Beacon Production Workflow

From the customer's schedule file to verified labor hours — who does what, in what order, and the rules that keep the numbers honest. One page for the whole team.

The process at a glance 1 · Import the schedule 2 · Plan the week 3 · Run the line 4 · Close out the line 5 · Shift review & reconciliation 6 · Submit to the Hour Tracker 7 · What flows automatically The three rules that protect the numbers

The process at a glance

Production workflow swimlanes Three lanes: Coordinator, Line Lead, and Beacon automatic. Steps flow from schedule import through planning, running, close-out, review with an all-lines-closed decision, to the hour tracker and reporting. COORDINATOR LINE LEAD BEACON — AUTOMATIC 1 · Import schedule weekly file → work orders Engineered hours per order, from standards 2 · Plan the week Suggest → adjust → save Run queues + targets per line, per hour 3 · Connect & run tablet: tap per pallet SAAG board live TV per line, takt conveyor 4 · Close out line headcount by role 5 · Shift review headcount by role + verify All lines closed out? NO → fix first close + adjust from terminal, or lead finishes on tablet 6 · Submit hours YES → writes Hour Tracker 7 · Reporting flows History · Synopsis · KPI plan vs actual

1Import the schedule

Coordinator

Drop the weekly production file into Build Schedule → Import Schedule. Beacon finds the headers wherever they sit in the file, applies the saved column mapping, and skips any PO already live in the system — re-importing never duplicates work.

The moment orders land, Beacon computes each one's engineered hours — the total labor the build requires at our standards — visible right in the schedule table. If an order's material isn't in Beacon or has no recipe, it's flagged immediately with a link to fix it. Nothing untimeable hides.

2Plan the week

Coordinator

In the Labor Planner, either drag orders from the tray onto lines by hand — watching cases-that-fit update live before committing — or press Suggest Schedule and let Beacon draft the whole week. The suggestion setup asks:

The draft appears unsaved: review it, drag anything, undo it entirely, then Save. The saved plan becomes each line's run queue and the hourly targets on every SAAG board.

3Run the line

Line Lead

The lead signs into Beacon on the line tablet, opens Checkpoint, and takes their line from the connect screen (one line per tablet — taking over another lead's session is a clean two-tap handoff; counts are never lost). The console is deliberately simple:

The line's TV shows the SAAG board live: this hour's attainment, ahead/behind plan in cases, UPH against the SKU standard, the hourly record, and the takt conveyor — a case or display glides across every time one should have been built at standard rate, ghosted when the line is behind. Targets come from the group's standard crew rate; nobody types an expected number.

4Close out the line

Line Lead

At the end of the line's work, the lead hits Close Out on the tablet. Beacon shows the session summary — cases, pallets, downtime, and the active time, measured from the session itself, not remembered or typed. The lead is asked for the line's headcount by role — the same roles the Hour Tracker uses, with the total shown live as they enter it.

Line hours per role = the lead's role count × the measured active time. Submit sends the line's record to the coordinator's queue. The lead is done.

5Shift review & reconciliation

Coordinator

The coordinator's review screen shows every line's closed-out record: cases built, hours, downtime, notes. Here the coordinator enters the total headcount for the entire shift, by role — exactly as the Hour Tracker works today.

The open-line gate: if any line was active and its lead did not close out, the coordinator cannot submit. Beacon names the open lines and offers two fixes: close it from the coordinator terminal (adjusting the time as needed), or have the lead finish the close-out on the tablet. No exceptions — an open session means the hours aren't real yet.
The floater rule, per role: the coordinator's shift total is the truth for labor, role by role. If the lines' counts for a role add up to more than the shift total for that role, the overage is people who floated between lines during the day — real work on each line, but not extra bodies. Beacon shows the difference per role and does not count floaters against the total.
Worked example
SourceHeadcountMeaning
Line 1A close-out18lead's count for 1A
Line 1B close-out18lead's count for 1B
Lines combined36sum of line records
Coordinator's shift total34actual people on the floor
Floaters2worked both lines; counted once

6Submit to the Hour Tracker

Coordinator

With every line closed and the numbers verified — cases built, hours, headcount by role — the coordinator submits. Beacon writes the day's record exactly as the Hour Tracker does today: same data, same destination, but built from measured line sessions instead of end-of-day memory. Every PO carries its own hours, cases, and crew — a day with three orders on one line splits its labor across all three, never piling onto the first.

What changed and what didn't: the Hour Tracker's output is unchanged — every report downstream keeps working. What changed is where the numbers come from: pallet taps and measured session time instead of recollection. The coordinator's role shifts from data entry to verification.

7What flows automatically

Beacon — automatic

The three rules that protect the numbers

Beacon VTS · Production workflow · updated 2026-07-23 — flows marked "Beacon — automatic" require no action from anyone.