Beacon how-to · November 2026

Changeovers, a fairer Efficiency, and Shift Review in the Daily Synopsis

Shift Review now shows each line's changeovers. Efficiency now counts the units you built, not just the hours. And the whole Shift Review table now comes with the Daily Synopsis: on screen, in Print and in the email.

  • v2.176.0

1. What's new

  • Changeovers on Shift Review. A strip above the table, one row per line. Read it
  • Efficiency counts what was built. A line that built less than planned now shows it. How it works
  • No more 0.00 hours on a PO row when the crew was typed on the roster at close. Details
  • The Shift Review table is in the Daily Synopsis, in Print and in every synopsis email. Where to find it
  • Two new tiles: Changeovers and Changeover time. On Checkpoint days, CPLH is called “Units per assembly hour”. Tiles
  • Margin % in the billing columns. Margin %
  • Admins choose what the Daily Synopsis shows for their site. How

Screenshots are from Beacon's dev site. The POs named DEMO-… and all their numbers are demo data, not real production. The release number is set when it ships.

2. Changeovers on Shift Review

Shift Review has a new strip above the table. It has one row per line. Each row says how many changeovers the line had and how many minutes sat between its POs. The header at the top adds up the whole shift.

Shift Review for 11/05/2026. The changeover strip header reads: Changeovers: 2, 4 min between POs, 45 min not charged. Line 1A: 2 changeovers, 4 min between POs, 45 min not charged (gap over 30). Lines 1B and 4A: No changeovers. Below it, the Shift Review table starts with lines 1A, 1B and 4A.
Fig. 1The changeover strip sits above the Shift Review table. Demo data from the dev site (POs named DEMO-…).
Example (Fig. 1)Line 1A ran three POs, so it had 2 changeovers. The gap before PO DEMO-1002 was 4 minutes. The gap before PO DEMO-1003 was 45 minutes. So 1A reads “2 changeovers · 4 min between POs · 45 min not charged (gap over 30)”. Lines 1B and 4A ran one PO each, so they read “No changeovers”.

What is charged and what is not

  • 30 minutes or less between two POs is charged to the POs. The 4 minutes on 1A are charged.
  • More than 30 minutes is taken off the posted hours as idle time. The strip calls it “not charged”. The 45 minutes on 1A are not charged.

Why it says “not measured”

For now, the minutes are only the gap between the end of one run and the start of the next. That is why Beacon marks them “not measured”. Set-up done after the new PO's run has started is not in them. Real changeover timing comes in a later update.

ExampleThe crew ends PO A at 10:00 and starts PO B at 10:04. Then they spend 20 more minutes setting up inside PO B's run. The strip counts 4 minutes, not 24.

3. Efficiency now counts what was built

Efficiency now compares the units built per labor hour with the plan's units per labor hour.

Before, it only compared planned labor hours with actual labor hours. It never looked at units. So a line that built half its plan in the planned time read 100%.

Real exampleOn 11/05, one PO was planned for 102 units. It built 56, with 36 labor hours. It read 66%, because the old number only saw that it took longer than planned. It now reads 36%, because it also sees that it built about half the plan.
Demo example (Fig. 1)Line 1B built 100 of 200 in exactly its planned 70 labor hours. The old way said 100%. It now reads 50%. Line 4A built exactly its plan, 80 of 80, but took 84 labor hours instead of 70. It reads 83%, the same as before.

What moves it, and what doesn't

  • Built exactly the plan: the same number as before.
  • More people, or took longer: still pushes it down.
  • Built less than planned: now pushes it down too.
  • A line with several POs: each PO counts by its planned hours. A PO planned for 30 hours counts three times as much as one planned for 10.
  • Starting counts (what you enter with Built before connecting) don't count toward Efficiency. Example: a line connects with 20 already built and builds 40 more. Efficiency uses the 40.

Older days

Shift Review works Efficiency out again each time you open a day. So an older day shows the new number too. Emails that were already sent keep the old number.

ExampleOpen 11/05 in Shift Review today and that PO shows 36%. An email sent before this update is not changed.

4. No more 0.00 hours on a PO row

Sometimes the crew is typed on the roster when the line is closed, and no run had a crew of its own. Before, the PO rows on that line showed 0.00 labor hours and Efficiency “—”.

Now those PO rows use the line's crew, the same crew the bill uses.

ExampleA lead closes a line and types its crew on the roster then. None of the line's runs had a crew. Before: every PO row on that line showed 0.00 hours and Efficiency “—”. Now: the PO rows take the line's crew and show their hours and Efficiency.

New in v2.195.0Actual HC shows the typed crew too

The hours already used the typed crew, but Actual HC on the PO row still showed “—”. That read as “nobody worked this line”, even with real hours right beside it.

Now Actual HC shows the number of people its hours were worked out from:

  • Crew entered on the tablet when the PO started: that crew, same as before.
  • Crew typed in Close & adjust: the typed crew, even if a crew was also entered on the tablet, because the hours and posting use the typed one. Hover the number and it says “Typed at close-out in Close & adjust. The hours and posting use this roster.”
  • No crew anywhere: still “—”.

The Daily Synopsis and its email show the same number. When any PO in the table has a typed crew, the note under the table adds: “Where a crew was typed at close-out in Close & adjust, Actual HC shows that crew, and the hours use it.” In the email, an Actual HC above Planned HC is still red.

Shift Review table rows for lines 1B and 4A and the PO row under 4A. The line rows show dashes for Actual HC and Planned HC. The PO row shows 80 actual units, 80 planned, 100%, Actual HC 12, Planned HC 10, 84.00 actual labor hours, 70.00 planned, Efficiency 83%.
Fig. 2The bottom row is the PO under line 4A: Actual HC 12, typed at close-out. 12 people × 7 hours = the 84.00 labor hours next to it. The line rows above still show dashes. Demo data from the dev site.
ExampleNobody entered a crew on the tablet when a PO started on line 6B. At the end of the shift the coordinator typed 18 people in Close & adjust. Before: the hours and the cost used 18, but Actual HC read “—”. Now: Actual HC reads 18. No re-post is needed. Open the day again, or send the synopsis again, and it shows 18.

5. The Shift Review table is now in the Daily Synopsis

The table you see in Shift Review now also shows in:

  • History → Synopsis → Daily Synopsis
  • Print
  • Every synopsis email

It shows only on days with Checkpoint lines. A day with no Checkpoint lines has no Shift Review table.

What is in it

  • Every Shift Review column, from Line to Downtime: units, % attainment, headcount, labor hours, Efficiency, run time and downtime.
  • Pallets.
  • Break/Lunch, for example “Lunch 30 · unpaid (30 off pay)”, “Breaks 1 · 15 min · paid” or “Lunch — not logged”.
  • Changeover: the changeover minutes going into each PO.

Two more things to know:

  • The Downtime cell shows the note typed with the downtime, for example “Mechanical 10 — jam on filler”.
  • Actual HC is red when it is above Planned HC. Example: Planned HC 12 and Actual HC 14 shows the 14 in red.
The Shift Review table inside the Daily Synopsis. Line 1A: 151 built of 170, 89%, 72.52 labor hours against 69.00 planned, Efficiency 85%, downtime 55m (Break 15, Mechanical 10 jam on filler, Lunch 30), 5 pallets, Lunch 30 unpaid (30 off pay), Breaks 1, 15 min, paid, Changeover 49 min. PO DEMO-1001: 56 of 60, Efficiency 92%, Changeover 0. PO DEMO-1002: 46 of 50, Efficiency 92%, Changeover 4 min. PO DEMO-1003: 49 of 60, Efficiency 66%, Changeover 45 min. Line 1B: 100 of 200, Efficiency 50%, Lunch not logged.
Fig. 3The Shift Review table in History → Daily Synopsis. Line 1A's 49 min of changeover is 4 min into DEMO-1002 plus 45 min into DEMO-1003. Demo data from the dev site (POs named DEMO-…).

6. New synopsis tiles and labels

On days with Checkpoint lines, the Daily Synopsis has two new tiles:

  • Changeovers: how many changeovers the day had.
  • Changeover time: the minutes, with the plan under it. It says “not measured” for now (why).

On those days the CPLH card is called “Units per assembly hour”. It is the same number with a plainer name. It divides by assembly hours (the Assembly column of the Labor by role table), not by Total Hours. In Fig. 3: 331 units ÷ 195.4 assembly hours = 1.7. Dividing by Total Hours (229.4) would give 1.44, which is not this number.

Daily Synopsis tiles: Total Headcount 34, Total Hours 229.4, Total VAS Units 331, Production Units 331, Non-Production Units 0, Units per assembly hour 1.7, Changeovers 2, Changeover time 49 min with plan 30 min, not measured. The Shift Review table starts below.
Fig. 4Example: 2 changeovers, 49 minutes, against a plan of 30. The card that used to say CPLH now says “Units per assembly hour”. Demo data from the dev site (POs named DEMO-…).

The email

When the email carries the Shift Review table, it gets wider (1220 px) so every column fits in a full-screen Outlook window. On a phone, the table scrolls sideways. Days without the table look exactly as before.

The synopsis email on a desktop. Changeovers 2 and Changeover time 49 min tiles, then Shift Review for Thu, Nov 5, 2026, with every column from Line to Changeover on one screen: lines 1A and 1B and their DEMO POs.
Fig. 5The email on a desktop. Every column fits across. Demo data from the dev site (POs named DEMO-…).
The same email on a phone: Daily Synopsis for Thu, Nov 5, 2026, the tiles stacked in rows, including Units per assembly hour 1.7, Changeovers 2 and Changeover time 49 min, then the start of the Shift Review table.
Fig. 6On a phone, swipe the table sideways. Demo data from the dev site (POs named DEMO-…).

7. Margin %

The billing columns now have Margin %: the margin divided by what was billed. The margin total shows its Margin % too. If nothing was billed, it shows “—”.

ExampleA PO billed $2,000 with a margin of $500 shows 25%. A PO with nothing billed shows “—”.

8. Choose what the Daily Synopsis shows (Admins)

  1. Go to Settings → Email Settings.
  2. Find the card Daily Synopsis — what to show.
  3. Untick a piece you don't want.
  4. Click Save Daily Synopsis.
Settings card: Daily Synopsis, what to show. Unchecked pieces are hidden on the History screen, in Print and in every synopsis email for this site. The numbers are still worked out. Headline: Overall Productivity, Total Headcount, Total Hours, Total VAS Units, Production Units, Non-Production Units, Units per assembly hour, Changeovers, Changeover time. Sections: Work Orders Summary, Cost and margin (totals and per-PO table), Stage work, Materials Breakdown, Labor categories, Labor by role, Line Performance, Quality Control Summary, Shift Review table. Save Daily Synopsis button.
Fig. 7The card in Settings → Email Settings, with every piece ticked. Demo data from the dev site (POs named DEMO-…).
  • It applies to the whole site: the History screen, Print and every synopsis email.
  • A hidden piece is still worked out. It is just not shown.
  • You can't hide everything.
  • Leads and below can see the card but can't change it.
  • The Weekly Synopsis doesn't follow these settings yet.
ExampleUntick Materials Breakdown and click Save Daily Synopsis. Materials Breakdown is gone from History, Print and every synopsis email for your site. To bring it back, tick it and save again.

9. Questions

Why did Efficiency drop on my line?

Most likely the line built less than planned. Efficiency now counts units, not just hours. Example: line 1B in Fig. 1 built 100 of 200 in its planned hours. It used to read 100%. It now reads 50%.

What does “not measured” mean?

The changeover minutes are only the gap between one run ending and the next starting. Beacon does not time the set-up yet. Set-up done after the new PO's run starts is not in the minutes. Real changeover timing comes in a later update.

Why does Line Performance still say “Unknown” at Ferrara?

Posted hours don't carry the line yet. This release doesn't change that.