Beacon how-to · November 2026

The end-of-shift report: Downtime, Lunch and Break, and changeover minutes

The end-of-shift report (the Daily Synopsis, on screen and in the email) is shorter and says each thing once. Downtime lists the time the line was stopped: real stoppages, and any Break that was logged. Lunch has its own plain line. The changeover minutes are the ones Beacon actually charges to the PO: the same minutes that go into the hours, the rate and Plan vs Actual.

  • v2.186.0

1. What's new

  • Four sections are off for Ferrara: Production Units, Work Orders Summary, Materials Breakdown and Line Performance. The Shift Review table already shows what they showed. Which ones and why
  • Lunch is out of Downtime. A Break that was logged is in it. The two scheduled breaks are already out of the shift's hours, so crews do not log them. Any Break that is logged was extra, so it counts as downtime. Example
  • Lunch reads plainly: “Lunch 30 min”, in its own column called Lunch. There is no Break line and no Add break button any more. All the wordings
  • A logged Break now counts against efficiency. Only Lunch comes off a line's labor hours. How much it moves
  • The Changeover column shows the minutes Beacon charges, not the time that passed between two POs. How they are worked out
  • Pay, posted hours and rates do not change. What changes is what the report and Shift Review show: Downtime, Actual Labor Hours and Efficiency. Questions

Fig. 2 to 5 are from Beacon's dev site: demo line 4A, demo POs (DEMO-…), a made-up day. Fig. 6 and 7 are Ferrara's real November 9 report drawn for v2.186.0, with PO numbers replaced by DEMO-… and item numbers hidden. They were drawn before a Break counted as downtime, so their Break/Lunch column reads differently from the live report. The Settings picture is also from the dev site.

2. Four sections are off at Ferrara

Ferrara asked for a shorter report. These four no longer show on the History screen, in Print or in the email:

SectionWhy it can go
Production Units (top tile)At Ferrara every unit is production, so it showed the same number as Total VAS Units, twice.
Work Orders SummaryEach PO's units, hours and plan are in the Shift Review table, one row per PO.
Materials BreakdownThe same POs grouped by item. The Shift Review table already shows each one.
Line PerformanceEach line's units, hours and run time are the line rows of the Shift Review table.

The day's numbers do not change. Beacon still works every section out; it just leaves these off the report. Other sites keep every section until their Admin turns one off (Fig. 1).

Settings, Email tab: Daily Synopsis — what to show. Headline boxes: Overall Productivity, Total Headcount, Total Hours, Total VAS Units, Production Units, Non-Production Units, Units per assembly hour, Changeovers, Changeover time. Section boxes: Work Orders Summary, Cost and margin (totals and per-PO table), Stage work, Materials Breakdown, Labor categories, Labor by role, Line Performance, Quality Control Summary, Shift Review table. Every box ticked. A Save Daily Synopsis button.
Fig. 1 Settings → Email → Daily Synopsis — what to show, with every box ticked (picture from November 6). At Ferrara, Production Units, Work Orders Summary, Materials Breakdown and Line Performance are now unticked.

To turn a section back on (Admins)

  1. Open Settings → Email and find Daily Synopsis — what to show.
  2. Tick the section you want back. Untick one to hide it.
  3. Click Save Daily Synopsis. The next report, on screen and in the email, follows the list. Reports already emailed do not change.

Only Admins can change the list. It is one list for the whole site: everyone who opens or receives the report sees the same sections.

3. Downtime: stoppages, and any Break that was logged

The Downtime column is for time the line was not running that needs a look: Mechanical, Material, Other, and a Break that was logged. Lunch is the one thing left out, because it has its own column (section 4).

Why a Break counts. The two scheduled breaks are already taken out of the shift's working hours (Ferrara plans 7.5 working hours out of 8 paid), so crews do not log them. A Break that does get logged was extra time the line stood still, so it is downtime like any other stop.

Example (demo line 4A)

Demo line 4A, crew of 11, logged a 30-minute Lunch, two 15-minute Breaks and a 10-minute conveyor jam. Before, Downtime read 10m (only the jam), Actual Labor Hours 37.59 and Efficiency 110%. Now, Downtime reads 40m (the jam, 10, plus the two Breaks, 30), Actual Labor Hours 43.08 and Efficiency 96% (Fig. 2 and 3).

The 5.5 hours between 37.59 and 43.08 is the two Breaks: 11 people × 30 minutes = 5.5 labor hours. They used to come off the line's hours. They stay on now.

The line strip above the Shift Review table, demo day November 8. Before: 4A reads 'Lunch 30 min', 'Breaks 30 min' and 'Downtime: Mechanical 10 — conveyor jam'; 4B reads 'Lunch — not logged', 'Breaks — not logged' with Add lunch and Add break buttons. Now: 4A reads 'Lunch 30 min' and 'Downtime: Break 15 — 15 Minute Break · Mechanical 10 — conveyor jam · Break 15'; 4B reads 'Lunch — not logged' with an Add lunch button only.
Fig. 2 The strip above the Shift Review table (demo day). The Breaks cell is gone, the two Breaks are listed in the Downtime line, and 4B has an Add lunch button but no Add break.
The Shift Review table for demo line 4A, three demo POs. Before: line 4A Downtime 10m, Actual Labor Hours 37.59, Efficiency 110%; PO DEMO-8425 13.20 hours, 195%, Downtime 0; DEMO-8462 8.75, 29%, 0; DEMO-8456 15.64, 9%, 10m. Now: line 4A Downtime 40m, 43.08 hours, 96%; DEMO-8425 15.13, 170%, Downtime 15m; DEMO-8462 10.03, 26%, 0; DEMO-8456 17.92, 8%, 25m.
Fig. 3 The same demo line before and now (other columns hidden to fit). Each PO that held a Break shows it in Downtime, and its labor hours and efficiency count it. The line's hours are the PO hours added up: 15.13 + 10.03 + 17.92 = 43.08.

What counts where

Logged asDowntime columnActual Labor Hours and EfficiencyPay at Ferrara
LunchLeft out (own column)Comes off, up to 30 minutes a dayUnpaid, up to 30 minutes a day, as before
BreakIn, with its noteCounts (stays on the clock)Paid, as before
Mechanical, Material, OtherInCountsPaid

Unchanged. Pay and posted hours do not move. Actual Run Time still takes both Lunch and Break off (a line at lunch or on a break was not running). Changeover minutes and rates are unchanged. At a site that marks Break as unpaid in Settings (none today), a logged Break still comes off pay and now counts against efficiency as well.

Where else it shows. History, Print and the email use the same rule (Fig. 4 and 5). Past days read with the new rule too, so a past day with a Break logged now shows more Downtime and a lower efficiency. What was posted does not change.

History, Daily Synopsis for the demo day, Shift Review section (some columns hidden). Line 4A: Actual Labor Hours 43.08, Efficiency 96%, Downtime 40m with notes Break 15 — 15 Minute Break, Mechanical 10 — conveyor jam, Break 15; Lunch 30 min. PO DEMO-8425: 15.13, 170%, Downtime 15m, Break 15 — 15 Minute Break. DEMO-8456: 17.92, 8%, Downtime 25m. Line 4B: Lunch — not logged. The note under the table says Downtime leaves out Lunch (it has its own column); a logged Break counts as downtime.
Fig. 4 History → Daily Synopsis, the same demo day. The column is called Lunch, and the note under the table says what Downtime counts.
The Shift Review table as it goes in the synopsis email, demo day November 8. Columns include Downtime, Pallets, Lunch and Changeover. Line 4A: Downtime 40m with its Break and Mechanical notes, Lunch 30 min. Line 4B: Lunch — not logged. The note under the table says Downtime leaves out Lunch; a logged Break counts as downtime.
Fig. 5 The email table for the same demo day, drawn by the email's own code.

Changeover downtime logged before November 10 still shows in Downtime. That was the old way to log a changeover. Since v2.185.0 the CHANGEOVER button is the only way, so set-up time no longer lands in Downtime.

4. Lunch in one plain line

Each line shows its Lunch once, in the report's Lunch column (it used to be called Break/Lunch; Fig. 4 and 5). The strip above the Shift Review table on screen uses the same words. A Break has no line here: if one was logged, it is in Downtime (section 3).

What was loggedWhat it says
A 30-minute LunchLunch 30 min
A 45-minute Lunch, at a site where Lunch is unpaidLunch 45 min (30 unpaid). Only 30 minutes a day come off pay.
No Lunch loggedLunch — not logged (amber on Shift Review, because it changes pay)
A Break loggedNothing in the Lunch column. It shows in Downtime: “Break 15 — 15 Minute Break”.

On a closed line with no Lunch, Shift Review shows an Add lunch button. There is no Add break button any more (Fig. 2).

Log it as Lunch, not Other

Beacon only takes Lunch off pay when the stop was logged with the Lunch reason. A lunch logged as Other stays paid, and it shows in Downtime as a stoppage.

Do not log the two scheduled breaks

They are already out of the shift's hours. A Break you log counts as downtime and lowers the line's efficiency, so log one only when a break really took the line down on top of the scheduled ones.

5. Changeover minutes in the report

The report's Changeover column now shows the minutes Beacon charges as changeover. A PO row shows the changeover into that PO; the line row adds them up. The Changeover time tile at the top adds up every line.

Before, the column showed the time that passed between one PO's last minute and the next PO's Start. That is not what Beacon charged, so the report and the hours could disagree by a lot.

How the charged minutes are worked out

  1. The lead taps CHANGEOVER. The old PO stops and the line is in set-up.
  2. The changeover ends at the new PO's first pallet, less the standard time to build that pallet. Tapping Start early or late does not change it (more).
  3. Downtime logged during the set-up comes off.
  4. A PO smaller than one pallet that never tapped a pallet is measured to when it ended, if the line then moved to another PO.
  5. A coordinator can type the real minutes in Shift Review (Fix a missed changeover). The typed figure replaces the measured one, in the report too.
Line 4A, November 9, in the old report and the new one. Before: Downtime 1h 30m with Changeover 45, Break 15 and Lunch 30 under it; Changeover 75 min; PO rows DEMO-01 0, DEMO-02 3 min, DEMO-03 36 min, DEMO-04 36 min. Now: Downtime 45m, Changeover 45 under it; Break/Lunch Lunch 30 min, Break 15 min; Changeover 2 min; PO rows 0, 0, 0 and 2 min.
Fig. 6 Line 4A, November 9. The old Changeover column added the time between POs (3 + 36 + 36 = 75). The new one shows what Beacon charged: 2 minutes. The 45 minutes left in Downtime are set-up logged as Changeover downtime, the old way. Drawn for v2.186.0, when the column was called Break/Lunch and listed the Break; a logged Break is in Downtime now.
“75 and 36 minutes” on line 4A, November 9

4A ran four POs that day: the four the plan had, in the same order. The old column added the gaps between them: 3 + 36 + 36 = 75 minutes. Beacon charged about 2 minutes. Two things cancelled the rest:

  • The set-up was also logged as Changeover downtime. Downtime during a set-up comes off the changeover, so those minutes counted as downtime, not changeover. Since v2.185.0 Changeover is not a downtime reason, so this stops.
  • On the first switch the lead tapped Start straight away and the PO never tapped a pallet, so Beacon measured 3 minutes.

The new column would have shown about 2 minutes, the same figure as the hours. A coordinator can correct a switch like this in Shift Review before submitting.

Shift Review's strip still says “min between POs”. The strip above the Shift Review table counts the time between POs, as before, and says so. The report shows the charged minutes. When the two differ, the difference is set-up time that Beacon counted as downtime or as run time.

Days before November 6, 2026 have no measured changeovers. Their reports keep the time-between-POs figure.

6. Reading a line, start to finish

Fig. 7 is the whole Shift Review table from the November 9 report, drawn with the v2.186.0 rules (before a logged Break counted as downtime). Read a line from left to right, then check its POs underneath.

The Shift Review table from the November 9 report with the new rules. 4A: 311 units, Downtime 45m (Changeover 45), Lunch 30 min, Break 15 min, Changeover 2 min. 4B: 339 units, Downtime 23m (Changeover 23), Lunch 30 min, Break 18 min, Changeover 0. 6B: 750 units, Downtime 0, Lunch 30 min, Break 15 min, Changeover 100 min. 1A: 528 units, Downtime 0, Lunch 35 min (30 unpaid), Break 15 min, Changeover 0.
Fig. 7 The November 9 Shift Review table drawn for v2.186.0: one row per line, its POs under it. Its Break/Lunch column is the Lunch column now, and the Break in it would count in Downtime. The note under the table now says what the Changeover column counts. Planned Units reads “not planned” here only because this picture was drawn without the day's plan; the real report shows it.

Line 6B: one long changeover

  • Downtime 0 in the picture. Nothing stopped the line apart from its Lunch and a 15-minute Break. With the update that Break counts, so 6B now reads Downtime 15m.
  • Lunch 30 min. Logged with the right reason, so the 30 minutes came off pay.
  • Changeover 100 min, all into PO DEMO-08. The lead tapped Changeover at 10:57 and Start at 11:49, and the first pallet came at 1:10 PM. Less the time to build that pallet and the 30-minute lunch in between, that is 100 minutes, against a plan of 15.
  • What to ask: was the line really setting up until 1:10, or did it build without tapping pallets? The 12:00 hour shows no units. If set-up really ended earlier, a coordinator types the real minutes under Add changeover.

Line 1A: one PO all day

  • Changeover 0. One PO, so nothing to change over.
  • Lunch 35 min (30 unpaid). 35 minutes were logged; only 30 a day come off pay.
  • Downtime 0 in the picture. The line never stopped for anything but Lunch and a 15-minute Break, which now counts (Downtime 15m).

Line 4B: changeover logged as downtime

  • Downtime 23m, “Changeover 23 — Changeover from … to …”. The lead logged the set-up as downtime. That cancelled the measured changeover, so Changeover reads 0. From November 10 the tablet no longer offers Changeover as a downtime reason.

7. Before you submit

The report is built from Shift Review when you submit. Check these first. Each takes a minute and changes what the report says:

  1. Lunch on every line. A line reading “Lunch — not logged” in amber posts its lunch as paid. Add it in the line's Close & adjust, with the Lunch reason.
  2. Downtime reasons. Everything in Downtime should be a stoppage or a Break that really was logged. A lunch logged as Other shows as a stoppage. Fix the reason in Close & adjust.
  3. No Break to add. The two scheduled breaks are already out of the shift, so do not log them. A Break that is logged counts as downtime.
  4. Changeovers that look wrong. A changeover far over plan is flagged under Check before you submit. One of 0 to 3 minutes usually means the lead tapped Start at once. Type the real minutes under Add changeover (how).
  5. Shift Hours filled in. The report's headcount is worked out from it.

8. Questions

Why did Downtime change on past days in History?

History reads every day with the current rule. Lunch leaves the Downtime column, and a Break that was logged counts in it, so a past day with a Break logged now shows more Downtime and a lower Efficiency. Nothing that was posted changed: hours, pay and rates are the same.

Does this change anyone's pay or the posted hours?

No. Lunch still comes off pay the same way, a Break is still paid unless the site marks it unpaid, and run time and rates still take Lunch and Break off. What moves is the Shift Review: Downtime, Actual Labor Hours and Efficiency now count a logged Break. At Ferrara, where Breaks are paid, a line's Actual Labor Hours now equal the hours posted for it.

A Break was logged and the line's efficiency dropped. Is that right?

Yes. A logged Break is time the line was stopped, so it stays on the clock. A 15-minute Break with a crew of 11 adds 11 × 15 minutes = 2.75 labor hours to the line. If it was one of the two scheduled breaks, it should not have been logged: they are already out of the shift's hours.

Where did the Add break button go?

It is gone, together with the “Breaks — not logged” line. A missing Break is not a mistake to fix, because the scheduled breaks are already out of the hours. Add lunch is still there, because a missing Lunch changes pay.

The strip says 36 minutes between POs and the report says 2. Which is right?

Both, about different things. 36 minutes passed between the two POs. Beacon charged 2 of them as changeover; the rest counted as downtime or as run time. If the set-up really took 36 minutes, a coordinator can type 36 under Add changeover before submitting.

Can we get Production Units or Line Performance back?

Yes. An Admin ticks it in Settings (section 2). The next report shows it.

Is the email the same as the screen?

Yes. The email, Print and the History screen follow the same list of sections and show the same numbers.