ assembler hours only. Here 331 ÷ 195.4 = 1.7. This is the number most people call CPLH.
Changeovers / Changeover timeHow many changeovers, and the minutes lost between runs. “plan 30 min · not measured” is the plan; the time shown is the real gap between runs. Set-up inside the next run is not counted.
Known issue: Overall Productivity shows 0.0%When an order's SKU has no time standard, the Materials table shows N/A for it, and the big tile shows a red 0.0% instead of N/A. It does not mean the day was bad. Look at Attainment and Efficiency in Shift Review instead. A fix is coming.

The sections

Shift Review

One row per line (1A, 1B, 4A…), with its orders indented under it. Lines that did not run say Never Started.

Shift Review table. Line 1A, FLEX, Closed, 151 actual units against 170 planned, 89 percent attainment, 72.52 actual labor hours against 69.00 planned, 85 percent efficiency. Under it orders DEMO-1001 56 units, DEMO-1002 46, DEMO-1003 49. Line 1B 100 of 200, 50 percent. Line 4A 80 of 80, 100 percent.
Fig. 3Line 1A ran three orders: 56 + 46 + 49 = 151 units, against a plan of 170.
  • Actual Units / Planned Units / % Attainment: what was built, what was planned, and built ÷ planned. Line 1A: 151 ÷ 170 = 89%.
  • Actual HC / Planned HC: people on the order. A line row shows a dash because a line runs several orders; the headcount is on each order.
  • Actual / Planned Labor Hours: hours used against hours planned.
  • Efficiency: how the run did against its time standard. Higher is better. Colours go green, amber, red.
  • Actual / Planned Run Time, Downtime: time running, time planned, and the reasons for stops with minutes.
  • Pallets: pallets built on that line or order.
  • Break/Lunch: whether breaks and lunch were logged, and whether lunch was paid.
  • Changeover: minutes between runs on the line (4 + 45 = 49 on line 1A).

Work Orders Summary

Work Orders Summary. The picture was taken before Cost and margin moved to its own table, so the old money columns still show. DEMO-1004 100 units, 70.0 hours, 10 people. DEMO-1001 56 units, 25.3 hours. DEMO-1002 46 units, 21.7 hours. DEMO-1003 49 units, 28.4 hours. DEMO-1005 80 units, 84.0 hours.
Fig. 4One row per order: units, total hours, headcount, labor split and lines. Taken before Cost and margin moved to its own table, so the old money columns still show.
  • Units, Total Hours, Headcount: for each order. The hours add up to the day's Total Hours: 70.0 + 25.3 + 21.7 + 28.4 + 84.0 = 229.4.
  • Labor Breakdown: Indirect (leads) and Fixed (non-leads) with people and hours.
  • Lines: the lines the order ran on.

Money is not in this table any more. Admins and above see it in its own section, Cost and margin: Planned, Actual and Customer Billing cost for each order, and two margins. Only a site that bills per unit has it. See Daily Synopsis: cost and margin.

Materials Breakdown

Materials Breakdown. DEMO-1004 100 units, 6 pallets, 56.0 hours. DEMO-1001 56 units, 2 pallets, 21.1 hours. DEMO-1002 46 units, 1 pallet, 18.1 hours. DEMO-1003 49 units, 2 pallets, 23.2 hours. DEMO-1005 80 units, 2 pallets, 77.0 hours. Productivity N/A on every row. Pallets built 13. Below it the Labor section starts.
Fig. 5Units, pallets and hours for each order. N/A means no time standard for that SKU.

Pallets add up: 6 + 2 + 1 + 2 + 2 = 13. The Hours here are assembler hours only, so they add up to 56.0 + 21.1 + 18.1 + 23.2 + 77.0 = 195.4. That is the number under “Units per assembly hour”.

Labor, and Line Performance

Labor section. Indirect 3 people, 20.5 hours, Ryder leads. Fixed 31 people, 208.9 hours, Ryder non-leads. Temp 0 people. By role: Line Captain 3 people 20.5 hours; Material Handler 2 people 13.5 hours; Assembler 29 people 195.4 hours, 195.4 assembly hours. Line Performance (Assemblers Only): line Unknown, 1 assembler, 195.4 hours, 331 units built, CPLH 1.7.
Fig. 6Labor by type and by role, then Line Performance for assemblers only. Taken before the fix, so the line reads Unknown.
  • Indirect / Fixed / Temp: leads, non-leads and temp workers, each with people and hours.
  • By role: headcount, hours, and the Assembly column. Only assembler hours count as assembly hours.
  • Line Performance (Assemblers Only): assembler hours, units built and CPLH by line.
Line names in Line PerformanceFixed in v2.179.0. Shift Review now saves the line on every hour it posts, so each line gets its own row. A day posted before the fix, or hours saved with no line, can still show Unknown. See Line Performance shows your lines.

Check the math

Example: Thursday, Nov 5

Headcount. 3 Line Captains + 2 Material Handlers + 29 Assemblers = 34 people.

Hours. Leads 20.5 + non-leads 208.9 = 229.4. By role: 20.5 + 13.5 + 195.4 = 229.4.

Units. 56 + 46 + 49 + 100 + 80 = 331.

Units per assembly hour. 331 units ÷ 195.4 assembler hours = 1.694, shown as 1.7.

Why not units ÷ Total Hours?Total Hours includes the leads and the material handlers (229.4 h). They do not build. If you divide by all hours you get 331 ÷ 229.4 = 1.4, which makes the line look slower than the assemblers really were. The Daily Synopsis uses assembler hours only: 1.7. Since v2.180.0 the Monthly uses the same hours for each day, so it shows 1.7 for this day too.

If something goes wrong

  • Hours do not match Shift Review to the hundredth. Shift Review hours are the lines' labor hours. The synopsis hours are everyone who logged time. Small gaps are normal.
  • A line says Never Started. No run was started on that line that day. This is normal for spare lines.
  • Everything is zero. The day is not submitted. See the first how-to.

Who: Everyone who signs in to Beacon, Viewers included. When: you need a paper copy, or a file to attach to a report.

Before you startOn the Daily, Beacon builds the printout in a new window. Your browser must allow pop-ups from the Beacon site, or nothing will open. On the Monthly and Year to Date, Print gives a blank page today. Use Export → Export to PDF there instead. A fix is coming.
  1. Open the report: Daily, Monthly or Year to Date (History → Synopsis).
  2. Pick the day, month or year. Wait until the numbers are on screen. On the Daily, Print is greyed out while it loads.
  3. Daily: click Print. Export PDF does the same thing. Monthly and Year to Date: click Export → Export to PDF. Your browser downloads a PDF file. Open it to print or keep it. Do not use Print there: it gives a blank page. The Monthly PDF has no Billed, Actual Cost or Margin columns.
  4. On the Daily, a new window opens with the report. The print box opens with it.
  5. For paper, pick your printer and click Print.
  6. For a file, change the printer to Save as PDF. Click Save and choose a folder.
ExampleYou want Thursday's report in the shift folder. Open the Daily Synopsis for 11/05/2026, click Print, choose Save as PDF and name the file “Daily Synopsis 2026-11-05”. The PDF has the same tiles and tables as the screen: 34 headcount, 229.4 hours, 331 units.
Send Email (Daily, Lead and above)The Send Email button sends the same report to the people in Settings → Email Settings. If nobody is listed, Beacon says “No email recipients configured” and sends nothing. Submit the day first, or the email will carry zeros.

If something goes wrong

  • Nothing happens when I click Print. Your browser blocked the pop-up. Allow pop-ups for the Beacon site, then click Print again.
  • The page has no Save as PDF choice. Pick “Microsoft Print to PDF” or “Save to PDF” in the printer list instead.
  • The PDF is full of zeros. The day was not submitted when you printed. Submit it, reopen the report and print again.
  • The Monthly or Year to Date prints a blank page. Use Export → Export to PDF instead. A fix is coming.

4. How to use the Monthly and Yearly Synopsis

Who: Everyone who signs in to Beacon, Viewers included. When: month-end review, or when you are asked about the quarter or the year.

Looking for the week? It has its own page: Weekly Synopsis.

Steps: the Monthly Synopsis

  1. On History, click Synopsis → Monthly Synopsis.
  2. It opens on this month. To change it, click Select Month and pick another month.
  3. Read Overview first: working days, average headcount per day, total hours, total units and average CPLH.
  4. Scroll for Labor Breakdown, Labor Costs, Production and the Work Orders Summary. On a site that bills per unit, the Work Orders Summary also shows Billed, Actual Cost and Margin, with totals under it.
  5. At the bottom, Daily Breakdown lists every working day with workers, hours, units and CPLH. For a day's headcount by role, open that day's Daily Synopsis. The live site's Monthly has no arrow on the day rows.
Monthly Billed is not the customer rateBilled here uses the price Beacon locked in when the order first posted, not the customer rate. Actual Cost is posted hours × role rates, with no LTO/QA. So the Monthly margin will not match the Daily's Cost and margin or Billing → By SKU. Coming: these three columns will be replaced by a new cost and margin table.
Monthly Synopsis for November 2026. Overview tiles: 3 working days, 18.0 average headcount per day, 235.1 total hours, 715 total units, 3.6 average CPLH. The Labor Breakdown section starts below, with indirect, fixed and temp hours.
Fig. 7The Monthly Overview: five tiles for the month.
Daily Breakdown, taken before v2.180.0. 11/05/2026: 34 workers, 229.4 hours, 331 units, CPLH 1.4 (it now reads 1.7). 11/06/2026: 19 workers, 3.2 hours, 240 units, CPLH 74.5. 11/07/2026: 1 worker, 2.5 hours, 144 units, CPLH 57.6. Totals: 18.0 average workers, 235.1 hours, 715 units, CPLH 3.6.
Fig. 8Daily Breakdown with a Totals row. Totals add up; workers are averaged. Taken before v2.180.0: 11/05 now reads CPLH 1.7, not 1.4.
Example: check the Overview by handHours: 229.4 + 3.2 + 2.5 = 235.1. Units: 331 + 240 + 144 = 715. Headcount is never added: it is the average per day, (34 + 19 + 1) ÷ 3 = 18.0.
Monthly CPLH matches the DailyFixed in v2.180.0. Each day row in the Monthly now shows that day's Daily CPLH, so Thursday reads 1.7 in both (331 ÷ 195.4). The month, the quarters and the year add up their days' units and assembly hours, then divide. See Monthly and Year to Date CPLH.

Steps: the Year to Date Synopsis

  1. On History, click Synopsis → Year to Date.
  2. It opens on this year. To change the year, use Select Year.
  3. Use the four tabs: Overview, Monthly Breakdown, Quarterly and Top Materials.
Year to Date Synopsis for 2026. Four tabs: Overview, Monthly Breakdown, Quarterly, Top Materials. Overview tiles: 10 working days, 11.2 average headcount, 640.1 total hours, 9,115 total units, 14.2 average CPLH. The Labor Breakdown starts below.
Fig. 9Year to Date, Overview tab. The test site has only a few working days, so the totals are small.
  • Overview: the year's totals, labor by role, labor costs, and the work orders.
  • Monthly Breakdown: one row per month.
  • Quarterly: the same, grouped into quarters.
  • Top Materials: the SKUs that made the most units.
Yearly headcountFixed in v2.180.0. Average headcount in the Yearly is now the average of the days worked, so a short month no longer counts as much as a full one.

If something goes wrong

  • A month shows nothing. No day in it was submitted. Submit the days, then reopen the month.
  • The Monthly does not equal four Weeklies. The Monthly uses its own older calculation. Weekly always matches the Daily.
  • The report takes a few seconds to open. The year reads every day. Wait for the tiles.

5. How to use Analytics

Who: Everyone can use Build. Costing is for Leads and above. When: before you commit to an order, or when someone asks “can we do it, and what will it cost?”.

Analytics works on one material at a time. You pick the material and the order size once at the top, then switch between the tabs. This page covers Build and Costing.

  1. At the top, click Analytics, then the Analytics tab next to History.
  2. Leave Source on Material.
  3. Click the Material box and pick the SKU. You can type to search.
  4. Type the order size in Target Qty (Units).
  5. Click the tab you need: Build or Costing.
Nothing here changes your dataBuild and Costing only calculate. The what-if edits you type are for this quote only. The material itself is not changed.

Build: “How many can we build?”

Build looks at the contents list of the SKU (the candy or parts it needs) and the stock you type in. It tells you the most units you can make, and which item runs out first. The list is labelled Candy or Contents, depending on your site.

  1. Pick the Material and the Target Qty. Click the Build tab.
  2. For each item in the list, check Pcs Needed (pieces per unit) and Pcs/Case. They fill in on their own.
  3. Type how many cases you have in Cases Available. Do this for every item.
  4. Click Calculate Maximum Units.
  5. Read the big number: Maximum Units You Can Build. Under it, Limited by names the item that runs out first, and a green or red line compares it with your Target Qty.
Build tab. Demo product 16, target quantity 500. One item, DEMO-CANDY-1, needs 13.2 pieces, 6000 pieces per case, 2 cases available, total 12,000 pieces. Result: Maximum Units You Can Build 909. Limited by DEMO-CANDY-1. Ordered qty 500, Buildable in full.
Fig. 102 cases of 6000 pieces make 909 units. The order is 500, so it is buildable in full.
ExampleOrder: 500 units of Demo product 16. The item needs 13.2 pieces per unit. A case holds 6,000 pieces. You have 2 cases.

2 × 6,000 = 12,000 pieces. 12,000 ÷ 13.2 = 909.09, rounded down to 909 units. 909 is more than 500, so Beacon says Buildable in full.

If you had only 1 case: 6,000 ÷ 13.2 = 454.5, so 454 units. Beacon would say Short by 46 units (500 − 454).

With several items, the answer is the smallest number. One item with too little stock stops the whole build.

If something goes wrong

  • The list is empty (“No candy”). The material has no contents set up. Ask whoever keeps Material Master to add them.
  • Pcs/Case is 0. The item has no pieces-per-case saved. Type it in yourself, or the answer will be 0.
  • The answer is 0. You left Cases Available at 0 for at least one item. Fill in every item.

Costing: “What is the price?”

Costing prices the order from the material's steps and the labor rates: how long the work takes, times what each role costs, plus an optional markup.

  1. Pick the Material and the Target Qty. Click the Costing tab.
  2. Under Movement Profile you can edit the steps for this quote only. Leave them alone for a normal price.
  3. If you add a profit margin, type it in Markup %. Leave it at 0 for cost only.
  4. Click Calculate.
  5. Read Total estimated cost at the top right, then the tiles and the Cost Breakdown.
Costing tab. Demo product 52, target quantity 500. Total estimated cost $53,193.86, time-based. Tiles: Pallets 4, Cost per unit $106.39, Cost per pallet $13,298.47, Headcount 13 over 173.8 hours. Cost Breakdown: Assembler $52,704.38, Material Handler $254.48, Line Captain $180.00, QA / Gate Keeper $55.00.
Fig. 11Costing for 500 units. The role lines add up to the total at the top. Pay rates blurred.
Example: check the price by handOrder: 500 units, markup 0.

Roles: 52,704.38 + 254.48 + 180.00 + 55.00 = $53,193.86. That is the total.

Per unit: 53,193.86 ÷ 500 = $106.39. Per pallet: 53,193.86 ÷ 4 pallets = $13,298.47.

With a 30% markup Beacon adds 30% on top of the subtotal: 53,193.86 × 0.30 = $15,958.16, so the price is 53,193.86 + 15,958.16 = $69,152.02, or $138.30 a unit for 500 units.

The dollar amounts on this page are demo values from the test site, so they are larger than a real quote.

If something goes wrong

  • The cost is $0.00 or the tiles are empty. You have not pressed Calculate since you changed the material or quantity. Press it again.
  • “Failed to load materials and rates”. Reload the page once. If it stays, tell your Admin.
  • The price looks far too high. A step on the SKU may have a wrong count saved. Open the Build Step Detail list under the breakdown and look for a step with a huge count. Ask your standards owner to fix it.
The other tabsThe Labor, Plan vs Actual and Billing tabs are covered in Analytics: what you can see and compare. For plan vs actual by week, see the Weekly Synopsis.

6. How to read the audit log

Who: Admins and above. When: you need to know who did something in Presence, and when.

What it coversThe Audit Log records Presence events only (the sign-in side of the floor system). It does not record changes to orders, hours or settings. It shows up in the Admin menu only for sites where Presence is turned on. If you do not see it, your site does not use Presence, and there is nothing to read.
  1. At the top, click Admin, then Audit Log.
  2. Next to Event, pick one kind of event, or leave it on All Events.
  3. Next to Last, type how many days back to look. The default is 7. The most is 90.
  4. Read the table, newest first: Timestamp, Event, Actor (the person's role and the start of their ID) and Target (what it was done to).
  5. Click a row to open its details. Click it again to close it.
  6. Click Refresh to load the newest entries.
ExampleSomeone asks who changed a Presence setting last month. Leave Event on All Events, set Last to 30, and scan the Event column for the one you want. Read the Timestamp, the Actor's role and the Target, then click the row to see the details saved with it.

If something goes wrong

  • “No audit events found for the selected filters”. Nothing happened in that time, or Presence is off. Try All Events and a larger number of days.
  • The page will not open. You need the Admin role or higher.
  • The Actor shows letters and numbers. That is the first part of the person's ID, kept short on purpose. The role next to it tells you who they were.