Beacon how-to · November 2026

Daily Synopsis: your lines, and the same headcount as Shift Review

On a Checkpoint day, the Daily Synopsis's Line Performance table showed one row called Unknown instead of your lines, and its headcount did not match Shift Review. Now every line shows its own row, and the headcount is the one Shift Review shows.

  • Next release

1. What's fixed

  • Line Performance names the lines. Each line gets its own row with its hours, units and CPLH. See it
  • Headcount matches Shift Review. On a submitted day, the synopsis shows the Shift Review's headcount instead of adding every PO's crew. See it

Screenshots are from Beacon's dev site. The lines and all numbers are demo data, not real production.

2. Line Performance shows your lines

When Shift Review posted a day, it saved the hours without saying which line worked them. The synopsis then put every hour under Unknown (Fig. 1).

Line Performance (Assemblers Only) before the fix: one row, Line Unknown, Assemblers 1, Hours 195.4, Units Built 331, CPLH 1.7, Build Leads None.
Fig. 1 Before: one demo day, every hour under Unknown.

Now each posted hour carries the name of the line it was worked on. The same demo day, posted again, shows three lines (Fig. 2). The hours add up to the same 195.4.

Line Performance (Assemblers Only) after the fix: three rows. 1B: 1, 56.0 hours, 100 units, CPLH 1.8. 1A: 1, 62.4 hours, 151 units, CPLH 2.4. 4A: 1, 77.0 hours, 80 units, CPLH 1.0. Build Leads None.
Fig. 2 After: 1B 56.0 + 1A 62.4 + 4A 77.0 = 195.4 hours, same total.
  • Nothing to do on the floor. Close lines and submit Shift Review as usual. The automatic close-out does the same.
  • A PO that ran on two lines is split by line, each line with the hours it worked. The PO's total does not change.
  • Hours, units, cost and the bill do not change. Only the line name is added.
  • Days posted before this update still say Unknown until they are fixed in the data. Ferrara's Checkpoint days 10/29–11/05 are on the list to fix.
Still to come

The Assemblers column still reads 1 per line on a Checkpoint day. It counts names, and Checkpoint posts one name per role, not per person. That is a separate fix.

3. Headcount matches Shift Review

The Daily Synopsis used to add up every line's crew on every PO. A line that ran three POs with the same 10 people counted 30. So the synopsis read much higher than Shift Review (Ferrara 11/05: 92 against 52).

Now, once a day's Shift Review is submitted, the synopsis shows the same headcount as Shift Review: the Shift Headcount box (Fig. 3) becomes the synopsis's Total Headcount (Fig. 4).

Shift Review, Shift headcount by role: Line Captain 3, Material Handler 2, Assembler 29, QA / Gate Keeper 2. Shift total 36. Tiles below: Total line hours 21.00, Shift headcount 36 by role, Shift hours 8, Floaters 0, Day attainment 150.5%.
Fig. 3 Shift Review on a demo day: 36 people by role.
Daily Synopsis tiles: Total Headcount 36, Total Hours 229.4, Total VAS Units 331, Production Units 331, Non-Production Units 0.
Fig. 4 The same day's Daily Synopsis: Total Headcount 36.

The By role table and the Indirect / Fixed / Temp counts use the same numbers (Fig. 5). Hours do not change: they are still what was posted.

Daily Synopsis Labor: Indirect 3 people 20.5 hours, Fixed 33 people 208.9 hours, Temp 0. By role: Line Captain 3 people 20.5 hours; Material Handler 2, 13.5; Assembler 29, 195.4; QA / Gate Keeper 2, 0.0.
Fig. 5 By role: the Shift Review's people, the posted hours.

Weekly and Monthly

The Weekly Synopsis shows each day's number from the Daily, so it changes the same way. The Monthly Synopsis's Workers column now shows the same number for each day (Fig. 6), and Avg Headcount/Day is the average of those days. Line Captains are no longer left out of the Monthly.

Monthly Synopsis Daily Breakdown: 11/03 35 workers, 11/04 6, 11/05 36, 11/06 6. Totals 20.8 average.
Fig. 6 Monthly: 11/05 reads 36, the same as the Daily and Shift Review.

When the synopsis keeps the old count

  • No Shift Review, or not submitted yet: the count from the posted hours, as before.
  • A Shift Review with every box at 0: the posted count, so the day never reads 0.
  • Sites without Checkpoint (Buckner): no change.
The LTO box

An LTO count counts only if someone typed it in Shift Review. On older days, from before the LTO box started blank, the synopsis shows what that day's Shift Review shows.

Numbers drop after this update

Ferrara's Checkpoint days read lower, because people are no longer counted once per PO. 11/05 goes from 92 to 52 in the Daily and from 87 to 52 in the Monthly. Nothing stored changes; the synopsis just reads the Shift Review.

4. Questions

Shift Review says 52 but the Work Orders Summary adds up to more. Why?

Each PO row shows the crew that worked that PO. The same people often work several POs, so those rows add up to more than the people on the floor. The day total is the Shift Review count.

Does this change Line Performance in the Weekly or Monthly Synopsis?

Yes, the same way. The Weekly adds each day's lines. The Monthly reads the same posted hours, so new days show your lines there too.

A line was renamed. Which name shows?

The name the line had when the day was posted. Renaming a line later does not change past days.

Days entered by hand in the Hour Tracker?

No change. They show whatever was typed in the order row's Line box, as before.