Beacon how-to · November 2026
Productivity now counts Line Captains and changeover
Overall Productivity divides by more of the hours the crew really worked. Line Captain hours and changeover hours are now in it, the same way downtime already was.
- v2.189.0
Screenshots are from Beacon's test site. The orders in them (DEMO-2294, DEMO-2295) are demo data.
1. Patch notes
v2.189.0 Nov 2026
- Line Captain hours count in Productivity. A Line Captain is an assembler at a higher pay rate, so their hours are assembly hours now. Every Line Captain record Ferrara posted since Oct 20 was corrected too. More
- Changeover counts like downtime in the synopsis. Overall Productivity, Units per assembly hour, Materials and Line Performance now keep changeover hours in the hours they divide by. Example
- Productivity reads lower, because it divides by more hours. At Ferrara, Nov 9 goes from 58.8% to 52.4% and Nov 10 from 111.6% to 105.5%.
- Start-up, Lunch, LTO and QA stay out. Why
- Plan vs Actual, the rate check and margin by SKU still leave changeover out.
- Pay, cost, billing and Total Hours do not change.
2. Line Captain hours count
Each role has a setting, Counts toward productivity, in Settings → Labor Rates → Roles (open a role with its arrow). Temp Line Captain was set to Assembly hours entered separately. With that setting, only hours someone types as assembly count. Nobody typed any, so every Line Captain hour posted as 0 assembly hours and Productivity never saw them.
Temp Line Captain is now set to Every hour is assembly, the same as Temp Assembler.

- The 35 Line Captain records already posted (Oct 20 to Nov 10, 296.78 hours) were corrected the same way, so past days read like new ones.
- Shift Review no longer shows an assembly-hours box for Line Captain. There is nothing to type.
- Shift Review Efficiency already counted Line Captain hours. Now Productivity counts the same people.
3. Changeover counts like downtime
Changeover hours are the changeover minutes × the crew on the new PO. Before this release, the synopsis took them out of the hours its rates divide by. Now they stay in, the same as downtime.

6 people and a 40-minute changeover into PO DEMO-2295 make 4.00 changeover hours. The day has 30.00 hours in all. The synopsis used to divide by 26.00. It now divides by 30.00.
If a line logs the changeover as downtime instead of tapping CHANGEOVER, Productivity comes out the same, because both sets of hours are in it. The Changeover figures on the report still only show tapped changeovers.
4. What still stays out
- Start-up. The morning start-up hours still leave Productivity.
- Lunch. It's unpaid, so it's never posted.
- LTO and QA. They post no hours to a line.
- Plan vs Actual, the rate check and margin by SKU still leave changeover out. They compare the running against a rate, and the plan has its own changeover time.
5. Questions
Did past days change?
Yes. Because the Line Captain records since Oct 20 were corrected, past days read lower too, and the trend stays like for like. Synopsis emails that were already sent keep the numbers they had.
Did pay, cost or billing change?
No. Line Captain and changeover hours were always in pay, cost, Total Hours and billing. Only the hours Productivity divides by changed.
Why does Plan vs Actual still leave changeover out?
Plan vs Actual asks whether the run kept to its rate. The plan gives changeover its own time, so counting it again in the run would charge it twice.
Why is the executive Units per assembly hour different from the synopsis?
The executive dashboard still leaves changeover out. On a day with a changeover, the two differ by the changeover hours.